Experience:
Carollo Engineers, Inc. **/**/**** -Present
San Jose, CA
Project Type: Public- Location: San Jose- Program Amount: $ 1,4B-Projects Amount: $ 6M-$ 135M
Project: San José-Santa Clara Regional Wastewater Facility (Cogeneration, Digested Sludge Dewatering, Plant Instrument Air System Upgrade, Headwork, Aeration Tank and Blowers, Digester & Thickener)
Program/Construction Scheduling Manager (Interact with management team, project managers, lead consultants and contractors, manage and lead project control team and project managers, develop and update Primavera resource and cost loaded schedules, create WBS, monitor resources, cost, and schedule, change management, report monthly KPI metrics, prepare monthly program master schedules, progress status and variance reports, update actual vs budget and forecast cost and schedule, update management for the projects progress, constructability review,earned value management, cash flow analysis, Risk and interface evaluation and management, review estimates, review and validate the consultant and contractor schedule, cost, and status reports, implement the program and project controls standards, design and implement reports, prepare specification for CPM schedule, cost and monthly update reports, perform schedule and cost risk analysis, review schedules and perform schedule claim analysis for time extensions change orders, develop lessons learned for projects)
Pacific Gas and Electric 08/16/2010 -8/15/2014
San Ramon/San Francisco, CA
Project Type: Private-Location: Multi-locations- Program Amount: $ 1B-Project Amount:$10M-$ 200M
Projects: Facilities (Power Plants, Manufactured Gas Plant, Corporate Real Estate, Substations)
Supervisor of Project Control /Sr. Project Control Analyst/Scheduler (Environmental Remediation Project Control Dept.) ((Interact with management team and project managers, develop scope of work with project managers, review estimates, Primavera administrator, create and update schedules, Manage resource and cost loaded schedules, report monthly KPI metrics, Risk and interface evaluation and management, review estimates, review and validate the consultant and contractor schedule, variance explanation and corrective action plans, prepare the projects progress report, monitor and control the program contracts and internal labor, monitor PMIT projects, lead Sarbanes Oxley(SOX), improve business procedure and processes, design and implement reports automation, review projects’ schedule, risks, and issues, lead the Financial Assurance, develop Remediation Index (Risk Reduction), create different type of reports and logs, monitor and manage projects closeout.)
Southern California Edison (Project & Construction Management) 06/16/2008 -01/4/2010
Rosemead/Irvine, CA
Project Type: Private/Facilities-Location: Southern California Territory- Amount: $1M-$ 35M
Project: Data Center, Substation, Office Building, Training Academy, Airport Hanger, and other projects
Sr. Estimator (Project Control Dept.) (Develop and finalize scope of work, lead stakeholders, prepare ROM to 100% CD estimates, constructability review with construction management team, prepare project budgets for 2012 GRC(general rate case for CPUC), type of work includes TI work, or new construction.)
Project &Construction Manager (Construction Dept.)(Manage contractors, constructability review, lead field meetings, Manage project’s cost and schedule, review and pay invoices, manage multiple projects, control risks and resolve issues, report and discuss the project progress to leadership, project close out.)
Cost Estimator/Analyst (Operation & Planning Dept.) (Develop scope, estimate, and schedule for new capital projects, prepare budget and schedule for the projects, set up work orders in SAP, budgets, schedules and materials needed for capital and maintenance projects, create Unit Estimate for capital project in SAP, build Unit Estimate and WBS in Project Builder, resource planning and implementation of work orders, cost control and review invoices, assist operation & planning team for closing of old requests before SAP go alive, create different type of reports and logs.)
KDG Development /CH2MHILL (Construction Management) 09/10/2007-06/13/2008
Los Angles/Pasadena, CA
Project Type: Public- Location: Los Angles- Amount: $ 268M
Project: South Airfield Improvement Project (LAX-SAIP)
Sr. Estimator/Project Engineer (Assist LAWA PM, CM and Field Engineers to evaluate of FMs, COPs and RFIs cost (T&M, forward pricing, regular pricing), analysis cost proposals for FMs, COPs in different trades, negotiate and finalize with prime and sub-contractors in all trades, track actual cost vs. budget, quantity take off and prepare independent cost estimates for audit, request revision of cost proposals with prime and sub-contractors per finalized price, review project schedule with the scheduler, create different logs and reports.)
Huitt-Zollars Inc. (Design & Construction Management) 01/01/2007-09/08/2007
Westlake Village, CA
Project Type: Private/Public-Location: Van Nuys, Irvine, and Oxnard
Project: Van Nuys Airport Maintenance yard Amount: $ 1.2M, Shopping Center, Tract Home Development
Construction Manager/Estimator/Scheduler (Oversee daily operation, coordinate inspections, review and analyze COPs, review and analyze the prime contractor’s schedules, and negotiate with contractor.)
Designer/Drafter (Assist PE engineers in the performance design of detailed civil engineering design work related to Residential, Airport, and Commercial land development projects, prepare sewer, water, storm drain, and grading profiles, hydrology, prepare cost estimates for clients)
Forma Engineering Inc. (Design) 01/29/2006-10/18/2006
Northridge, CA
Project Type: Private Development-Location: Lancaster, Tehachapi, Palmdale, and Bakersfield
Projects: Active Adult Community/Tract homes/Commercial/ /Residential Development
Staff Engineer (Assist PE engineers in the performance of detailed civil engineering design work related to Residential /Commercial/Public land development projects, surveying, on site analysis, prepare sewer, water, storm drain, grading, hydrology, erosion and street plans, lot fit analysis, DRE exhibits, tract maps, designed sewer/storm drain profiles, design of water systems in Water Cad and prepare cost estimates.)
