Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-1-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** SUMMARY

Experienced in all phases of the project and construction management for midstream oil & gas products, and energy- related pipelines, including facilities. Accomplished at working within integrated environments with multi-discipline and multi-cultural staff to British, ISO, US, and various foreign standards, procedures, and specifications in a variety of geopolitical climates.

Background includes over 37 years’ experience, the last 8 years on international assignments, in the management, engineering, planning, construction, and design support of midstream oil, gas, and energy related facilities, pipelines, pumping / compressor stations, tanks, fuel storage and distribution systems, including near-shore beach pulls, horizontal directional drilling, and offshore marine facilities; risk analysis, strategic planning and execution of energy projects in the UK, North America, North Sea, Middle East, Australia, Canada, South East Asia, South America, Russia, and Africa.

Management and supervisory positions have included but not been limited to responsibilities for: Project/Construction/Engineering operations management, ……Construction Manager on major Cross Country Pipeline Projects including their associated Pump Stations, Pigging Facilities, ESD Valve Compounds, and Compressor Stations, “Hands on” when working for Construction Contractors, and Managerial when working for the Owners; Design support; Worked as Company Rep in Pipe manufacturing Mills, and their 3 Layer PE / PP coating,

& FBE plants; Experienced in HS & E, QA/QC systems, field supervision, Q.C. inspection on: - welding, coating, painting, building works, and civil; quantity surveying, contracts administration, cost control, scheduling, budget administration, valuations, contractual assessment, variance analysis, estimating, and planning. Performed hands on, specialist supervision of Horizontal Directional Drilling works, Micro Tunnelling, Marine Construction works, Hydrostatic testing, vacuum drying, pigging, and pre-commissioning. Writing, and professional review of method statements, risk assessments, sub-contract work scopes, and construction procedures. Safety and environmental control. Personnel recruiting, evaluation and training. Worked with design teams, on tendering and proposals. Gordon demonstrates a proven record in accomplishment of performance, time and costs targets; a high level of commercial awareness, with an analytical approach to problem solving resulting in realistic, and cost effective solutions to technical, and commercial challenges. Gordon is an experienced manager accustomed to dealing with people at all levels, and motivating personnel to deliver action and results. An impressive portfolio of references is available for perusal. Gordon works with a “Multi Tasking” management attitude taking in QC, HS &E, Soceo, & Cultural Heritage, all in conjunction with project targets, and schedule. Management Expertise: Built a solid portfolio of major engineering, and construction-related assignments for the global onshore energy pipeline industry during a successful 34-year career. Extensive experience gained in the effective management of personnel, financial, engineering, and all constructional facets associated with pipeline engineering and pipeline construction projects. Offers extensive strategic, operational, and technical understanding of the business and industry, coupled with the interpersonal and relationship-building skills necessary to motivate others and ‘get the job done.’

Specialised in:- Pipelines with their associated Compressor / Pumping Stations Construction, HS&E, Horizontal Directional Drilling, Land Falls, Micro Tunnelling, Beach Pulls, Near Shore Marine Works, GRE Pipelines, Pigging, Hydrostatic Testing, Steep Gradients, & Swamp / Bog Works, Geotechnical, & Erosion Control, Oil / Gas Field Civil Works.

Employers: Chevron, Fircroft, BP, Orion Energy, Jacobs, Allseas, Cairn Energy, Wood Group, JP Kenny, Brunel, ExxonMobil, Moody, PENSEN, SICIM Pipelines, Nacap Pipelines, Kvaerner, Laing Pipelines, Premier Oil, John Brown, Fluor Daniel, Bechtel, Shell, McAlpine Pipelines, Turriff Taylor, McConnell Dowell, William Brothers, Gulf Interstate, Canuck, & SNC.

EXPERIENCE

Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-2-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** Jacobs UK Limited on

the ESSO SLP

Southampton to London

Heathrow Pipeline

Project.

May 2019 till present [

current employment ].

Pipeline Construction Manager.

Working in a Construction supporting role to the basic design team. Review, and develop the project alignment sheets, and typical detail drawings. Combine with other disciplinary roles and walk the proposed alignment route. Manage early works Contractors under a strict control of work regime to perform trial hole excavation works, ground penetrating radar works, bore hole works, archaeological exploratory excavations, and site establishment works.

