Post Job Free

Resume

Sign in

Electrical Engineer Mechanical

Location:
Manila, Philippines
Salary:
Employer standard rate/Negotiable
Posted:
April 06, 2021

Contact this candidate

Resume:

TO: MANAGER

Applicant:Renato Alcansare Somoso

Mobile No. +639*********/+639*********

Email: adlglh@r.postjobfree.com

Position:ELECTRICAL ENGR. DESIGN & SITE

I am Renato A. Somoso,Want to apply in your good office which fit to my work experienced.I have a total of twelve years experience in the field of engineering both electrical and mechanical works and installation.I have a knowledge in lighting and power,switchgear,transformer,generators,A.T.S,medium voltage,low voltage system,panel boards,electrical motor,power protection relays and low current system such us cctv,telephone,and fire alarm system,public address system & alarm bell.Experience in plc, solar power system,Ac indoor & outdoor unit installation split & cassette type,responsible of supervision for ducting installation,plumbing,fire fighting pipe system installation,chiller piping installation,electric motor & mechanical pump setting alignment.Electrical Engineer in Fajr Construction company for Grain Silo Flour Mills Organization(Riyadh,K.S.A),Handling also mechanical works at the hospital and intelligence building inside the airbase of the said company.Same duties and responsibilities of my previous.The Anmaz International Company(Riyadh,K.S.A),Mostly my duties and responsibilities are as follows:Electrical design,site management,supervision of men working on site,technical supervision,site coordination of other related trades of Civil,Architectural,Mechanical and Electrical works layout, checked daily the materials used in the project for tomorrows work and follow up requested materials to the materials control section (M.C).Employed in YSL Builder Contracting Company (Philippine) to which I established and render a good service for the benefits of the company,assist cost estimate,scheduling and time management for the completion of the project before the duration date.I was employed also at Welmar Edible Oil’s Phil. Inc.,Assign in Maintenance Department as assistant for Eletrical & Mechanical including Hexine Plant,Oil Mill,Refinery & Conveyor such us;mechanical pump including piping and other equipment,assist the maintenance of oil separator,heat exchanger,condenser,electrical motors control etc.Had experience also in Mindanao State Timber Corporation,Maintenance Department.As power tender,planner and electrical technician.I have a knowledge also the latest version of autocad 2019 2d,3d,fusion 360 and the very essential engineering software including cad and Ms office excel word documents.

I attached my CV for evaluation purposes regarding my work experienced SO you can assign me the best position to which I am very qualified.

Renato A. Somoso

Very Truly Your’s

Curriculum Vitae of Renato A. Somoso

PERSONAL DATA:

NAME :RENATO A. SOMOSO

PHILIPPINE ADRESS :RAMON MAGSAYSAY SINDANGAN

ZAMBOANGA DEL NORTE PHILIPPINES

NATIONALITY :FILIPINO

CIVIL STATUS :SINGLE

SEX :MALE

HEIGHT :5’3”

WEIGHT :123lbs

S.S.S.NO. :34-107664

Philhealth.NO. :14-200796495-0

Pag-Ibig No. :121*-****-****

COURSE :B.S. ELECTRICAL ENGINEERING

CHILDREN : RENA CHELSEA

: RENZ WILLEM

: LUCKY RENZ OLYM

FATHER’S NAME :OLYMPIO J. SOMOSO SR.

MOTHER’S NAME :LEDENILA A. SOMOSO

CONTACT PERSON :RENATO A. SOMOSO

MOBILE/CELL NO. :+639*********/+639*********

EMAIL ADDRESS :adlglh@r.postjobfree.com

EDUCATIONAL ATTAINMENT:

B.S ELECTRICAL ENG’G :ANDRES BONIFACIO COLLEGE

1999-2004

DIPOLOG CITY,ZAMBOANGA DEL NORTE

PHIIPPINES

YEAR GRADUATED :MARCH 22 2004

B.S. ELECTRONICS & :CAGAYAN DE ORO COLLEGE

COMMUNICATION ENG’G :1997-1999

CAGAYAN DE ORO CITY,PHILIPPINES

SECONDARY :SINDANGAN NATIONAL HIGH SCHOOL

1992-1996

SINDANGAN ZAMBOANGA DEL NORTE

PHILIPPINES

ELEMENTARY :PHILIPPINE ADVENT COLLEGE

1986-1992

SINDANGAN ZAMBOANGA DEL NORTE,PHILS.

