Post Job Free

Resume

Sign in

Engineer Assistant

Location:
Kampala, Uganda
Posted:
April 06, 2021

Contact this candidate

Resume:

Denis Nicholas Mugendi Mutegi, P.O Box ********0, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 1 of 7

Full Name : Denis Nicholas Mugendi Mutegi

Profession : Civil Engineer

Date of Birth : 23 Dec 1982

Years at Work : 14 years

Membership in Professional Societies:

2008 Registered Graduate Engineer : Engineers Board of Kenya (EBK), B4876 2008 Registered Graduate Engineer : Institution of Engineers of Kenya (IEK), G3431 Specialties:

Data collection and evaluation on engineering projects; planning, design and documentation of project works; Tender documentation, contract supervision, operation, and maintenance; and Post-construction management.

Key Qualifications:

14 years of construction supervision in Civil Engineering in private practices in Infrastructure Development in Urban Water Supplies, Waste Water Engineering and Solid Waste Disposal.

Fully Conversant in Project Management from construction stage through operation and maintenance stage to handover to the employer with local and international exposure in South Sudan, Tanzania and Uganda.

Experience in on-job training including planning, execution, implementation, and O&M. Computer literate and can apply most of the engineering software including AutoCAD and operating systems.

Execution of water treatment plant and distribution system from construction stage through operation and maintenance stage. This included a new waste water system for use by truck dumpers.

Preparation and evaluation of claims on extension of time and reimbursement of costs involved under FIDIC.

FIDIC Training on how to handle matters related to the contract conditions using the Red, Yellow and Silver Book.

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 2 of 7

Education

B. Sc. (Civil Eng.) (Hon) University of Nairobi, Nairobi, Kenya, 2002 to 2007.

Certificate – Basics in computer applications including MS Word, MS Excel, MS Access and MS PowerPoint, African Virtual University, Kenyatta University, Nairobi, Kenya, 2001.

Certificate – Programming in C++ programming language, Computer Centre, Kenyatta University, Nairobi, Kenya, 2001.

Training – Occupational Safety and Health Awareness Training to The Occupational Safety and Health Act (OSHA) No 15 of 2007 Requirements and Occupational Health Safety Audit Systems (OHSAS) 18001, Kigoro, Dec 2017.

Training – Chemical Safety and Confined Space Operations Safety Training to Occupational Safety and Health Act (OSHA) No 15 of 2007 by Bureau Veritas, Kigoro, Oct 2018.

Training – FIDIC Module 5 (EPC Turnkey Projects and Silver Book) Conditions of Contract Training, Maanzoni, Nov 2018.

EXPERIENCE RECORD

Period Employer Project Details &

location

Position held/ work performed

Sep 2007 –

Feb 2008

Spencon Kenya

Ltd

Urban Water Treatment,

Supply, Sanitation, and

Solid Waste Disposal

Juba, South Sudan

Project Summary:

WTP Capacity – 8,700

m3/day

Pipelines – Carbon Steel

& PVC - DN100 – 600 –

4 Km

Storage Tanks – Steel, RC

– Elevated – 50 – 250 m3

Sewage Ponds

Roads

Project Cost – US$ 19 M

Graduate Trainee Engineer

Training on site quality control aspects

Inspection of works for approval

Measurements of various completed works

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 3 of 7

Period Employer Project Details &

location

Position held/ work performed

Feb 2008 –

May 2009

Spencon Kenya

Ltd

Urban Water Treatment,

Supply, Sanitation and

Solid Waste Disposal

Juba, South Sudan

Project Summary:

WTP Capacity – 8,700

m3/day

Pipelines – Carbon Steel

& PVC - DN100 – 600 –

4 Km

Storage Tanks – Steel, RC

– Elevated – 50 – 250 m3

Sewage Ponds

Roads

Project Cost – US$ 19 M

Assistant Site Engineer

Liaison with the Engineer’s staff based on

site on site matters

Testing of the completed water retaining

structures and purification systems

Liaison with the staff undertaking

Installation of Mechanical and Electrical

Equipment on site

Design of the profiles on all interconnecting

pipelines within the treatment plant

Carrying out measurements on completed

works and submission of the payment

certificate

Preparation of the operation and

maintenance manual for the works

May 2009 –

Nov 2011

Spencon Kenya

Ltd

Urban Water Treatment,

Supply, Sanitation and

Solid Waste Disposal&

Rehabilitation of

Government Ministries

Juba, South Sudan

Project Summary:

WTP Capacity – 8,700

m3/day

Pipelines – Carbon Steel

& PVC - DN100 – 600 –

4 Km

Storage Tanks – Steel, RC

– Elevated – 50 – 250 m3

Sewage Ponds

Roads

Project Cost – US$ 19 M

& US$ 16 M

Site Engineer

Operation and Maintenance of the treatment

plant and main distribution systems

Overseeing the training of the local

personnel

Preparation of the final account of both the

projects

Preparation and submission of the claim

involving the extension of time and

reimbursement of additional costs

Completion of remedying the defects and

final handover of the works

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 4 of 7

Period Employer Project Details &

location

Position held/ work performed

Jan 2012 –

Aug 2014

Degremont &

Spencon Services

Ltd JV

Expansion of Water

Treatment Plant

Dar es Salaam, United

Republic of Tanzania

Project Summary:

WTP Capacity – 90,000

m3/day

Pipelines – Carbon Steel

& PVC – DN100 – 2000 –

2 Km

Storage Tanks – RC –

Underground – 8,000 m3

Sewage Ponds

Roads

Project Cost – US$ 36 M

Planning Engineer, Design Coordinator & Site

Engineer

Planning for the execution of the works

Design and drawings coordination for the

works

Quality control checks for the works

Attending site meetings to coordinate the

works and for progress with the Employer

and the Engineer

Testing of the completed structures

Design of the process pipelines profiles

Preparation of as built drawings

Preparation of extension of time claims and

reimbursement of additional costs

Sep 2014 –

Oct 2015

Runji & Partners

Consulting

Engineers and

Planners Ltd

Extension of Services to

informal settlements in

Nairobi, Kenya covering

Huruma. Matopeni,

Spring Valley, Kayole

Soweto and Embakasi

River Bank villages in the

Informal Settlements.