General project support in development of logistics transport management plans, allocating line pipe to future pipe dumps. Support Engineering Team. Tengiz Chevron – Future

Growth Project – Tengiz,

Kazakhstan

through

Fircroft Engineering.

January 2018 –

December 2018.

Client’s Construction Superintendent.

Managing the Bonatti scope of work for 400 Kms of varying diameter gathering system high pressure pipelines, metering stations, and well head piping. Safety Site Leader on very strict permit control of work system in green field, and brown field rights of way. Management and guidance of supervision to ensure site productivity, and efficiency to meet contract targets all with safe, and quality work execution, and permitting compliance. Ensure compliance with the latest revision of AFC drawings, and specifications.

Leadership, and roll out of the Company Incident, & Injury Free programme [ IIF ]. Manage, and provide guidance to subordinate Company Engineering, HSE, and Quality Team to ensure site productivity and efficiency result in meeting contract targets. Provide daily supervisory surveillance, ensuring the Contractor’s management, and supervision are providing safe working conditions, and work procedures, protective equipment, experienced / qualified personnel, supervision, and manpower, with reliable well-maintained equipment to execute the contracted works in line with the contract schedule, and targets.

Manage the Environmental compliance inspections, & Safety site walk downs, & Archaeological impact on the project.

Deliver, and hand over the completed works, system by system to the completions team.

BP Oman Khazzan

through

Orion Engineering.

January 2014 – May 2017.

Client’s Area Construction Manager. Responsible as Client’s Site Representative, & Authorised Authority, managing the contracts, Control of Work [ CoW ] Permits, and Contractor Performance on the Water Well Drilling, Construction of Glass Reinforced Epoxy [GRE] Water Gathering, & Transmission Pipelines, Well Drilling Pads for Dalma, Weatherford, and KCA/Deutag Rigs, plus Fracing Spreads, & Rig Access Roads. The welding, & laying of a 300Km Duplex gathering system, construction of 36” Dia Carbon Steel Gas Export, and Condensate Export Pipelines. QHSSE compliance under all of the BP Management Systems:- ATO, COW, START, GHSER, PTW, and others. Managed JACOBS PMT on various contract work packages for performance, and delivery. Identify issues which have potential to impact schedules, Review, and approve all RAMS, witness “Hold Points”, Lead Constructability reviews, communicate “Lessons Learned”, and coordinate with Design Team.

Reviewed, appraised, evaluated, and scored Contractor Bid Packages for the works. ILF Consulting

Engineers.

October 2013 –

December 2013.

[Twelve week assignment

only for the specific task].

Bidders Pre-Qualification Appraisal / Constructability Expert on the Trans Anatolian Natural Gas pipeline TANAP in Turkey.

Responsible for the bid opening proposal packages, and confidential pre-qualification review of twenty nine sets of Contractor, and JV proposals. Support the Detailed Design Engineering team on constructability issues associated with a 56” diameter traversing through steep gradient, and swampy low lying terrain. Jacobs. Company Project / Construction Manager on the OCP 36” Dia x 187 Km Phosphate Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-3-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** August 2011 – July 2013. Slurry HDPE Lined Pipeline, & Pumping Stations in Morocco. Responsible as the Senior Company Representative on site managing the Company Project Team, and the Construction Contractor Tekfen to ensure safe delivery of a quality Pipeline, Feeder Pipelines, their associated Pump Stations, plus Tank Depots on schedule, and with-in budget. Manage the entire Quality Management system with particular focus on the Automatic Welding System, the Automated Ultra Sonic NDT system, the Tank Erecting, the Station Works, & Pumps, HDD, the deployment of the HDPE lining, and the complete installation of the fibre optic cable. Review and comment though to IFC status of all Construction related Procedures, QCP’s, ITP’s, Method Statements, and their associated Risk Assessments. Chaired all Construction, Progress, HSE, and Quality related meetings. Managed the entire Pump Station works, and the Pipeline Construction Spread from the PMT Engineer’s Jacob’s perspective.

Allseas.

March 2011 – August

2011.

[Short assignment due to

uncertainty as to whether

the extended planning

permission would follow].