Barazani Pave Stone (Sub Contractor) 01/24/2005-02/10/2006
Chatsworth, CA
Project Type: Private/Public-Location: California- Amount: $ 10K-$ 2M
Projects: Irvine Spectrum, Fashion Island, Pelican Hills Golf Club, and other projects.
Sr. Estimator/Commercial Director Project Support (Estimate, budgets, and bid proposals, bid on projects, site measurement, quantity take off with scale, digitizer, and different soft wares, draw plans, meet, communicate, and negotiate with different stakeholders, manage projects from beginning to closeout)
Shawnan (Prime Contractor) 11/15/2002-12/15/2004
Downey, CA
Project Type: Public-Location: OC, Riverside, and LA County-Amount: $ 500K-$ 125M
Projects: Port of Los Angles Berths 91-93, Brand Boulevard in City of Glendale, and other projects
Project Manager /Project Engineer (Manage Subcontractors, Negotiate Contracts, Manage multiple projects, with contractor, Assist sr. estimator to prepare bid packages and assist project managers to manage the construction projects, prepare bid proposal and bond, walk-in job site, bid, quantity take off, estimate, coordinate and negotiate with sub-contractors.)
Mahab Ghods Co.(Design, Construction Management, Contractor) 06/15/2002-9/15/2002
Tehran-Iran
Project: Private-Location: Tehran/Iran-Type: Building-Amount: $1M
Project : Public -Location: Khuzestan/Iran-Type: Dam -Amount: $12M
Project Manager (Work in the performance of detailed civil engineering project, contracting and construction, manage job site staff, superintendents and crews, prepare daily management reports, communicate and negotiate with subcontractors, control materials and process quality, develop cost estimates and budgets, review and finalize RFI and change orders, review and revise project forecasts with manager and team, Calculate CPI, SPI, and EV.)
Borg Design consultant (Design & Build) 08/16/00-05/15/02
Tehran-Iran
Project: Private- Location: Tehran/Iran-Type: 4-8 Story Buildings- Amount: $ 36K-$50K
Project: Public-Location: Shahr-e-Ray-Type: Water Treatment (Lagoon System)- Amount: $ 150K
Project and Construction Manager/Designer/Drafter (Manage scope, cost, and schedules, contract projects, plan estimates and schedules, assist in the performance of detailed civil engineering work related to designing concrete & steel building structures, water treatment structures (lagoon system) under super vision of sr. engineer, drafting, and analysis cost of material.)
Artaz consultant (Design & Build) 10/15/96-08/03/00
Tehran-Iran
Project: Private- Location: Tehran/Iran-Type: 4-6 story Buildings-Amount: $ 25K-$36K
Drafter (Draw from schematics to AutoCAD files, estimate materials, prepared cost bid packages and assist with the design of steel and concrete structures under supervision of design engineer.)
Skills:
Project Management, Develop scope, budget, and project schedule, Manage and Monitor project budget and schedule, Manage Team, Review and Pay Invoices, Lead Meetings, Resolve Issues, Monitor Risks, Lead Staff, Resolve Conflicts in teams, Project Close out, Lead Safety Initiatives
Construction Management and document control, Specification, Estimating(Heavy Civil, Utility, facility, Remediation, Wastewater, Residential, Commercial, Office, and Industrial), Negotiations, Bidding, Design-Build, Design-Bid-Build, EPC Contracts, FM, RFI, CO, QC and Inspection Reports, Certified Payroll, Closeout Bid Items, Quantity take off
Program/Project Control Budgeting, Scheduling, (Resource and Cost loaded, CPM,WBS), Cash flow analysis, Forecasting (EV, SPI, CPI), KPI, Risk Management, Interface Management, Claim Analysis
Design and draft drawings for land development civil work and structures projects
Software Skills:
Primavera P6 15 -20 (EPPM), Contract Manager 14(Expedition), MS Project 2010, BI Publisher, Deltek Acumen Fuse and Risk 6.1.0, EADOC, Oracle Primavera Risk Analysis, PrimaViewer
.MS Office Professional software 2003-2010(word, excel, outlook, power point, Visio, access),
Estimating Soft wares (On-Screen Take off, ISQFT, Timberline Estimating, RS-Means, Auto CAD, HCSS),Blue Beam
AutoCAD different version (2000-2007), AutoCAD Land desktop and Map( 2005-2007), Solid Work, Water CAD, GIS
SAP, SAP Business Warehouse, Master Builder
Education:
B.S. Civil-water Engineering Tehran-Iran Graduated in August 28, 1999
Construction Management UCLA Los Angles-California Completed on April, 2007
Certificate:
Deltek Acumen Risk in June, 2015
Oracle BI Publisher 11g R1 in December, 2011
Advanced Project Management in Primavera P6 in March, 2010
Project Management in Primavera P6 in March, 2010
Project Management Professional (PMP) in November2020
OSHA 10 Hours in June 2020
OSHA 30 Hours – Construction
Provisional Certification for Adult First Aid CPR/AED
Licensure:
Engineer-In- Training (EIT) on April, 17 2010
Professional Engineer (PE in Civil Engineering) note: in progress
Membership:
AACEI- California Sections Member (2008-2021) and Officer (2009, 2011, 2012, 2013)
ASCE- Member (2012-2021)
PMI- Member (2012-2021)
Languages:
English, Armenian, Farsi (Persian)