TO: MANAGER
Applicant:Renato Alcansare Somoso
Mobile No. +639*********/+639*********
Email: **********@*****.***
Position:ELECTRICAL ENGR. DESIGN & SITE
I am Renato A. Somoso,Want to apply in your good office which fit to my work experienced.I have a total of twelve years experience in the field of engineering both electrical and mechanical works and installation.I have a knowledge in lighting and power,switchgear,transformer,generators,A.T.S,medium voltage,low voltage system,panel boards,electrical motor,power protection relays and low current system such us cctv,telephone,and fire alarm system,public address system & alarm bell.Experience in plc, solar power system,Ac indoor & outdoor unit installation split & cassette type,responsible of supervision for ducting installation,plumbing,fire fighting pipe system installation,chiller piping installation,electric motor & mechanical pump setting alignment.Electrical Engineer in Fajr Construction company for Grain Silo Flour Mills Organization(Riyadh,K.S.A),Handling also mechanical works at the hospital and intelligence building inside the airbase of the said company.Same duties and responsibilities of my previous.The Anmaz International Company(Riyadh,K.S.A),Mostly my duties and responsibilities are as follows:Electrical design,site management,supervision of men working on site,technical supervision,site coordination of other related trades of Civil,Architectural,Mechanical and Electrical works layout, checked daily the materials used in the project for tomorrows work and follow up requested materials to the materials control section (M.C).Employed in YSL Builder Contracting Company (Philippine) to which I established and render a good service for the benefits of the company,assist cost estimate,scheduling and time management for the completion of the project before the duration date.I was employed also at Welmar Edible Oil’s Phil. Inc.,Assign in Maintenance Department as assistant for Eletrical & Mechanical including Hexine Plant,Oil Mill,Refinery & Conveyor such us;mechanical pump including piping and other equipment,assist the maintenance of oil separator,heat exchanger,condenser,electrical motors control etc.Had experience also in Mindanao State Timber Corporation,Maintenance Department.As power tender,planner and electrical technician.I have a knowledge also the latest version of autocad 2019 2d,3d,fusion 360 and the very essential engineering software including cad and Ms office excel word documents.
I attached my CV for evaluation purposes regarding my work experienced SO you can assign me the best position to which I am very qualified.
Renato A. Somoso
Very Truly Your’s
Curriculum Vitae of Renato A. Somoso
PERSONAL DATA:
NAME :RENATO A. SOMOSO
PHILIPPINE ADRESS :RAMON MAGSAYSAY SINDANGAN
ZAMBOANGA DEL NORTE PHILIPPINES
NATIONALITY :FILIPINO
CIVIL STATUS :SINGLE
SEX :MALE
HEIGHT :5’3”
WEIGHT :123lbs
S.S.S.NO. :34-107664
Philhealth.NO. :14-200796495-0
Pag-Ibig No. :121*-****-****
COURSE :B.S. ELECTRICAL ENGINEERING
CHILDREN : RENA CHELSEA
: RENZ WILLEM
: LUCKY RENZ OLYM
FATHER’S NAME :OLYMPIO J. SOMOSO SR.
MOTHER’S NAME :LEDENILA A. SOMOSO
CONTACT PERSON :RENATO A. SOMOSO
MOBILE/CELL NO. :+639*********/+639*********
EMAIL ADDRESS :**********@*****.***
EDUCATIONAL ATTAINMENT:
B.S ELECTRICAL ENG’G :ANDRES BONIFACIO COLLEGE
1999-2004
DIPOLOG CITY,ZAMBOANGA DEL NORTE
PHIIPPINES
YEAR GRADUATED :MARCH 22 2004
B.S. ELECTRONICS & :CAGAYAN DE ORO COLLEGE
COMMUNICATION ENG’G :1997-1999
CAGAYAN DE ORO CITY,PHILIPPINES
SECONDARY :SINDANGAN NATIONAL HIGH SCHOOL
1992-1996
SINDANGAN ZAMBOANGA DEL NORTE
PHILIPPINES
ELEMENTARY :PHILIPPINE ADVENT COLLEGE
1986-1992
SINDANGAN ZAMBOANGA DEL NORTE,PHILS.
NAME OF COMPANIES EMPLOYMENT RECORD:
1.Latest – Contractor
Own Management:
Year : 2018 - 2019
2.Fajer Construction Company & Maintenance (Riyadh,K.S.A.)