Construction Manager on the Laggan Tormore Land Falls, and Pipelines Pull for Allseas on the Shetlands for TOTAL. Managed Construction, and all associated QHSE for the land fall import pipelines, and the near shore marine works subcontracted to Van Oord, SICIM, & Roadbridge including all offshore trenching, pipe winching, near shore survey, backfilling of offshore trench, carbon steel, & duplex pipelines, plus reinstatement of the environmentally sensitive peat moor onshore. GDI SICIM Pipelines

February 2010 – March

2011

Contractors Construction, & Contracts Manager, on The Manzanillo to Guadalajara 30” Pipeline Project, Mexico. Management, Supervision, Planning, and Coordination of the entire Construction Team, and manage all the support for Specialist HDD Sub Contractor OZ HDD. Assess, coordinate, and resolve all daily problems arising from a management, and organizational point of view. Provide Construction Input into the review of the Company’s detailed Engineering in form of a “Consistency Check”. Prepared and submitted for Client review many of the HSQ & E documents, and procedures. Prepared scopes of work for sub-contractors, and progressed through their tender submittals, negotiating through to award. Attended all weekly construction progress, QA /QC, and HSS + E meetings, and followed up on action tracking registers to close out business. Administered the Contract from a Contractual aspect developing claims for additional unforeseen works. Trained junior personnel, and provided guidance to them in the course of executing their duties. Ensured good working relationships were developed and established with the Client. Penspen for Cairn

Energy.

January 2009 –

December 2009.

Company Construction Manager on the Cairn Energy Barmer to Salaya Insulated Pipeline in India. The project involved laying a 24” insulated line c/w an integrally connected 1” SEHMS (skin effect heat management system) heat tracing tube system, a parallel 8” gas line, and Optic Fibre Cable in the same trench, plus Associated Pig Launcher, Receiver Stations, and AGI’s c/w Gas Fired Power Stations for the SEHMS system. Provided Construction Input into the review of Detailed Design, and Project Engineering. Management, Supervision, and Coordination of the entire Owners Construction Team, including HSE Advisors, Field Engineers, Archaeological Experts, Third party Consultants, Land Agents, Community / Cultural Affairs, and the Field QC Inspection Team. Assess, coordinate, and resolve all daily problems arising from non- conformance issues identified in the field. Ensured Contractor compliance with the Company’s HSS & E objectives, plans, and procedures. Chaired, and managed all weekly construction, QA /QC, and HSSE meetings.

Worley Parsons for

TRANSNET in South

Africa.

[ short assignment ]

August 2008 – Dec 2008

Company Representative in the Hall Longmore ERW Pipe Mill, and Three Layer FBE / PE / PP Coating Plant. Managed the QC team, and dealt with the day to day issues arising during the production works of both the Pipe Mill, and the Coating Plant. Dealing with all production / quality control / commercial / claims correspondence, and QHSE / progress meetings.

Wood Group for Hunt Oil Chief Inspector / Senior Company Rep. on the Peru LNG Andean Pipeline Project. Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-4-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** July 2007 – August 2008

Initially technical and commercial appraisal of the four Qualified Contractor tender bid packages, there-after:- Management, and Supervision of the entire Owners Management Team, including Health & Safety Advisors, Environmental Engineers, Field Engineers, Archaeological Experts, Third party Consultants, Land Agents, Community / Cultural Affairs, and the Field QC Inspection Team. Coordinate, and resolve any daily problems, non-conformance issues identified by the aforementioned personnel, or their reported inspections, with the Contractor. Compile a comprehensive project QA dossier. Promoted to Contracts Manager in March 2008 to deal with the contractually aggressive Contractor. Dealing with all commercial / claims correspondence, meetings, and managing the proceedings in the interest of the COMPANY. J P Kenny

Nov 2006 – May 2007

Working on the Phu My to Ho Chi Minh Gas Pipeline Project in Vietnam. Supervision of the Topographical Survey and Geotechnical works subcontractors, on site, in Vietnam. Supervise the drawing department, manage the drawing review process, subsequent drawing revisions, and issue of approved for construction alignment sheets, & typical details for the pipeline. Provide support to the Design Engineering Team. Moody for ExxonMobil

July 2006 – Oct 2006

The Adriatic 30” diameter LNG Pipeline, and Shore Approach in Italy Worked on a short term assignment as Horizontal Directional Drilling Superintendent, supervising, and managing the day to day operations, (from the Client’s perspective) of two specialist HDD sub-contractors, Drill Tech, and PATO. Moody for BP

Jan 2003 – May 2004

Senior Company Representative on the 42” BTC, & SCP Pipelines in Azerbaijan. Review, and approve method statements, procedures, drawings, Engineering, and HSE documents to establish acceptable working practices. Single point of contact for resolving all construction related issues, including logistics, equipment utilization, environmental mitigation, field engineering, complete execution planning for construction, and pre-commissioning. Lead and manage expatriate team of field QC specialists, and construction superintendents. Supervise all spread activities, including automatic welding, and major Horizontal Directional Drills. Promote accident and incident free culture throughout the project.

