Post Job Free
Sign in

Aramco Electrical Engineer

Location:
Marikina, NCR, Philippines
Posted:
May 06, 2021

Contact this candidate

Resume:

Dante U. Soriano

Registered Electrical Engineer

Permanent Address: 132 Katipunan Road, Barangay Bolbok, Lipa City,

**** ********, ***********

Date of Birth: August 17, 1970

Mobile Number: +639*********; +639*********

Passport #: P5796236A, valid until February 16, 2028

Email Address: **********@*****.***; **********@*******.***

Experienced Electrical Engineer with more than 25 years of professional working experience both Offshore and Onshore in the field of Electrical Project Engineering, Feasibility study to conceptual and basic engineering design, detailed engineering, construction field engineering, construction management, commissioning and start-up mainly for oil and gas and petrochemical industries, power and energy sector, industrial plants and MEPF, and critical facilities mostly related to Ex equipment’s, LV, MV, and HV power systems and Substation up to 230KV systems with SIEMENS, ABB, & Schneider GIS/Vacuum switchgears, LV / MV Power Generators like Cummins, Wartsila and Caterpillar, Solar Titan, GE and Siemens GTG

Certified High Voltage Switching and Safe Operations personnel – 33KV system (P.T. ProSafe Indonesia)

Professional Work Experiences:

TE - Electrical Superintendent Tecnimont SpA May 3, 2018 to

June 30, 2020

RAPID Project – Flexible HDPE Package 27, Johor Malaysia

Electrical construction engineering and management, progress measurement, installation supervision and quality control for major LV and HV electrical equipment’s, HVAC, F&G system, cable pulling, terminations

Coordinate with Project Engineering on site clashes, revisions, modification works to be executed

Progress Measurement / Reporting to Construction Manager

Issue EWR, Site Instructions for items not captured during detailed design, TQR management

Review / approval of Method Statements, JHA, MAR, Electrical Operational Test procedures

Supervision of all electrical installations, pre-commissioning and commissioning works

Close coordination with electrical equipment vendors from various countries including Ex equipment’s for the certifications and SAT execution, claims on warranties, equipment defects management, IFC drawings, and hand-over of vendor documents

PMC Senior Project Engineer - Meinhardt, Philippines Inc. October, 2016 to

Commissioning Lead April, 2018

OKADA Manila – MBR Project, Manila Philippines

Monitor testing and commissioning works / functional tests done by the Contractor

Lead energization and start-up of major systems and equipment’s such as UPS, power transformers, LV and HV switchgears, field instruments, facility HVAC system, BMS controls

Close coordination with Engineering teams both Contractor and internal consultant on site changes, modifications before execution

Maintain logs on Management of Change whenever design changes occur as well as temporary changes done during commissioning

Close coordination and interface with various electrical equipment vendors regarding SAT execution, as-built drawings, operation and maintenance manuals hand-over

Lead the performance testing of Diesel Power generation system (13 x 2.2MW Cummins EDG), 6 x 34.5KV distribution substations, and facility Building Management Systems

Senior Engineer / Superintendent - Samsung Engineering September 3, 2014 to

Construction / Commissioning Company Limited June 28, 2016

SOCAR Ammonia & Urea plant project - Sumqayit, Azerbaijan

ExxonMobil Banyu-Urip Gas Oil Separation Plant project – Central Java, Indonesia

Over-all Electrical Management of the SOCAR Carbamide project, giving priority on Health & Safety and Quality Assurance & Quality Control

Testing and commissioning of 11KV / 6.6KV / 0.4KV Switchgears, Transformers, Motor No Load test and MRT’s, 11KV Cummins Emergency Diesel Generators with Vendors, LV VFD’s, HVAC, F&G

Maintain logs on Management of Change / work alongside QC Inspectors for Ex inspections and certifications

Carry out MV Switching for all 11KV and 6.6KV systems / Lock-out Tag-out system implementation

Work with Lead Engineers (Mechanical / Instrument / Process) for updating of CMS-ZENATOR database management for System Mechanical Completions

