ELECTRICAL ENGINEER
ABDUL ZAFAR
Mobile no: - +91-998*******
Email id : - ***************@*****.***
Skype ID : +91-998*******
EDUCTION:
B.TECH- ELECTRICAL ENGINEERING COMPLITION IN - 2012
CERTIFICATION:
GRADUATION IN ELECTRICAL AND ELECTRONIC ENGINEERING
PROFILE SUMMARY:
Execution, Designing & Management of Electrical Systems having 9.5yrs years of experienced.
All kind of Electrical Projects such as Residential & CommercialbuildingsHospitals,SportsComplex,Malls,Villas,High Rise Buildings,Bridges,Tunnels etc.
fire alarm system installation like manual call point(mcp ), Horn strobe, smoke detector, heat detector, explosion proof heat detector, access floor heat detector, firealarm panel installation etc.
Specifications for Electrical Equipment’s ( Wires & Cables, Transformers, Isolators, Lightning Arresters, Circuit Breakers, Capacitor Banks, Switchgear Etc.)
Preparation of Lighting & Power Layouts.
Preparation of Single Line Diagrams (SLD).
Load Scheduling of Distribution Board (DB), Sub Main Distribution Board (SMDB), and main Distribution Board (MDB), motor Control Centre (MCC).
Sizing Cables, Transformer, Capacitor Bank, Cable Tray, Ups, Stand by Generator.
Preparing Material Submittal, Method of Statement as per the Rules & Regulations.
CCTV, Fire Alarm System, Access Control, Public Address, Back Ground Music (BGM), Telephone, Data & SMATV Systems.
Preparation of Riser Diagram for Low Current System.
Installation, Testing, Commissioning of Low Voltage, Low Current System (Complete Electrical Work) as per the rules & Regulations by (GOVT AUTHORITY).
Expertise in Reading Drawings, Preparing & verifying the same on the basis of Specifications.
Portfolio of Settling the entire Techno-Commercial Dispute during Execution of Projects.
Anchored Execution &Management Activities to Ensure Completion of Project with in Time, Cost Parameter & Effectively using Resources to Maximize the Output.
EPC – MEP PROJECTS
M.S. ELECTRICAL CONTRACTOR. HYDERABAD.INDIA.
Job Post : Electrical Engineer
Period : 07- July-2020 to Till Date
Projects : 1. 13 floors of Residential apartment
At kukatpally.Hyd
: 28 floors of commercial and
2. Automation flats( 28 flats) at
Banjara Hills.Hyd
: 3. Commercial and duplex flat of 14
Floor at Musheerabad.Hyd
: 4. 34 floors of High rise and Residential
Buildings at kokapet.Hyd.
: 5. Residential building @ Begumpet.Hyd
: 6. Highrise Buildings @Tranqul
Kokapet.Hyd.
Clients : 1. MyScape Private Limited
Hyderabad.
: 2. Lakhani Associates at JubleeHills.Hyd
: 3. SVC Construction At
Musheerabad.Hyderabad.
: 4. MyScape Private Limited. Hyd
5. Zedcon Consultant Banjarahills. Hyd
: 6. Prestige Group Private Limited.
Job Description: working of High rise and commercial building, automation flats, Residencial apartments Duplex flats etc
Comprehensively understanding the scope of contract/work with respect to it’s subsequent development & implementation in an approved manner.
To carry out Design and drawing ensuring it’s optimal use in compliance with the government rules/regulation/laws.
prepare all relevant documents such as Material Submittal, Vendor approval, RFI, Method of Statement etc.
Prepare schedule of work, BOQ, float enquiry for sub contractor as per the contract specification and drawing.
Deciding work on daily, weekly & monthly basis to junior engineer, supervisor, foreman and individuals ensuring quality of work as per the specification.
Planning & implementing safety measures for as per the HSE department rules & regulation for both man & machines, equipment used by identifying and monitoring new technical changes to enhance productivity of work.
Floating request for inspection. Attending weekly, monthly meetings with Clients, Consultants, sub contractors & Vendors.
MEP PROJECTS
AL ZOUR OIL REFINERY PROJECT .KUWAIT.
Job Post : Electrical Engineer
Period : Nov -3-2017 to Feb-12-2020
Projects : Al Zour Oil Refinery Project.
Client : Flour, Daewoo and Hyundai (JV). (KIPIC)
Job responsibilities:
Involved in the technical and Management supervision along with site execution and highly driven in various project related to Housing.
Planning and execution on the electrical side for building projects closely monitoring the construction activities, attending weekly meetings at site with other Engineers and Contractor- Maintained weekly status reports.
Installations of all electrical works were carried out as per approved shape drawings ensuring compliance with safety requirements as per standards
Preparing daily reports and documentation.
Supervising work quality service and inspector.
Attending the weekly meeting with our senior managers.
Control and the distribution of all the companies’ quality documentation.
Monitor all quality related activities on the project.
Perform all internal and external audits on behalf of the company’s management
Verify contractor quality requirements are specified to vendors and contractor documentation submittals.