NAME OF COMPANIES EMPLOYMENT RECORD:

1.Latest – Contractor

Own Management:

Year : 2018 - 2019

2.Fajer Construction Company & Maintenance (Riyadh,K.S.A.)

Year: 2015 – 2018

Position 1: Electrical Engineer

For a newly constructed Grain Silo Flour Mills Organization and undertakes all maintenance facility

after handling over to client.

Position 2: Handling also as Mechanical Site Engineer of the Hospital Project and Intelligence

Building inside the airbase of the same company located at Khamist Mushayt (K.S.A.).

3.YSL Builder Contracting Company (Dipolog City,Philippines).

Year: 2012 – 2014

Position : Project Engineer

4.Anmaz International Company (Riyadh,K.S.A).

Year: 2009 – 2012

Position : Electromechanical Site Engineer/Supervisor.

5.Welmar Edible Oil Philippines Incorporation(Oil Plant)(Nabilid Roxas,Dipolog City.Philippines)

Year: 2007 – 2009

Position : Maintenance Department (Electrical/Mechanical)

Area covered of responsibility:

Oil Mill

Conveyor

Hexine Plant

Refinery Plant

Includes: Expeller,Mechanical pump,Heat Exchanger,Electrical Motors & Control.

Assist the Maintenance of Oil Separator & Assist the operation of Refinery Plant

6.Contractor : Self Employed/Own Management

Year: 2005 – 2007

Contract Includes: Building wiring,Plumbing,Grills,Steel Gates,Steel Window,French Window

Fence Grills and Glass.

7.Mindanao Estate Timber Corporation(Plant)(Sindangan,Z.N.Philippines)

& Iron Ore/Chromite Mineral Crushing Plant

Year: 2004 – 2005

Position: Maintenance Department For Electrical

Planner & Power Tender

Notes: Duties and responsibilities as per company.

Please check the succeeding pages.

WORK EXPERIENCE IN THE KINGDOM OF SAUDI ARABIA:

LATEST WORK :RIYADH,KINGDOM OF SAUDI ARABIA

1.COMPANY :FAJER CONSTRUCTION COMPANY

RIYADH,KINGDOM OF SAUDI ARABIA

DURATION :FEB. 08 2015 TO FEB. 08 2018

POSITION 1 :ELECTRICAL ENGR. SITE OFFICE OF NEWLY CONSTRUCTED

GRAIN SILO FLOUR MILLS PLANT ORGANIZATION.

:INCLUDES,SWITCHGEAR,MEDIUM VOLTAGE,TRANSFORMER

ATS,GENERATORS,LOW VOLTAGE CABLE,PANEL BOARDS,

ELECTRIC MOTORS & TERMINATION FOR ALL MACHINES

INCLUDE CONVEYING SYSTEM ELECTRIC MOTORS TO

TRANSFER PRODUCT.

LOW CURRENT SYSTEM SUCH AS:

TELEPHONE,CCTV,FIRE ALARM SYSTEM,PUBLIC ADRESS,ALARM

BELL,CABLE LAYING & TERMINATION OF PLC

AUTOMATION SYSTEM .ETC.

POSITION 2 :DUE TO MY MECHANICAL WORK EXPERIENCE, I WAS

ASSIGNED AS A MECHANICAL SITE ENGR. AT HOSPITAL

PROJECT & INTELLIGENCE BUILDING INSIDE THE AIRBASE

SUCH AS:PLUMBING,HVAC DUCTING INSTALATION

FIRE FIGHTING PIPES,SEWER LINE ETC.

DUTIES AND RESPONSIBILITIES:

1.Calculate & Design Electrical drawing 2d,3d and Load balancing.

2.Design Drawing of some mechanical works of the Intelligence Building and Hospital project.

3.Submit design drawing to consultant for approval and after approval provide

a copy to site foreman to implement in the site.

4.Due to my mechanical works experience,I handle also the mechanical works of the Intelligence

Building and Hospital Project inside the airbase.Such us the installation of Hvac Ducting,Fire

Fighting pipes,Chiller piping,Sewer line and Hot & Cold water line system.

3.Meeting with the consultant and clients regarding the progress of the project and resolved

some Electrical and Mechanical issue.

4.Review all plans,details, B.O.Q. and specification of the design drawing.

5.Conduct site mobilization before the work started.

6.Responsible for supervision of the workmen on site.

7.Submittals of materials to be used in the project for approval.