PMC E&I Senior Superintendent - Foster Wheeler SofCon July 17, 2013 to

Construction /Commissioning Saudi Arabia March 29, 2014

SADARA Chemicals Propylene Oxide plant project – Jubail, Saudi Arabia

Managed all E&I construction and pre-commissioning activities in full compliance with Safety, Cost and Schedule including Quality Assurance and Quality Control carried out by Contractor

Detailed design verification as well as revisions suggested on items not in accordance with project specifications and applicable company standards

Close communication and interface with various Electrical and Instrumentation equipment vendors regarding equipment design and IFC drawings, equipment delivery schedule and FAT/SAT execution

Follow up on materials and equipment purchase orders as well as TQR’s raised by the Contractor

Project Offsite Interface with Civil, Mechanical, and Piping disciplines for the production of plant Modules for the Reactor and Feed cycle system, Steam Generation and Separation systems

PMT Senior Engineer / Superintendent - Saudi Aramco – TOTAL September 16, 2010 to

Construction / Commissioning Refining and Petrochemical May 28, 2013

Saudi Aramco – TOTAL Refining and Petrochemical Plant project – Jubail, Saudi Arabia

EPCC Detailed design review, Construction & Commissioning control, construction management, Quality Control Management, technical queries evaluation and clarification

Follow up electrical engineering deliverables and make sure all drawings used at site are updated

Progress measurement and monitoring through project CM Tools as well as mitigation of progress reporting by the Contractor

Execute and close out Management of Change for Electrical works; Monitor ICAPS Completion listings and Commissioning tasks as mandated by ICAPS Mechanical Completion requirements

Supervised Medium Voltage Switching for all 13.8KV and 4.16KV systems of the Aromatics plant including the 13.8KV Hydrogen Booster Compressor and 4.16KV 2nd and 3rd stage compressors

Commissioning dossiers review / approval before achieving RFSU of all electrical LV and HV systems

Electrical Field Quality Manager SANKO Singapore July 17, 2009 to

PTE Limited April 10, 2010

ExxonMobil Metallocene Elastomer and PP-II Plant projects – Jurong Island, Singapore

Developed QA / QC Manuals and procedures such as ITP’s, ITR’s, Method Statements, Pre-commissioning and commissioning procedures for all electrical LV and HV systems, PAGA / CCTV system (Siemens), Telephone and Data System (PABX, VOIP), Access Control and Personnel Tracking (ACPT) System, Intrusion Detection System (IDS), Fiber Optic Networks, Fire & Gas detection system

Ensure company compliance to ISO certification; Prepare project documents and deliverables such as systems breakdown structure, schedule of activities, Pre-commissioning procedures in compliance with the project requirements for timely updating to Handover database

Managed and controlled all commissioning activities for 2 substations and process equipment’s

Electrical Construction & TECHNIP Vietnam March 1, 2008 to

Commissioning Engineer February 28, 2009

Petro-Vietnam Dung Quat Refinery project – Quang Nghai, Vietnam

Field engineering, Quality control and construction supervision for all electrical power system, communication system, FM-200 fire suppression system, BOP equipment’s

Supervision for the installation, pre-commissioning and commissioning activities for Steam Turbine Generators and auxiliaries, ABB LV MCC’s, Schneider 22kv HV GIS Switchgear including Gas CB’s 22/6.6kv relay calibration and functional tests, Generator Unit power transformers installation and testing, Transformer OLTC testing, LV and HV cable tests

TQR, JHA and MS review and approvals

Close coordination with electrical equipment vendors from various countries for the SAT execution, claims on warranties, equipment defects management, IFC drawings, and hand-over of vendor documents

PMC Lead Electrical Engineer - BECHTEL Overseas, Inc. August 5, 2007 to

Field Engineering / Quality February 28, 2008

New Doha International Airport project – Doha, Qatar

Review of electrical detailed engineering design and vendor documents, installation and pre-commissioning supervision of HV interconnections for all Substations, hangar areas, utilities and jet fuel system.

Close coordination with electrical equipment vendors on engineering deliverables, SAT and FAT execution

Monitor underground HV transmission line works (230KV network) from KAHRAMA switching station to main substation including area substations on 69KV, 34.5KV and 13.8 KV networks

Managed the construction and pre-commissioning of HV GIS Substation (230KV GIS network) including all auxiliaries and power equipment’s

Senior Electrical Engineer Obayashi Corporation September 27, 2006 to

May 25, 2007

Dubai Metro Rail project – Dubai, U.A.E.

