**+Years Experienced Civil, Structural & Architectural Designer/Draftsman with a demonstrated history of working in the Oil & Gas Energy industry with premier EPC Organizations (viz. Uhde, Petrofac, Fluor, SK E&C, SNC Lavalin, Tebodin (Willfinger), China Petroleum etc.). Successfully delivered variety of Oil & Gas projects (Offshore & Onshore) for major energy client’s viz. ConocoPhillips, Shell, KOC, KNPC, SABIC, ZADCO, ADNOC, Taneco, Vietnam Petroleum.

Prepared/Checked 3D models and 2D Engineering Drawings and sketches within Civil and Structural engineering disciplines. Work closely with other Designers, Drafters, and Engineers to ensure coordinated designs. Apply basic engineering design principles, theories and practices to complete assignments.

EDUCATIONAL DETAIL

Government ITI from Azamgarh -UP, India (NCVT- National Council on Vocational Training)

Certificate Course for: Draftsmanship-Civil, Passing years: 1990, Percentage: 84%, Grade `A’

SOFTWARE PROFICIENCY:

3D Modeling : PDMS v11.5, PDS (Framework Plus), SP3D (Beginner), E3D (Beginner) Revit Structure (Beginner).

2D Drafting : AutoCAD (Rel.2000~Rel.2021), Micro Station V7 & V8i

3D Review : Smart Plant Review (SPR) & Navisworks Freedom

MS-Office : Proficient in Word, Excels, EDMS System of ADNOC

PROJECT EXPERIENCE

CHINA PETROLEUM ENGINEERING & CONSTRUCTION COMPANY– Dubai UAE, 26th Dec2018 to 23Jan2020

Worked on Project : BAB Integrated Facilities Project (BIFP) of ADNOC ONSHORE Abudhabi-UAE

Worked as a Senior Designer – Civil & Structural for Detailed Engineering. Preparing/Checking of Engineering Drawings & 3D modeling using PDS & Micro station for Concrete & Steel structural drawings for various structures i.e. Piperack, Equipment Foundation, Flare Foundation, Compressor FDN, Platform for Circular or Horizontal Vessels, Tank Platform, Substation Building, Anchor Blocks etc. as well as inter disciplines coordination.

SNC LAVALIN India Pvt Ltd- Mumbai, Maharastra - India 15th Oct 2018 to 21st Dec2018

Worked on Project : LYB-LEAP (Bayport PO Plant – Texax, USA for Lyondellbasell)

Worked as Area Lead Designer for Detailed Engineering, Preparing & Checking of 2D Drafting & 3D modeling on CADWORX of Concrete & Steel structural drawings, Bar Bending Schedule (BBS), MTO, BOQ for various structures i.e. Piperack, Equipment Foundation, Buildings, Shelter’s, MPS, MES, Crane Pad etc. and inter disciplines coordination as well as communication with our counterpart of Houston Office-USA.

ZADCO (ADNOC Offshore) - (Through SNC Lavalin International & Tebodin Middle East, Abudhabi – UAE

From 09th Nov 2016 to 09th June 2018)

Worked on Project : Field supports for Upper ZAKUM & UZ750 AUP Project of ZIRKU Island

Worked as a Senior Designer – Civil & Structural, Responsibility include carries out structural modifications and verifications of existing structures, including offshore site surveys as and when required.

Carries out data gathering and operations review to establish scope of design and prepares the basic engineering documents.

Detailing for concrete repairs and strengthening Structural Concrete Bridges, Sub-Station Buildings etc.

Prepare/Modify Structural Steel drawings of Offshore Structures and new facility of Fire Station & Transformer room, miscellaneous pipe supports and Sleepers etc.

Prepared Engineering Drawings for new Filtration Package & Pipe Support/Sleepers for West Island under project UZ750 AUP project and Fire station & Transformer room etc. for East/West/North/South Island.

Road/Paving & Drainage Drawings of ZIRKU Airport Runway Strip.

Supported to in house FEED and proposal documents, Prepared and maintain Deliverable List as per EPC Package scope of EPC-2, EPC-3A for UZ750 AUP Project (East/West/North/South Island).

To ensure all Site modifications, Project modifications to ‘AS BUILT’ status and update master drawings etc.

FLUOR DANIEL INDIA PVT LTD- Gurgaon, Haryana India 28th June 2016 to 27th Oct 2016

Designation : Senior Designer – Civil & Structural

Worked on Project : GAC - Bauxite Mine Development Project Client: Guinea Alumina Corporation S.A.