Kenya

Project Summary:

Pipelines – PCC - DN150

– 300

Project Cost – US$ 10 M

Assistant Resident Engineer

Supervision of works on pipeline and

ancillary works in sewer

Attending site meetings and preparation of

meeting briefs

Design of pipeline profiles on site for areas

that had problems and areas that were not

initially covered.

Preparation of monthly reports for

submission to the Client.

Processing of the contractor’s payments for

payment by the Client.

Evaluation of Claims by the Contractor’s on

extension of time and reimbursement of

costs involved.

Oct 2015 -

Dec 2015

Runji & Partners

Consulting

Engineers and

Planners Ltd

Rehabilitation of water

and sanitation systems of

Kiambere basin and

Capacity building

Kenya

Assistant Resident Engineer

Supervision of works on pipeline and

ancillary works in sewer

Attending site meetings and preparation of

meeting briefs.

Preparation of monthly reports for

submission to the Client.

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 5 of 7

Period Employer Project Details &

location

Position held/ work performed

Feb 2016 to

Feb 2017

Spencon Kenya

Ltd

Sotik – Cheborge – Roret

– Kipranya – Sigowet

Road, Kenya

&

Musoma Water Supply

and Sanitation System,

United Republic of

Tanzania

Projects Engineer

Overseeing overall execution of works.

Attending site meetings and carrying out

actions on matters that are raised.

Preparation of monthly reports for

submission to the Client..

Processing of the payments from the Client.

Preparation of claims on extension of time

and costs involved for submission to the

Client.

Feb 2017 Seureca EA Ltd

& East African

Consultants Ltd

JV

Loresho & Uthiru Water

Storage Tank areas under

NCWSC

Kenya

Civil Engineer

Conceptual design for storage facilities

under the Nairobi Master Plan with the

focus on immediate measures in 2017 under

the plan

Conceptual design of 16,000 m3

underground water storage tank in Uthiru

and 1,000 m3 elevated dome-shaped water

tank at Loresho.

Submission of the documents as part of my

deliverables.

Aug 2018 Optiven Kenya

Ltd

Amani Ridge Residential

Development, Ruiru,

Kiambu County

Water and Sanitation Engineer

Conceptual Design of Waste Water

Treatment of over 400 Households

including sewer reticulation, sewage

treatment and treated water re-use system

Preparation of the costs involved in

execution of the works.

Submission of supervision costs for the

works.

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 6 of 7

Period Employer Project Details &

location

Position held/ work performed

March 2017

till Dec

2018

Artelia Ville &

Transport & Cape

Consult Ltd JV

Kigoro Water Treatment

Plant, Gatanga, Murangá

County

Project Summary:

WTP Capacity – 142,500

m3/day

Pipelines – Carbon Steel

& PVC – DN80 – 1200 –

2 Km

Storage Tanks – RC –

Underground – 8,000 m3

Roads

Project Cost – US$ 40 M

Assistant Resident Engineer

Supervision of works.

Quality control of the works.

Issuing site instructions to the Contractor on

matters that need rectification.

Preparation of daily and monthly site

reports on progress.

Review of interim payment certificates.

Preparation of Monthly Report.

Preparation of site and factory inspection

reports.

Jan 2019 till

date

Sogea Satom Ltd

& Suez

International JV

Katosi Drinking Water

Treatment Plant, Pumping

Main Pipeline and

Nsumba Reservoirs,

Mukono District,

Kampala.

Project Summary:

WTP Net Capacity –

160,000 m3/day

Intake Source – Lake

Victoria

Pipelines – Ductile Iron,

HDPE & PVC – DN80 –

1400 – 20 Km

Storage Tanks – RC

Tanks at Nsumba –

40,000 m3

Roads

Project Cost – US$ 102.6

M

Technical Manager

Quality control of the works.

Coordinating the design of the works and

submission of relevant documents to the

consultant.

Follow up on tests conducted on materials

and products and preparation of reports for

approval of the products.

Preparation and submission of contractual

correspondence to the Engineer and within

the JV.

Review and submission of drawings for the

various works for approval.

Coordination with the client and consultant

on matters related to PAPs and RAP on the

works which are beyond the site levels.

Involvement of designs related to the local

standards for the roads, pipelines, sewage

and other related structures.

Denis Nicholas Mugendi Mutegi, P.O Box 4939 – 00100, Nairobi, Kenya. Tel: 072*-***-*** / 073*-***-*** Email: adlg6k@r.postjobfree.com

Page 7 of 7

CERTIFICATION

I certify that to my best of knowledge and belief these data correctly describe me, my qualification and my experience.

REFERENCES

1. Eng. S.K. Ngari

PO Box 67172 – 00200

Nairobi

Tel: Office: 020 – 318262 ext 28323

2. Eng. Nathan Mwema

Nairobi.

Mobile: +254-***-***-***/ +254-***-***-***

Email: adlg6k@r.postjobfree.com

3. Eng. Peter Wanday,

Cape Consult Kenya Ltd,

Nairobi.

Mobile: +254-***-***-***

Email: adlg6k@r.postjobfree.com



Contact this candidate