Attend all pre-bid meetings and coordinate all project requirements with the project bidders.
Attend client quality management meetings.
The preparation and control of project quality system management documentation prior to project commencement.
EPC -MEP PROJECTS
LANCO HILLS TECHNOLOGY PARK PVT.LTD. MONIKONDA, HYDERABAD. INDIA.
Job Post : Electrical Engineer
Period : Feb- 2017 to august -2017
Projects : 4-High-rise Buildings and 52-Hanging Garden Villas.
Client : Lanco Hills Technology Park Pvt. Ltd.
Job responsibilities:
Ensuring that construction, installation and testing activities should confirm to functional specifications and customers requirements. .
Conducting the site visit /store visits for testing different materials and equipments such as stand by generator, fire fighting pump etc. Before dispatching to site before installation of the site.
Supervising work quality service and inspector.
Attending the weekly meeting with our senior managers.
Control and the distribution of all the companies’ quality documentation.
Monitor all quality related activities on the project.
Perform all internal and external audits on behalf of the company’s management
Verify contractor quality requirements are specified to vendors and contractor documentation submittals.
Attend all pre-bid meetings and coordinate all project requirements with the project bidders.
Attend client quality management meetings.
The preparation and control of project quality system management documentation prior to project commencement.
Review quality inspection personnel qualifications and training requirements
Monitor the disposition of all issued nonconformist reports.
Monitor the progress and effectiveness of the project quality management system.
Recommend and implement improvements when required.
Coordinate all quality related correspondence with the customers’ representatives.
Monitor statistical method reporting.
Action and close all customer complaints.
Controls all achieve documentation upon the completion of the project.
EPC PROJECTS
SAUDI PAN KINGDOM, RIYADH. K.S.A
Job Post : Site Engineer
Period : October 2014 to October 2016.
Project Name : Armed Forces Medina Housing
Client : Ministry of Defense
Job responsibilities:
Supervise and monitor installation of all types’ cables, cable trays, lighting fixture and all electrical equipments etc.
To conduct inspection of all ongoing activities for electrical installations before rising RFI/client inspection.
Maintain quality records and ensure those produced are collected and complied into record. Preparation and submit to the client for its approval one week ahead.
Conducting inspections for all electrical material deliveries.
To attend all electrical meeting with client/contractor representatives.
Check the drawings and documents used at site for approvals and compliance with project requirements.
Prepare weekly surveillance reports, non conforming reports and verification of corrective actions drawings.
Ensure that all equipments used are calibrated and with valid certificates.
Preparation the method statements report before all electrical installation work like grounding, cable trays etc to get approval & easy to work on site.
Routine inspection for the Electrical work activities and inspection of incoming client materials.
Supervision of electrical/Instrument equipment installation & erection activates.
Inspection installation of HV/LV cables & Cable testing such as (continuity test & insulation resistance test).
Perform routine inspection and document result in accordance with approved client proceeds.
MEP PROJECTS
ENRUN INDIA PVT LTD, BALNAGAR HYDERABAD.
Job Post : Site Engineer
Period : May 2013- April 2014.
Project Name :Housing Projects for buildings industries
Job responsibilities:
Involved in the technical and Management supervision along with site execution and highly driven in various project related to Housing.
Planning and execution on the electrical side for housing projects closely monitoring the construction activities, attending weekly meetings at site with other Engineers and Contractor- Maintained weekly status reports.
Installations of all electrical works were carried out as per approved shape drawings ensuring compliance with safety requirements as per standards
Preparing and agreeing project specifications, budgets and timescales with clients
Implementing designs, creating test procedures.
Preparing daily reports and documentation.
PRAVIN ELECTRICAL PVT LTD.MUMBAI
Job Post : Site Engineer
Period : Feb- 2012 – Sep-2013
Projects : 8-High-rise Buildings and 40-Hanging Garden Villas.
Client : Lodha Group new cuffe parade wadala east.mumbai.
Job responsibilities:
Co-coordinating Installation activities and documentation preparation.
Interpretation of corporate policies for site. Field testing and pre-testing Equipment validation
Trouble shooting instrument problems with technical queries.
Prepare daily project site activities, progress measurement and evaluate progress for reporting directly to Project Manager and Planning Department.
Liaise with design and construction personnel to highlight technical problems.
Responsibilities of the site construction, installation of Electrical Equipments.
Capable of reading electrical drawing with good understanding of electrical control system and finding all electrical faults.
KEY SKILLS
Executing LV and LC System
Preparing Shop Drawings
Preparing Load Schedule and SLD
Quality Assurance, Site Inspection
Team Building and Leadership
TECHNICAL SKILL
Microsoft Word
Microsoft Excel
PROJECTS COMPLETED
Residential and Commercial MEP Projects
Villas, Complex, Schools, High Rise Buildings Etc
Personal Profile
Name : ABDUL ZAFAR
Father Name : Abdul Quadeer
Language Known : English, Telugu, Hindi and Arabic
Marital Status : married
Nationality : Indian
Passport No : K3129243
Date of issue : 03-04-2012
Date of expiry : 02-04-2022