Worked as an Area Lead Designer of Mine and Port Facilities. Software use Micro Station V8i & Inroads, There bulk earth work, Rail transport, Mine internal and Main Access Road alignment, Railway & Road Bridge, Car Dumper, Lay down etc as well as extract BOQ of Bulk Earthwork, Hydraulic & Engineering Filling, Loading/Unloading Facilities, Rail Yard, Settling Pond, Conveyors, Camp Area etc and General Civil Works.

SK E&C INDIA PVT LTD- GURGAON, HARYANA, India 16th Nov 2009 – 15th May 2016

NSRP Project, Vietnam

Worked as Lead Designer – Civil & Structural for 2D Drafting on AutoCAD & 3D modeling on PDS (Framework plus) and Tekla Structure The entire project was to be done by joint venture of 4 company’s worldwide viz.

JGC, Chiyoda, SK E&C, and GS E&C. The project standards were continuously implemented and regular coordination among different organizations done regularly including prepared deliverable lists, man hour estimates, MTO, and UG drainage plan as part of early engineering.

Performed Detailed Engineering including 2D Drafting on AutoCAD & 3D modeling on PDS (Framework plus) & Tekla for Pipe racks, Technological structures, Equipment foundations such as Heat Exchangers, Vertical & Horizontal Vessels, Columns, Compressor & Pumps Foundation, Tank foundation, Bund wall, Pipe Sleeper, Dynamic foundation, Underground Drainage systems, Foundation location plan, Pile location plan etc. through a design team of about 10-12 Designer and Modeler For NSRP Project at Vietnam with about 75,000 man hours.

Booster Station BS-132 & Gathering Center GC15, GC23, GC25 of KOC at Kuwait

Worked as Lead Designer - Architectural for detailed engineering including 2D Drafting on AutoCAD & 3D modeling on PDS (Framework plus) for 3no’s of Sub-Station Building, 3no’s of VSD Building, Control Building, 25Men Emergency shelter (Bunker), Maintenance building, stand-by diesel generator building and total 43 no’s of shelter i.e. Gas Compressor, TV transfer Compressor, Air compressor, Fire water and other Pump/Tank shelter, Equipment Foundation, service platform, Foundation Location Plan etc. with guide and monitoring the activities with 12-15 Designers & modeler with complete responsibility of Quality & Schedule including Interdisciplinary communication etc. for BS-132 project at Kuwait with about 1,13,000 man hours.

FLUOR DANIEL INDIA PVT LTD- Gurgaon, Haryana India 14th Aug 2006 to 30th Oct 2009

Worked on Project:

Gbaran-Ubie integrated oil and gas project, Client: Shell Nigeria-Nigeria

Worked as Senior Designer for detailed engineering including 2D Drafting in AutoCAD & 3D modeling on PDMS v11.6 (Design & Draft). prepared & checked of all concrete structural drawings of this project and Bar Bending Schedule (BBS) as per BS:8666-2005, for various structures of steel & concrete i.e. piperack, equipment foundation, miscellaneous pipe support, pile location plan & foundation Location Plan etc. as well as interdisciplinary communication etc. for Gbaran-Ubie Project at Nigeria with about 1,20,000 man hours.

OJSC Taneco refinery and petrochemical complex, Tenneco Russia, Republic of Tatarstan

Worked as Senior Designer for detailed engineering including 2D Drafting in AutoCAD and Micro Station & 3D modeling on PDS (Framework plus). prepared & checked of concrete as well as steel structural drawings for approximate 3500M long x 40M high pipe rack, precast concrete column & Beam, Foundation with column socket,

Pile & Foundation Location Plan, Paving and Grading Drawings etc. as well as Interdisciplinary communication etc. for OJSC Tenneco refinery and petrochemical complex, Tenneco Russia, Republic of Tatarstan.

PETROFAC INDIA PVT LTD- MUMBAI, India 10th Nov 2005 to 31st July 2006

Worked on Project: Facilities upgrade & Relocation of GC01 to GC05 Project, Client: Kuwait oil Company (KOC)

Worked as Senior Designer-Civil & Structural for detailed engineering including 2D Drafting in AutoCAD and Micro Station & 3D modeling on PDMS v11.5 (Design & Draft).Prepared & checked of all Concrete Structural drawings of this project for various structures of steel & concrete i.e. pipe rack, equipment foundation, miscellaneous pipe support, service platform, surface water drainage, road Layout, paving and grading etc. as well as interdisciplinary communication etc. for GC01~GC05 Project at Kuwait.