Penspen, for Bord Gais.

and FPT in Thailand.

January 2002 to

December 2002, plus

June 2004 to July 2006 Construction Manager

Construction Manager Initially assigned to the new Bangkok International Airport project to manage the local contractor installing the aviation fuel ring main, valve chambers, and distribution hydrants. Manage day to day running of the project including civil, and mechanical work supervision, quality, safety, and environmental issues, review and comment/approve technical submittals, drawings, method statements, procedures etc. Later assigned to the Bord Gais 36” Diameter Pipelines from Beattock Compressor Station to Cluden AGI near Dumfries… …Supervised all aspects of construction in the role of Field Project Engineer, liaising with the Entrepose Spread Boss to resolve construction and Engineering related issues, and with the Company QA Manager to accept the works as they progressed, assisting with the QA “hand over” dossiers. On completion I was re-assigned back to the New Bangkok Airport Project, to manage the construction of the aviation fuel supply pipeline a unique project encompassing, micro-tunnelling, sixteen Horizontal Directional Drills, street works, and severely restricted work areas. Successfully achieved independent (AJA), ISO 9001 accreditation for Penspen, based upon audit of my project control systems. At project completion, I was re-assigned by Penspen, as Senior Construction Manager on the Bord Gais, South North 18” diameter gas pipeline running from Dublin to Belfast.

1973-

2002

November 2000 to January 2002 Pipeline

Engineer NACAP/Lawrence

Project & Duties: TRANSCO 1220mm OD Gas Pipeline from St Fergus to Aberdeen. Initially design GL5 coordinator, preparation of Q.A. / Q.C. procedures, drawings, method statements, and risk assessments for presentation to TRANSCO, and the affected third parties in order to obtain consents, e.g. SEPA, Rail track, Shell, Highways Agency, Local Authorities etc. Coordinate topographical surveys and liaise with project design team for the production of the design drawings, and project programme. Supervised and provided Engineering support to the spread construction activities including specialist sub-contractors Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-5-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** working on drilling & blasting, pipe jacking, auger boring, and micro tunnelling. Coordinated all works for

“Hot Tap” connections to a parallel 900mm OD pipeline including design, drawings, procedures, specialist sub contract, and permits. Provided solutions to, and generally resolved the Clients areas of concern. June 2000 to November 2000 Engineers Construction

Manager KVAERNER

E&C UK Ltd

Project & Duties: Rugby Cement 11” OD Slurry Pipeline, Phase Two, encompassing seven horizontal directional drills. Performed all duties as the Client’ s representative supervising and administering the mainline spread contractor and the specialist horizontal directional drilling sub-contractor,… (Dredging & Construction). Actively involved in contractual issues over “unforeseen ground conditions” and the consequential claims. Supervised the subordinate quality control inspection team, providing daily engineering support, and arbitration / decisions on contentious or non-resolved construction issues during pipeline construction in the field.

May 1999 to May 2000 Project Engineer

JOHN LAING PIPELINES

Project & Duties: Rugby Cement 11” OD Slurry Pipeline, Phase One, Engineering liaison with the client. Control horizontal directional drilling sub-contractors:- HDI, Stockton, & LMR, auger bore, pipe jack, radiographic and drainage subcontractors. Provide engineering support to the civil and mechanical Construction Managers. Prepare, revise and issue method statements/procedures. Organise document control. Provide assistance to the QS on contractual/commercial issues, and deputise for the Project Manager, during his absence.

September 1998 to April 1999 Company Resident

Engineer PREMIER PETROLEUM

MYANMAR LTD.

Project & Duties: Employed on the Yetagun 600mm diameter pipeline as the. Responsible for all the contract liaison, administration, engineering, quality control, safety and environmental issues arising on a daily basis with project construction contractors: - J.Ray Mc Dermott for the beach pull, and McConnell Dowell for the cross country pipeline. The project itself was particularly unique, traversing 30 to 40 degrees gradients which dictated special section construction techniques, all of consequence requiring detailed engineering method statements, & risk assessments, rigorous safety, quality, engineering and environmental supervision.

