Guy W. Carrell
Ph: 979-***-****
adl9uh@r.postjobfree.com
Professional Summary
Certified, experienced and accomplished Mechanical Construction Manager with a proven track record in managing installation of piping. I am able to build strong contractor and staff relationships while leveraging excellent analytical and strategic planning and pursuing a commitment to excellence. I have worked on a range of projects that required professional design, assembly, installation and/or maintenance of closed and open loop systems, from assessing materials selection and quality standards, to managing all construction resources and equipment assets. I have the ability to coordinate production with senior management to ensure construction plans fit system and component requirements per design, quality, and cost.
Skills
●20 years craft and mechanical supervision
●Manager labor – open shop and closed shop
●Manage demolition and installation petro systems
●Troubleshooting qualifications through international trades and various petro chemical companies
●Pipe structure and maintenance
●NCCER certified pipe fitter
●ABC certified iron worker
●10 hour OSHA safety certification
Experience
Matrix-Grand Gulf Nuclear- Senior Coordinator for numerous projects including ISFSI- Phase two Project Oct 2018- May 22, 2020
Oversight for multiple construction crews and disciplines
Review contract proposals
Develop and route oversight plans
Ensure contractors adhere to oversight plans and Entergy procedures
Hazardous material containment and waste disposal management
Management package updates and scope changes per design modification process
Interfaced daily with engineering and welding groups
Management package updates and scope changes per design modification process
Mechanical Superintendent and Mechanical Field Engineer Jan 2016 Oct 2018
BHI- Point Beach Nuclear- Mechanical Superintendent-Projects
BHI – Grand Gulf Nuclear - Digital Controls Upgrade
• Managed multiple construction crews and personnel project facets on a daily basis
Schedule review
Job Assignments
Quality and safety review
Man loading VS. Cost
Project Estimate at Complete for input into Project Controls Reports
Interfaced with craft and project leads to identify design issued address through revision of work packages
•Create RFI (Request for Information) documents for Westinghouse (OEM) for construction and testing
•Provide detailed construction documents to project planning for multiple mechanical and civil changes to original design
•Verify field work installed per approved design
BHI South Texas Project, TX. - Spent Fuel management Project and Emergency Cooling Water Replacement
Managed 3 construction crews in support of completing two projects
Schedule review on daily and weekly look ahead basis
Job Assignments per INPO Accredited Programs
Quality and safety review – assisted in review and establishment for various materials
Man loading VS. Actual cost for PMBOK style KPIs to be submitted on weekly basis
Project Estimate at Complete for input into Project Controls Reports required for Executive Oversight Council
Interfaced with craft and project leads to identify design issued address through revision of work packages
Superintendent Mechanical Construction Jul 2014 Jan 2016
Danos Larose, LA
●Plan construction task and line out crews for pipeline onshore and offshore foreign and domestic
oDesign review
oCost Estimation
oEquipment and Critical sequence activities
oIndustrial Safety and Rigging Plans established
●Order equipment and materials
●Resource tracking per schedule and cost
●Resource projection for estimate at complete
●Daily Job Safety Analysis meetings and mitigations of hazards
●Time Tracking, time sheets, and invoicing of all crews
●Crew evaluations for post job use and lessons learned
●Work plans, schedule integration, and chemical risk process of construction
Rig Mechanical Supervisor May 2013 Jun 2014
Graco Houston, TX
●Pipe fabrication per design drawings
●As built drawing review for constructability and design changes for plant
●Underground pipe welding
oQuality Review and Approval
oTechnique and weld plans
oEnvironmental and industrial controls
●Crew oversight for system installation
●Hydrostatic and pneumatic testing for post installation
Mechanical Supervisor PMPI, South Texas Nuclear generating station Sep 2006 May 2013
Shaw-Stone and Webster Wadsworth, TX
●Supervised a 10 -15 man crew for mechanical and civil support of outage projects and scope of work
●Planned with RP support all radiological tasks
●Planned and implemented heavy rigging including all material handling requirements
●Hazardous material containment and waste disposal management
●Management package updates and scope changes per design modification process
●Interfaced daily with engineering and welding groups
●Daily JSAs (Daily Job Safety Analysis
DSI Samsung Computer Factory Construction Management Jan 2006 Aug 2006
Danos Austin, TX
●Managed the following for completed construction
●Field measured and drew isometric drawings
●Bent instrument tubing per isometric drawings to carry various types of chemicals
●Trained tubing benders for all plant installation
Mechanical Superintendent Petro Chemical – Management of 4 crews Dec 2003 Dec 2005
Danos Larose, LA
●Fabricated isometric drawings
●Repaired and replaced parts of platforms/demo platforms
●Performed equipment demolition, and reinstallation
●Ordered equipment to support all act ivies and monitored costs
●Structured supports and piping with material specs and costs built reports
●Attended safety meetings and Job Safety Analysis' (JSAs)
General Foreman Dec 1998 Oct 2003
Becon New Construction Houston, TX
●Supervised three foreman and their crews, a combined total of 48 people
●Initially hired in as a pipe fitter
●Promoted to general foreman
Certifications
●Rigger (API RP2D)
●Safety Device Bypass
●Scaffold Builder Competent Person
●NCCER
●Benzene Awareness
●Confined Space
●Fall Protection – User Rescue
●First Aid/ CPR
●OSHA 10 hour safety
●HAZCOM
●HAZMAT
●Swing Rope / Personnel Basket
●Marathon EG level 3 permit issuer