Year: 2015 – 2018
Position 1: Electrical Engineer
For a newly constructed Grain Silo Flour Mills Organization and undertakes all maintenance facility
after handling over to client.
Position 2: Handling also as Mechanical Site Engineer of the Hospital Project and Intelligence
Building inside the airbase of the same company located at Khamist Mushayt (K.S.A.).
3.YSL Builder Contracting Company (Dipolog City,Philippines).
Year: 2012 – 2014
Position : Project Engineer
4.Anmaz International Company (Riyadh,K.S.A).
Year: 2009 – 2012
Position : Electromechanical Site Engineer/Supervisor.
5.Welmar Edible Oil Philippines Incorporation(Oil Plant)(Nabilid Roxas,Dipolog City.Philippines)
Year: 2007 – 2009
Position : Maintenance Department (Electrical/Mechanical)
Area covered of responsibility:
Oil Mill
Conveyor
Hexine Plant
Refinery Plant
Includes: Expeller,Mechanical pump,Heat Exchanger,Electrical Motors & Control.
Assist the Maintenance of Oil Separator & Assist the operation of Refinery Plant
6.Contractor : Self Employed/Own Management
Year: 2005 – 2007
Contract Includes: Building wiring,Plumbing,Grills,Steel Gates,Steel Window,French Window
Fence Grills and Glass.
7.Mindanao Estate Timber Corporation(Plant)(Sindangan,Z.N.Philippines)
& Iron Ore/Chromite Mineral Crushing Plant
Year: 2004 – 2005
Position: Maintenance Department For Electrical
Planner & Power Tender
Notes: Duties and responsibilities as per company.
Please check the succeeding pages.
WORK EXPERIENCE IN THE KINGDOM OF SAUDI ARABIA:
LATEST WORK :RIYADH,KINGDOM OF SAUDI ARABIA
1.COMPANY :FAJER CONSTRUCTION COMPANY
RIYADH,KINGDOM OF SAUDI ARABIA
DURATION :FEB. 08 2015 TO FEB. 08 2018
POSITION 1 :ELECTRICAL ENGR. SITE OFFICE OF NEWLY CONSTRUCTED
GRAIN SILO FLOUR MILLS PLANT ORGANIZATION.
:INCLUDES,SWITCHGEAR,MEDIUM VOLTAGE,TRANSFORMER
ATS,GENERATORS,LOW VOLTAGE CABLE,PANEL BOARDS,
ELECTRIC MOTORS & TERMINATION FOR ALL MACHINES
INCLUDE CONVEYING SYSTEM ELECTRIC MOTORS TO
TRANSFER PRODUCT.
LOW CURRENT SYSTEM SUCH AS:
TELEPHONE,CCTV,FIRE ALARM SYSTEM,PUBLIC ADRESS,ALARM
BELL,CABLE LAYING & TERMINATION OF PLC
AUTOMATION SYSTEM .ETC.
POSITION 2 :DUE TO MY MECHANICAL WORK EXPERIENCE, I WAS
ASSIGNED AS A MECHANICAL SITE ENGR. AT HOSPITAL
PROJECT & INTELLIGENCE BUILDING INSIDE THE AIRBASE
SUCH AS:PLUMBING,HVAC DUCTING INSTALATION
FIRE FIGHTING PIPES,SEWER LINE ETC.
DUTIES AND RESPONSIBILITIES:
1.Calculate & Design Electrical drawing 2d,3d and Load balancing.
2.Design Drawing of some mechanical works of the Intelligence Building and Hospital project.
3.Submit design drawing to consultant for approval and after approval provide
a copy to site foreman to implement in the site.
4.Due to my mechanical works experience,I handle also the mechanical works of the Intelligence
Building and Hospital Project inside the airbase.Such us the installation of Hvac Ducting,Fire
Fighting pipes,Chiller piping,Sewer line and Hot & Cold water line system.
3.Meeting with the consultant and clients regarding the progress of the project and resolved
some Electrical and Mechanical issue.
4.Review all plans,details, B.O.Q. and specification of the design drawing.
5.Conduct site mobilization before the work started.
6.Responsible for supervision of the workmen on site.
7.Submittals of materials to be used in the project for approval.
8.Tendering,Materials take off and Prepare purchase order of materials,tools to be used of the
project.
9.Implement safety working procedures on site.