August 1997 to August 1998 Company Rep in Coating Plant/Pipeline Construction Manager

THE PETROLEUM AUTHORITY OF THAILAND (P.T.T.)

Project & Duties: 350mm diameter pipeline, and parallel fibre optic cable installation in Thailand. Initially Company Rep. In Bredero Price’s coating plant, managing the production, and quality control of internal lining application and external FBE coating. Witness and accept all production Q.C. Testing and supervise subordinate staff. Transferred to the pipeline as Construction Manager. Plan and supervise the pipeline construction, fibre optic cable and above ground facilities installation, ensuring quality standards, safe working practices, and environmental control. Chaired all progress, contractual, and safety meetings. August 1996 to August 1997 Construction Superintendent FLUOR DANIEL

Project & Duties: 720mm diameter and 530mm diameter pipeline refurbishment and construction in Azerbaijan.

De-commission, and re-validate existing oil pipelines by lift, relay, and hydro test. Construct new pipeline sections. Supervision and control of subordinate Engineering, and Q.C.staff, ensuring that works were carried out in accordance with the strict permitting constraints. Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-6-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** February 1995 to July 1996 Construction Manager

BECHTEL

Project & Duties: PTT 900mm diameter Pipeline in Thailand. Construct pipeline extensively by horizontal directional drilling, and push section construction techniques. Managed the day to day running of the Field Engineering, and QC group on behalf of the Owner. September 1992 to April 1994 Resident Engineer JOHN BROWN ENGINEERS Project & Duties: Thappline 200 Km… 600mm diameter Pipeline, & parallel Fibre Optic Lay in Thailand. Complete management, engineering, safety surveillance, and supervision of pipeline construction, horizontal directional drilling, fibre optic cable installation, splicing and commissioning. All duties under the contract as the Engineer’s Representative.

January 1991 to September 1992 Assistant Construction Superintendent BECHTEL

Project: Shell North West Ethylene 10” diameter Pipeline. Duties: Responsible for twenty subordinate, engineering and Q.C. staff. Implement procedures and method statements. Organize, and edit detailed reporting, & compile final Q.A. dossier documentation package. Supervised all the Pipeline Construction, land drainage, and reinstatement works. January 1990 to December 1990 Field

Engineer JOHN BROWN ENGINEERS

Duties: All field Engineering, design changes and drawing revision. Issue site instructions and Contractual/technical correspondence. Supervise construction of HDD, open cut, pipe-jacked, auger bored crossings, plus hydrostatic testing on 10” diameter Petrofina Pipeline. May 1989 to November 1989 Senior Pipeline

Inspector

C.M.P.S. William Brothers, Brisbane, Australia

Duties: Managed QC Inspection Team to execute all aspects of daily quality control on welding, and coating disciplines on the 12” diameter Queensland State Gas Pipeline.. January 1988 to May 1989 Project

Engineer

McConnell Dowell / HDI Australia

Position: on Esso Dolphin Subsea HDD, beach pull, and pipeline (for the Contractor.) Duties: Managed the full mobilization and towing of a “dumb” crane barge from Geelong to SeaSpray, to all marine, insurance and client specs. Coordinated the outfall horizontal directional drill with marine and land based operations for the pipeline beach pull by the barge, and subsequent pull back by the HDD rig. Lay cross country pipeline for 40 Km to the ESSO plant at Sale. March 1988 to November 1988 Ast. Resident Engineer & Project Safety Officer NGL Pipeline, Cruden Bay, British Petroleum Development (UK) Ltd Duties: All field engineering:- Review and approve subcontractor design drawings for crossings of roads, railways and rivers. Liaise with third parties on permits, interfaces, certification, documentation and engineering. Conduct H S & E Inspections, Tool Box Talks, and Weekly H S & E Meetings. Deputise for Resident Engineer. Coordinate the QC team.