UHDE INDIA LTD- MUMBAI, India 28th Oct 2004 to 09th Nov 2005

Worked on Project : Urea Formaldehyde Concentrate Phase-3 Project, Client: SAFCO, Saudi Arabia

: HAZOP Studies of Refinery Units Project, Client: KNPC, MAA Refinery (ISCO)-Kuwait

Responsibility includes:

Worked as Designer- Civil & Structural, responsibility including prepared concrete as well as structural steel engineering Drawings as well as Bar Bending Schedule (BBS) As per ACI: 315 for various structures of steel & concrete i.e. pipe rack, equipment foundation, miscellaneous pipe support, service platform, pile foundation layout & details, foundation location plan, operating platform for vertical/horizontal vessel, bill of material, mto etc.

HINCON TECHNO CONSULT LTD (Subsidiary of HCC) - MUMBAI, India 10th June 2002 to 27th Oct 2004

Worked on Project : DMRC (Delhi Metro Rail Corp) Project, Client: DMRC, New Delhi-India

: Lavasa Lake City Project, Client: Lake City Corporation- Pune, India

DMRC Metro Rail Project, New Delhi

Worked as Rebar Detailer/Checker, responsibility included prepared and checked of working design drawings and bar bending schedule (BBS) as per BS: 8666 for base slab, concourse slab, roof slab, diaphragm wall etc. for Kashmiri Gate metro station and underground tunnel from Viswa Vidyalya metro station to Central Secretariats metro station.

MOTT MACDONALD INDIA LTD - MUMBAI, India 15th Jan 2002 to 07th Jun 2002

Worked on Project : Flyover Bridge (14th No’s) between Turino to Milano, Italy

Flyover Bridge Project, Italy (Between Turino to Milano)

Worked as CAD Operator- Civil & Structural: responsibility included prepared Steel structure & RCC detailed Shop drawings for Super Structure, deck slab, abutment, Pier details, Pier cap details etc. of total 14th No’s of Flyover Bridge crossing to high speed railway track between Torino to Milano situated at Italy with support of Fiat Engineering - Italy.

SHANGHAVI & ASSOCIATES - MUMBAI, India 01st Jan 2000 to 31st Dec 2001

Worked on Project : Various Residential/Commercial high rise Buildings of reputed developer etc.

Responsibility includes:

Worked as Draftsman - Civil, Structural & Architectural, and responsibility included prepared Concrete & Structural Steel Working Drawings of R & D Center of Pharma company i.e. Sun Pharmaceutical Ltd, Elder Pharma, Deepak Nitrite Ltd etc. as well As residential/commercial high rise building for K. Raheja Corporation and Kanakiya Construction Ltd etc., Mumbai.

HINDALCO INDUSTRIES LTD – RENUKOOT - UP, India 13th Nov 1996 to 12th Feb 1999

Worked on Project : Rs 1800 Crore Expansion job of Hindalco

Responsibility includes:

Worked as Draftsman – Civil & Structural, responsibility included prepared concrete & structural steel working drawings for conveyer, pipe rack, operating platform, equipment foundation, pipe support, BOQ, material take off (MTO), bar bending schedule as per IS code for part of expansion job for the following plant:

Main plant Bldg., MCC Room, Fan Foundation for Hydrate Filter System

MCC Room, Reservoir, Tank foundation, Pump Foundation etc. for Effluent Treatment Plant

MCC Room, Fan Foundation, Pump Foundation for Billet Casting Plant

MCC Room, Fan Foundation, Plant Bldg. etc. For Paste Plant Modernization

KANORIYA CHEMICAL IND. LTD – RENUKOOT - UP, India 12th Apr 1996 to 09th Nov 1996

Worked on Project : 25 MW Captive Power Plant of kanoriya Chemical Plant, Renukoot-UP

25 MW Captive Power Plants, Renukoot-UP:

Worked as Draftsman – Civil & Structural, responsibility included prepared Concrete & Structural steel working drawings for Pipe rack, operating platform, Equipment foundation, pipe support and coal handling plant, TG house, DM water Plant, Cooling water, Boiler House as well as BOQ, Material Take off, Bar Bending Schedule as per IS code for etc.

DATE: 28/02/2021 (DINESH KUMAR GUPTA)

DINESH KUMAR GUPTA

Passport Detail : Z3429634, DOI - 28/12/2015, DOE - 27/12/2025

Date of Birth : 15/05/1972 (15TH MAY1972)

Nationality : Indian

SKYPE ID : dineshgupta3456

Contact No : +91-999*******

E-mail : adlc32@r.postjobfree.com, adlc32@r.postjobfree.com

LinkedIn Profile : https://www.linkedin.com/in/dinesh-kumar-gupta-37722534/



Contact this candidate