10.Responsible of asbuilt drawing through autocad,if there is some changes of the project.
11.Testing and commissioning of equipment for proper handing over.
12.After handling over;Plans,Leads,Organize and Handling all maintenance activities in conjunction
with the Electrical and Mechanical works.
13.Proper application of maintenanace procedure and practices in accordance with the accepted
Engineering standard.
14.Undertake of any damaged equipment covered by the areas of responsibility.
15.Implement safety working procedures as per engineering safety standard.
16.Through information data formulates maintain and updates a sound preventive maintenance
program to ensure high equipment reability.
17.Prepare and Submit reports daily of any damaged or defective parts of the equipment for
tomorrows preventive maintenance or immediate action.
18.Prepare and submit reports on equipment shutdown for preventive maintenance schedule
(PMS) weekly or monthly.
19.Follow up requested materials,lubricants and spare parts to the materials control section (M.C)
for immediate procurement.
20.Testing and commissioning of equipment.
WORK EXPERIENCE IN THE PHILIPPINES:
1.COMPANY :YSL BUILDERS CONTRACTING COMPANY
DIPOLOG CITY, ZAMBOANGA DEL NORTE PHILIPPINES.
POSITION :PROJECT ENGINEER
JUNE 2012 TO MAY 2014
PROJECT :CONSTRUCTION OF BUILDING & SCHOOL BUILDINGS
COMPLETE WITH PLUMBING & WIRING TERMINATION.
:CONSTRUCTION OF ELEVEN THREE SEATERS TOILET
COMPLETE WITH WATER SUPPLY,WATER TANK,
PLUMBING AND ELECTRICAL WIRING TERMINATION.
DUTIES AND RESPONSIBILITIES:
1.Review all plans,details and specification of the design drawing.
2.Review the program of works (POW)provided by the Department of Education or from the
Department Public Work and Highways (DPWH).Depends of the implementing agency.
3.Submittals of materials to be used in the project for approval.
4.Prepare purchase order of materials used of the project.
5.Conduct site mobilization before the work started.
6.Direct supervision of men working on site.
7.Implement safety working procedures on site.
8.Responsible of asbuilt drawing through autocad,if there is some changes of the project.
WORK EXPERIENCE IN KINGDOM OF SAUDI ARABIA:
1.COMPANY :ESCO/ANMAZ INTERNATIONAL
CONTRACTING COMPANY /SUB-CONTRACTOR
P.O BOX 37093
RIYADH KINGDOM OF SAUDI ARABIA
POSITION :ELECTRO-MECHANICAL SITE ENGINEER
SEPTEMBER 2009 – MAY 2012
PROJECT FINISHED IN KINGDOM OF SAUDI ARABIA:
1.KING FAISAL UNIVERSITY :MECHANICAL & ELECTRICAL
(TAKASSUSI) HVAC DUCTING INSTALLATION
FROM BASEMENT TO ROOF FLOOR
2.CENTRIA MALL(4TH FLR) :ELECTRO-MECHANICAL
(OLAYA) :MECHANICAL
HVAC DUCTING INSTALLATION
:ELECTRICAL
WIRING, CONDUITING AND FIXING OF
LIGHTING FIXTURES DATA AND SOCKET OUTLETS
3.DHL :ELECTRICAL
(SULAY) WIRING,CONDUITING AND PANEL BOARD TERMINATION
4.RIYADH MILITARY :MECHANICAL
HOSPITAL FROM GROUND TO SEVENTH FLOOR
(SOLEMANIA) HVAC DUCTING INSTALLATION
5.PRINCE ABDURAKMAN :ELECTRICAL
VILLA CONDUITING, WIRING AND FIXING OF LIGHTING FIXTURES
AND SOCKET OUTLETS
6.PRINCES NOURA :MECHANICAL & ELECTRICAL
UNIVERSITY HVAC DUCTING INSTALLATION
BLDG # 6 & BLDG # 8 ROOF FLOOR
7. LAND FORCES HEAD :MECHANICAL
QUARTER BUILDING FIRE FIGHTING & CHILLER PIPING
(MINISTRY OF CIVIL INSTALLATION
DEFENCE & AVIATION) BASEMENT ZONE 1,PART 1,2,4,5,6,7,8 & 9.