April 1987 to February 1988 Quantity Surveyor and Pre-commissioning Engineer Total’s North Alwyn platform, North sea -Alfred McAlpine Services & Pipelines Duties: Supervised and coordinated extensive pigging;- cleaning, gel trains, diffuser pigs, and gauging runs. Shift engineer during pigging, hydrostatic pressurisation, testing and vacuum drying. Liaise with

“Hook Up” contractor for support services. Maintain records, and administration to record progress for payment, commercial issues and contractual/contentious issues. Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-7-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** JULY 1985 - SEPTEMBER 1986 WILLIAM BROTHERS ENGINEERING LTD Senior Inspector on ARAMCO 1500 Km, 56” diameter East-West Pipeline, in Saudi Arabia. Senior Pipeline Inspector for Q.C. on pipeline activities: - pipe string & bend, front end welding (CRC automatic), excavation, F.B.E. coating & shrink sleeve wrapping, lowering-in, tie-in welding, and pigging.

November 1986 - March 1987, August 1984 - June 1985, and January 1983 to January 1984 Gulf Interstate Engineering, Houston, Texas, U.S.A.

Assistant Chief Inspector

Responsible for daily management and supervision of the expatriate Q.C. inspection team on ARAMCO Gas Pipelines, and Yemen Hunt Pipelines ensuring high standards were achieved. Liaison with project management on QA/QC, and Engineering; and with the contractor on all quality issues. March 1984 - August 1984 LAING ENGINEERING, &

CONSTRUCTION

Foreman/Side Boom Operator

Operator of CAT 583 Side Boom Pipe Layer on bending, and tie-in crews. Promoted to special section foreman on construction of pipeline through mountainous and peat bog terrain at Shap, Cumbria. August 1981 to December 1982 Project Engineer Trans Quebec, and Maritime Duties: Pipeline Route selection, flagging for survey, and re-routing. Some geotechnical work. Worked with Welding Engineer on WPS, WPQRs, and welder qualification. Reassigned to the hydro-testing – calibrated instrumentation, pigging works, and high pressure testing. June 1980 to June 1981 Contracts Administrator Arabian Bechtel

Duties: All Q.S. work, contracts, & commercial administration, contractual control, document review, estimating, sub contract appraisal, variations analyses, and valuations. Administered six separate contracts simultaneously.

August 1973 to June 1980 Quantity Surveyor Turriff Engineering Pipeline Division Duties: Site Management and Quantity Surveying. Measurement for progress payments and final accounts. Administer sub-contracts, site measure with Clients QS, complete abstracts, draft contractual correspondence, and prepare claims.

TRAINING AND EDUCATION

2018 Chevron Working at Heights

2018 Chevron Confined Space Entry

2018 Chevron Safe Excavation Practices

2018 Chevron Lifting, and Rigging

2018 Chevron Incident, & Injury Free [ IIF ]

2018 Chevron H2S Awareness

2018 Chevron Human Machine Interface [ HMI ]

2018 Chevron Fire Safety Training

2017 BP Defensive Driving

2014 BP Defensive Driving Training.

2014 BP Permit to Work, and Authorized Authority Training. 2013 Defensive Driving Training.

2012 JMJ:- Integral Operating System [ IOS AQUAL ], Integral Analysis Training 2011 CSR Pipeline Safety Training, Defensive Driving Training, CPR Training, OSHA 30 hour Training, 2008 “Acconex” Document Control Training. Defensive Driving Training, 4X4 Classroom, and Off Road Training 2007 Advanced 4X4 Classroom, and Off Road Training. 2006 Construction Skills Register “Health, & Safety Awareness”. 2003 Extensive HS&E Training through BP, …….STOP, GHSER, Risk Assessment, etc,…Passport Available. Gordon John Black

Project / Construction Management Consultant

Midstream Energy – Pipelines, and Facilities

-8-

Bluebell Lodge, Knapp Road, Westwood End, Ballathie, Kinclaven, Perthshire, Scotland, UK. PH1 4QL. Email: adl0vc@r.postjobfree.com Phone 075**-****** 2001 National Plant Operators: - Safety Awareness, & Operator’s Competency:- Side Boom, Dozer, & Back Hoe. 2001 TRANSCO: - Course on method statement compilation, & GWINTO “Safety Awareness”, & Fire Training. 2000 Laing’s ISO 14001 Accreditation Environmental Awareness Workshop / Course 1999 NEC, IChemE, and Basic Principles Conditions of Contract training. Excel 2000, & Word 2000 training. 1999 CITB construction certificate, & safety awareness in Plant and Machinery,…Side Boom, Dozer, & Backhoe. 1997 R.G.I.T.: Leiro 1, 2, and 3 Survival Courses

1992 Premier Oil computer courses, Environmental Awareness



Contact this candidate