8.Tendering,Materials take off and Prepare purchase order of materials,tools to be used of the

project.

9.Implement safety working procedures on site.

10.Responsible of asbuilt drawing through autocad,if there is some changes of the project.

11.Testing and commissioning of equipment for proper handing over.

12.After handling over;Plans,Leads,Organize and Handling all maintenance activities in conjunction

with the Electrical and Mechanical works.

13.Proper application of maintenanace procedure and practices in accordance with the accepted

Engineering standard.

14.Undertake of any damaged equipment covered by the areas of responsibility.

15.Implement safety working procedures as per engineering safety standard.

16.Through information data formulates maintain and updates a sound preventive maintenance

program to ensure high equipment reability.

17.Prepare and Submit reports daily of any damaged or defective parts of the equipment for

tomorrows preventive maintenance or immediate action.

18.Prepare and submit reports on equipment shutdown for preventive maintenance schedule

(PMS) weekly or monthly.

19.Follow up requested materials,lubricants and spare parts to the materials control section (M.C)

for immediate procurement.

20.Testing and commissioning of equipment.

WORK EXPERIENCE IN THE PHILIPPINES:

1.COMPANY :YSL BUILDERS CONTRACTING COMPANY

DIPOLOG CITY, ZAMBOANGA DEL NORTE PHILIPPINES.

POSITION :PROJECT ENGINEER

JUNE 2012 TO MAY 2014

PROJECT :CONSTRUCTION OF BUILDING & SCHOOL BUILDINGS

COMPLETE WITH PLUMBING & WIRING TERMINATION.

:CONSTRUCTION OF ELEVEN THREE SEATERS TOILET

COMPLETE WITH WATER SUPPLY,WATER TANK,

PLUMBING AND ELECTRICAL WIRING TERMINATION.

DUTIES AND RESPONSIBILITIES:

1.Review all plans,details and specification of the design drawing.

2.Review the program of works (POW)provided by the Department of Education or from the

Department Public Work and Highways (DPWH).Depends of the implementing agency.

3.Submittals of materials to be used in the project for approval.

4.Prepare purchase order of materials used of the project.

5.Conduct site mobilization before the work started.

6.Direct supervision of men working on site.

7.Implement safety working procedures on site.

8.Responsible of asbuilt drawing through autocad,if there is some changes of the project.

WORK EXPERIENCE IN KINGDOM OF SAUDI ARABIA:

1.COMPANY :ESCO/ANMAZ INTERNATIONAL

CONTRACTING COMPANY /SUB-CONTRACTOR

P.O BOX 37093

RIYADH KINGDOM OF SAUDI ARABIA

POSITION :ELECTRO-MECHANICAL SITE ENGINEER

SEPTEMBER 2009 – MAY 2012

PROJECT FINISHED IN KINGDOM OF SAUDI ARABIA:

1.KING FAISAL UNIVERSITY :MECHANICAL & ELECTRICAL

(TAKASSUSI) HVAC DUCTING INSTALLATION

FROM BASEMENT TO ROOF FLOOR

2.CENTRIA MALL(4TH FLR) :ELECTRO-MECHANICAL

(OLAYA) :MECHANICAL

HVAC DUCTING INSTALLATION

:ELECTRICAL

WIRING, CONDUITING AND FIXING OF

LIGHTING FIXTURES DATA AND SOCKET OUTLETS

3.DHL :ELECTRICAL

(SULAY) WIRING,CONDUITING AND PANEL BOARD TERMINATION

4.RIYADH MILITARY :MECHANICAL

HOSPITAL FROM GROUND TO SEVENTH FLOOR

(SOLEMANIA) HVAC DUCTING INSTALLATION

5.PRINCE ABDURAKMAN :ELECTRICAL

VILLA CONDUITING, WIRING AND FIXING OF LIGHTING FIXTURES

AND SOCKET OUTLETS

6.PRINCES NOURA :MECHANICAL & ELECTRICAL

UNIVERSITY HVAC DUCTING INSTALLATION

BLDG # 6 & BLDG # 8 ROOF FLOOR

7. LAND FORCES HEAD :MECHANICAL

QUARTER BUILDING FIRE FIGHTING & CHILLER PIPING

(MINISTRY OF CIVIL INSTALLATION

DEFENCE & AVIATION) BASEMENT ZONE 1,PART 1,2,4,5,6,7,8 & 9.

