Rana Ali Page *
Email: ****-*******@*******.***
DHA-Phase 8 Ex Park View Lahore
MECHANICAL ENGINEERING PROFESSIONAL
Technically sophisticated, highly analytical and safety conscious Mechanical Engineer having 8-years with hands-on experience and strong educational background in Fire-fighting, Plumbing, and HVAC. Inspection, Installation, Procurement, shop drawings, planning & maintenance of commercial and residential buildings. Highly skilled in preparing, evaluating and reviewing all necessary construction technical documents required to be implemented on site. An articulate and refined communicator can effectively collaborate with colleagues, and senior management and the ability to translate leadership vision into executable plans for teams to follow. CORE COMPETENCIES
Construction Shop Drawings Testing & Commissioning
Residential Projects Support Material Management Quality Assurance
Commercial Projects Materials & Fittings Take Off Daily Production Reports
Data Centre Project Health & Safety Standards Cross-Functional Leadership PROFESSIONAL EXPERIENCE
1- Project Engineer in UEC (United Engineers & Contractors) Pvt Ltd. August 2019 – Continue
Client: DHA (Defense Housing Authority) Lahore
Consultant: Ammad Anwar & Partner
Project: Community Club B+ G+1 DHA Phase 8 Ex-Park View Lahore Responsibilities (Fire Fighting, Plumbing and Chilled Water system HVAC)
Responsible for installation/Procurement/approval of all Chilled water work including MS piping & Insulation with fiber cloth, Trane FCU’s, WFCU’s and CFCU’s with valves, Cooling Tower, 3 Trane chillers each of 160 ton capacity, 3 condenser pumps, 3 chilled water pumps, Expansion tank of 500 gallons, air separator, chemical feeder 50 liter and all valves as per approved drawing.
Responsible for installation /Procurement/approval of all Ducting work including supply, fresh air, ERV’s, VCD’s & insulation with fiber cloth, kitchen MS exhaust duct with wool insulation and dehumidifier for swimming pool area.
Responsible for installation /Procurement/approval of all Fire Fighting work including pipeline, valves, Pressure Testing, no. of sprinklers, Hose reel, Hydrants (HDPE pipe), Zone Check Assembly, fire pumps
(500 gpm) and 2-way Breeching Inlet as per NFPA standard/approved drawing.
Responsible for installation /Procurement/approval of all plumbing work water supply, drainage, storm water, RO pipe line, Bore 400ft with submersible pump for tank filling and all finishing items as per client requirements/project specifications
Responsible for arrange/ submit/approve submittals of all required items.
Responsible for Hire/manage working team/sub-contractor to deliver the project on time.
Responsible for generating RFI (Request for inspection) and submit to QS for IPC. Client: IDAP (Infrastructure Development Authority of Punjab) Consultant: IDAP (Infrastructure Development Authority of Punjab) Project: PFSA (Punjab Forensic & Science Agency B+G+2) RANA ALI RAZA
Rana Ali Page 2
Responsibilities (Fire Fighting, Plumbing and VRF system HVAC)
Responsible for installation /Procurement/approval of all Fire Fighting work including pipeline, valves, Pressure Testing, no of sprinklers, Hose reel, Hydrants, Zone Check Assembly, fire pumps (1000 gpm) and 4-way Breeching Inlet as per NFPA standard/approved drawing.
Responsible for installation /Procurement/approval of all plumbing work water supply, drainage, storm water, RO pipe line, Bore 500ft with submersible pump for tank filling and all finishing items as per client requirements/project specifications.
Responsible to arrange/ submit/approve submittals of all required items as per project specifications.
Responsible to Hire/manage working team/sub-contractor to deliver the project on time.
Responsible for generating RFI (Request for inspection) and submit to QS for IPC.
Responsible for coordination between subcontractors (Glace) & UEC for HVAC work. 2- MEP Site Engineer in Brixtech consulting Pvt Ltd. Mar 2019 – July 2019
Client: Adamjee Insurance Company Limited
Contractor: CNS Engineering
Project: Adamjee Insurance Head Office Data Center Gulberg 3 Lahore Responsibilities
Responsible for all installations of data center Fire Suppression system, Fire alarm, VESDA, precision cooling system (CRAC), UPS, Plumbing, Civil & electrical work.
Monitor Circuit Wiring and conduiting for all services with Cu/LSZH insulated cable.
Monitor Drilling of earth bore 3" (75mm) dia up to water table (up to 100ft), back filling, ramming.
Monitor Switchgear panel Boards for HVAC, UPS. Lighting and MDB’s.
Monitor Low voltage distribution equipment’s sockets, load break switches 20A, 35A & 55A and industrial sockets.
Monitor 1 x 30 APC kVA UPS; online double conversion, 60 min backup time on full load with Maintenance Bypass and Static Bypass.
Monitor Low current work, communication racks.
Monitoring of Intelligent Microprocessor controlled networkable Addressable type 2 Loop Fire Alarm Control Panel (FACP) 2-core 2.5mm shielded standard 60 minute fire resistant cable.
Monitor installation of Multi Smoke + Heat detector, Manual Call Point, Horn Strobe, Release Station/Pull Station.
Monitor Fire stopping work for all openings, fire extinguishing system & fire blankets.
NOVEC-1230 (2 Nos.) 50 liter High Pressure Seamless Steel Cylinder with Bracket Assembly for power room (360 degree brass discharge nozzle).
NOVEC-1230 (2 Nos.) 80 liter High Pressure Seamless Steel Cylinder with Bracket Assembly for server room (360 degree brass discharge nozzle).
Monitor domestic water piping for cold water and hot water supply and return as per DIN 8077/8078 PN20 for pipe and DIN 16962 PN25 for fittings or equivalent BS specifications.