Detailed design review and field engineering works

Materials follow up and vendor coordination regarding engineering deliverables and FAT witnessing

Supervision for the installation, commissioning, operation & maintenance of auxiliaries and power supply for tunneling works like grout injection plant, conveyor system, tunnel lighting system, TBM High Voltage and Low Voltage power supply system, camera installation for the buggy trains for use underground, air and water compression system, LV system for the tunnel lighting

Engineering Supervisor De La Salle University August 25, 2005 to

September 25, 2006

De La Salle University 7-Storey Medical Building project – Philippines

Project management for the new 7-storey medical building construction

Control and monitor all the construction workflow including work force, budget, schedule

Monitor purchase and delivery of major electrical and mechanical equipment’s like the LV switchgears and MCC, Elevator system, stand-by power generators

Senior Project Engineer - GCC Olayan / May 5, 2002 to

Engineering, Commissioning Cummins Power May 30, 2005

SCECO Power plant projects – K.S.A.

ARAMCO Marjan Offshore platforms – Tanajib, K.S.A.

MAADEN Gold mining plant project – Western region, K.S.A.

ARAMCO / SABIC LNG plants – Easter region, K.S.A.

Project Engineering from feasibility study, site surveys and acquisition, Detailed Design, Construction supervision, commissioning, operation and maintenance of isolated power plants for MAADEN Gold Mining Plants, Saudi Aramco Offshore LV & MV substations, SCECO Grid connection study and actual paralleling

Close coordination and monitoring of electrical equipment vendors regarding engineering deliverables, FAT inspection and SAT execution

Pre-Commissioning, Commissioning and Startup of Cummins, Wartsila and Caterpillar Power Generation plant and HV/LV Distribution substations

O&M of Offshore and Onshore power station equipment’s such as AC/DC UPS system, LV / MV and HV switchgears, power transformers, SCADA system, motor controllers, VFD’s

Lead E & I Engineer Carlo Gavazzi February 3, 2001 to

Arabia Limited March 30, 2002

SEC Shoaiba 690-MW Combined Cycle power plant project – Jeddah, K.S.A.

Lead the installation, pre-commissioning of major electrical equipment’s mainly in 230KV GIS high voltage switchgear, switchyard, and distribution substations

Support testing of 3X230 MW ALSTOM Steam Turbine Generators and Auxiliaries, process plant equipment’s, HV/LV motors and controllers as well as BOP equipment’s

Field engineering quality control works on BoP equipment’s installation and pre-commissioning

Service Engineer / SIEMENS Limited July 30, 1997 to

Field Quality Manager Jeddah, Saudi Arabia December 18, 2000

SEC / ARAMCO / SABIC Gas plants, Refineries, power plants, offshore facilities - K.S.A.

Installation and commissioning of electrical power generation and distribution equipment’s for LV, MV, HV system including field instruments for major energy, oil and gas and petrochemicals projects all over K.S.A. like power transformers, Siemens 230KV GIS and Vacuum Switchgears, UPS and DC systems, Capacitor banks, lighting and power panels, battery banks, emergency generators

Qualification:

Bachelor of Science in Electrical Engineering

Batangas State University, 1992

Registered Electrical Engineer, License No.10529

Computer / Systems Completions software / Engineering Standards skills:

Highly conversant / Advance knowledge on System Completions Tools like ICAPS, MC Plus, Take-Over XP, Zenator-Plus & Engineering Standards IEC, IEEE, BS, NFPA

Knowledge on Primavera P-6, Navisworks plant 3-D model, AutoCAD, Microstation

Basic knowledge on ETAP and SPEL

Advance skills on MS Project, Word, Excel, PowerPoint, Outlook

References:

Mr. See Young Lee Mr. Gerald Bankes

Commissioning Manager Systems Completion Lead

SAMSUNG Engineering Company Limited 3GP Tengiz Chevroil FGP project

Seoul, South Korea Tengiz, Kazakhstan

Tel. #: +821********

Email: *.*****.***@*******.*** Email: ******.******@*****.***



Contact this candidate