(RIYADH,KSA EXIT 9)

8.BUSINESS GATE :ELECTRO-MECHANICAL

(EXIT 8,RIYADH,KSA) AC INDOOR & OUTDOOR UNIT CONCEALED

TYPE INSTALLATION COMPLETE W/COPPER

PIPE INSTALLATION & WIRING TERMINATION.

:DUCTING INSTALLATION (RISER)

BUILDING NO.C1,C2,C3 & C4.

9.SAUDI FRANSI BANK :ELECTRO-MECHANICAL

JUBAIL AC INDOOR & OUTDOOR UNIT INSTA-

LLATION, SPLIT TYPE AND CASSETE

TYPE,COMPLETE W/ COPPER PIPE INS-

TALLATION & WIRING TERMINATION.

:DUCTING INSTALLATION AND ALL ACCESSORIES.

10.RESTAURANT & FOURTH :ELECTRO-MECHANICAL / ALL ELECTRICAL WORKS.

FLOOR APARTMENT AC INDOOR & OUTDOOR UNIT INSTALLATION

COMPLETE W/COPPER AND WIRING TERMINATION.

:DUCTING INSTALLATION AND ALL ACCESSORIES

DUTIES AND RESPONSIBILITIES:

1.Recieved directly the project from the Manager for preparation of work.

2.Reviewed all documents contract agreement and scope of works,specification,

B.O.Q., design drawings for HVAC ducting project installation.

3.Reviewed all documents contract agreement and scope of works,specification,

B.O.Q.,design drawings for electrical pipe sleeve,grouding system,conduiting

and cable trays layout.

4.Conduct site mobilization before the work started.

5.Responsible for supervision of workmen on the site.

6.Responsible to make a purchase ordering of the material,tools and equipment

use in the project.

7.Preparation of material submittals for approval of the consultant and site preparation.

8.Planning and scheduling of work time for the completion of the project to finish

before the duration date.

9.Meeting with the consultant & main contractor of the project.

10.Assist with the consultant and main contractor for project site inspection.

11.Testing & commissioning of the projects for proper handing over.

ANOTHER WORK EXPERIENCE IN THE PHILIPPINES:

1.COMPANY :WELMAR EDIBLE OIL PHIL. INC.

(COCO OIL MILL PLANT)

NABILID ROXAS ZAMBOANGA DEL NORTE PHILIPPINES

POSITION :MAINTENANCE DEPARTMENT

MECHANICAL PUMP MAINTENANCE AT REFINERY PLANT,

HEXINE PLANT ALL INSIDE THE PARAMETER.

JUNE 2007- JUNE 2009

2.SELF EMPLOYED :MEMBER OF SINDANGAN ZAMBOANGA DEL NORTE

ELECTRIC COOPERATIVE,PHILIPPINES.

POSITION :CONTRACTOR AND SUB-CONTRACTOR OF

ELECTRICAL & GRILLS & ETC.

OCTOBER 2005-2007

PROJECT FINISHED:

1.BUILDINGS & RESEDENTIALS :ELECTRICAL

WIRING & CONDUITING AND FIXING OF LIGHTING,

DATA,TELEPHONE AND POWER OUTLET.

ANOTHER WORK EXPERIENCE IN THE PHILIPPINES:

COMPANY :MINDANAO STATE TIMBER CORPORATION

SINDANGAN ZAMBOANGA DEL NORTE PHILIPPINES

POSITION :MAINTENACE DEPARTMENT;POWER TENDER & ELECTRICAL

PLANNER/ELECTRICIAN.

APRIL 2004 – SEPTEMBER 2005

DUTIES AND RESPONSIBILITIES:

1.Report and receives instruction to the department head.

2.Plans/organize and coordinate all maintenance activities in conjunction with the

Electrical department/Mechanical department and maintenance section.

3.Undertake repair of any damaged equipment covered by the areas of responsibility.

4.Proper applications of maintenance procedures and practices in accordance with the accepted

Engineering standard.

5.Implementing safety work procedures.

6.Through information data formulates maintain and updates a sound preventive maintenance

program to ensure high equipment reliability.

7.Prepare and submit reports daily of any damaged or defective parts of the equipments for

tomorrows preventive maintenance or for immediate action.

8.Check daily the fuel tank,lubricants of the generator before to run.

9.Follow-up requested materials,lubricants and spare parts to the materials control section(MC)

for immediate procurement.

10.Testing and commissioning of equipment.



Contact this candidate