Monitor Raised Floor tiles 600mmx 600mm with antistatic with high pressure laminated scratch resistance finish and UL Approved 90 min fire rated, access controlled powder coated steel door with automatic closer & vision panel.
Perform PAT (Provisional acceptance test) for 2-Stulz (33.5KW) 9TR down flow type air conditioning units for server room and 2 (8.5KW) 2.5 TR front flow type units for power room.
Refrigerant piping with foam insulation of different diameters. Rana Ali Page 3
Perform PAT (Provisional acceptance test) for EMS (Environmental monitoring system).
Perform PAT (Provisional acceptance test) for IP BASED ACCESS CONTROL SYSTEM –Brand Bosch
(Single door Electromagnetic, Door Panic/Push bar, Push Button (Exit Switch), Manual Key, Door Siren)
Monitor Room Signs & Name Plates.
Prepare sang list and send it to contractor to follow quality standards. 3-Mechanical Site Engineer in Aroom Consultant LLC Dubai, UAE Feb 2015 – Jan 2019
Client: Schon Properties LLC Dubai, UAE
Contractor: PGS Gulf Contracting LLC
Project: Dubai Lagoon Project DIP-1 Dubai-UAE
Key Accomplishments
Ensured quality and constructions in compliance with drawings, specifications, and local regulations, as well as the installations are as per the approved mechanical shop drawings and project specifications.
Supervised and performed regular inspection on drainage, plumbing, firefighting, chilled water and ducting works etc.
Coordinated with contractor, client, and sub-contractors, arranged manpower, material, tools & machineries as per project requirement, monitored task assigned to site staff, reported progress of work to the MEP manager.
Completed the project as per target program & in budget cost, ensured smooth execution of projects, track & control on material labor output, utilization of site resources effectively, ensuring safety & quality as per the company standards.
Approved Workshop drawing if comply with project requirements.
Inspection, Testing & Commissioning of Ducting supply, return, exhaust, fresh air, VCD, FD, MFSD, Grills, Diffusers, and chilled water pipes, BTU meters, cooling towers, Evaporative coolers, FCU, AHU.
Inspection, Testing & Commissioning of FAHU, VAV, package/DX system, ETS (energy transfer system), Ventilation Fans, SWPF, Chillers, CHW Pumps, BMS Control and Control Valves,Precession cooling system for data Centre etc.
Check the IPC provided by contractor and makes the cutting as per actual work.
Check and verify the submittals as per project specifications provided by contractor.
Inspection, Testing & Commissioning of all Fire Fighting work including pipeline with groove fittings, valves, Pressure Testing, no of sprinklers, Hose reel, Hydrants, Zone Check Assembly, fire pumps (1500 gpm) and 4-way Breeching Inlet as per NFPA standard/approved drawing.
Inspection, Testing and Commissioning of Water supply Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank, Water Heater, Booster Pump, Transfer Pump, Sump Pump, water Heater and sanitary items selection &, Materials, Fittings and Valves etc.
Visit site on daily basis and check the quality of work.
Maintain the record of daily man power and material delivered on site.
Inspect the physical samples of material and give instructions as per project specifications.
Write the letter to contractor on quality issues and ensure project time line.
Investigate defective parts of material and write the letter to contractor to replace the material.
Ensure the warranty/FAT/shipping documents of import material.
Ensure the installations are in safe mode during off after the installation.
Keep record in form of pic/videos of any valuable work.
Attend the meetings and make sure to follow the minutes of meeting.
Prepare Sang list and raise in meeting to ensure quality.
Check RFI’s and concludes status as per requirements/project specification.
Check IPC and make deduction as per actual work and signed only work done for payment process. Rana Ali Page 4
4- Assistant Engineer in Al-Hassanain M&P Contracting Feb 2013 to Dec 2015
Client: Mr. Abdul Qavi
Project: Azan Heights B+G+6 Sahiwal, Punjab Pakistan Consultant: Rahbar Consulting Services
Responsibilities (Fire Fighting, Plumbing and HVAC)
Supervise firefighting, plumbing and ducting work on site and make sure all work is going on as per approved drawings.
Ensure material is available on site.
Responsible for coordination between civil and mep work.
Check the number of persons of sub-contractor working on site.
Prepare daily manpower report.
Prepare demand of required material and submit to project engineer.
Prepare check requests and RFI’s for work approval.
Assist to the project engineer for smooth work.
Prepare work progress excel sheet on weekly and monthly basis.
Manage all essential drawings/documents and provide to sub-contractors during work. Educational & Other Credentials
Bachelor of Science in Mechanical Engineering CGPA 3/4: University Of Lahore, Lahore, 2012 F.S.C (Pre-Engineering) 856/1100: BISE DG Khan, 2008 Professional Membership: Member of PEC (Pakistan engineering council) • Mech/27325 Attestation: Engineering degree attested from HEC & Foreign affairs of Pakistan Professional Affiliation: Member AOTS (The Association for Overseas Technical Scholarship) Technical Training: AutoCAD and all Windows 95 to windows XP and server based Gulf Attainment
Professional Membership: Member of society of engineers UAE Attestation: Attested engineering degree from UAE embassy Certification: NAFFCO certification in installation of firefighting system Certification: ASHRAE Certification in installation of HVAC System Training: 3-weeks Dubai Municipality Training course in installation of plumbing system Training: 4-days Training session of fire protection system organized by civil defense Dubai-UAE Declaration
I hereby declare that all the information mentioned in my resume is true and correct to my knowledge and I take full responsibility for the accuracy of the particulars mentioned. Rana Ali
Rana Ali Page 5