(RIYADH,KSA EXIT 9)
8.BUSINESS GATE :ELECTRO-MECHANICAL
(EXIT 8,RIYADH,KSA) AC INDOOR & OUTDOOR UNIT CONCEALED
TYPE INSTALLATION COMPLETE W/COPPER
PIPE INSTALLATION & WIRING TERMINATION.
:DUCTING INSTALLATION (RISER)
BUILDING NO.C1,C2,C3 & C4.
9.SAUDI FRANSI BANK :ELECTRO-MECHANICAL
JUBAIL AC INDOOR & OUTDOOR UNIT INSTA-
LLATION, SPLIT TYPE AND CASSETE
TYPE,COMPLETE W/ COPPER PIPE INS-
TALLATION & WIRING TERMINATION.
:DUCTING INSTALLATION AND ALL ACCESSORIES.
10.RESTAURANT & FOURTH :ELECTRO-MECHANICAL / ALL ELECTRICAL WORKS.
FLOOR APARTMENT AC INDOOR & OUTDOOR UNIT INSTALLATION
COMPLETE W/COPPER AND WIRING TERMINATION.
:DUCTING INSTALLATION AND ALL ACCESSORIES
DUTIES AND RESPONSIBILITIES:
1.Recieved directly the project from the Manager for preparation of work.
2.Reviewed all documents contract agreement and scope of works,specification,
B.O.Q., design drawings for HVAC ducting project installation.
3.Reviewed all documents contract agreement and scope of works,specification,
B.O.Q.,design drawings for electrical pipe sleeve,grouding system,conduiting
and cable trays layout.
4.Conduct site mobilization before the work started.
5.Responsible for supervision of workmen on the site.
6.Responsible to make a purchase ordering of the material,tools and equipment
use in the project.
7.Preparation of material submittals for approval of the consultant and site preparation.
8.Planning and scheduling of work time for the completion of the project to finish
before the duration date.
9.Meeting with the consultant & main contractor of the project.
10.Assist with the consultant and main contractor for project site inspection.
11.Testing & commissioning of the projects for proper handing over.
ANOTHER WORK EXPERIENCE IN THE PHILIPPINES:
1.COMPANY :WELMAR EDIBLE OIL PHIL. INC.
(COCO OIL MILL PLANT)
NABILID ROXAS ZAMBOANGA DEL NORTE PHILIPPINES
POSITION :MAINTENANCE DEPARTMENT
MECHANICAL PUMP MAINTENANCE AT REFINERY PLANT,
HEXINE PLANT ALL INSIDE THE PARAMETER.
JUNE 2007- JUNE 2009
2.SELF EMPLOYED :MEMBER OF SINDANGAN ZAMBOANGA DEL NORTE
ELECTRIC COOPERATIVE,PHILIPPINES.
POSITION :CONTRACTOR AND SUB-CONTRACTOR OF
ELECTRICAL & GRILLS & ETC.
OCTOBER 2005-2007
PROJECT FINISHED:
1.BUILDINGS & RESEDENTIALS :ELECTRICAL
WIRING & CONDUITING AND FIXING OF LIGHTING,
DATA,TELEPHONE AND POWER OUTLET.
ANOTHER WORK EXPERIENCE IN THE PHILIPPINES:
COMPANY :MINDANAO STATE TIMBER CORPORATION
SINDANGAN ZAMBOANGA DEL NORTE PHILIPPINES
POSITION :MAINTENACE DEPARTMENT;POWER TENDER & ELECTRICAL
PLANNER/ELECTRICIAN.
APRIL 2004 – SEPTEMBER 2005
DUTIES AND RESPONSIBILITIES:
1.Report and receives instruction to the department head.
2.Plans/organize and coordinate all maintenance activities in conjunction with the
Electrical department/Mechanical department and maintenance section.
3.Undertake repair of any damaged equipment covered by the areas of responsibility.
4.Proper applications of maintenance procedures and practices in accordance with the accepted
Engineering standard.
5.Implementing safety work procedures.
6.Through information data formulates maintain and updates a sound preventive maintenance
program to ensure high equipment reliability.
7.Prepare and submit reports daily of any damaged or defective parts of the equipments for
tomorrows preventive maintenance or for immediate action.
8.Check daily the fuel tank,lubricants of the generator before to run.
9.Follow-up requested materials,lubricants and spare parts to the materials control section(MC)
for immediate procurement.
10.Testing and commissioning of equipment.