House *,
Mahogany Place
Bayview
Chatsworth
***2
Phone: 065******* /
4013321/078*******
E-mail:
adl0je@r.postjobfree.com
SANJEER SILAJEETH
Education
Matric/grade 12 M L Sultan Secondary
English
Afrikaans
Mathematics
Technical drawing
Physical Science
Metalwork and welding-N3
Employment History
1.Production Operator (Ninian and Lester)
1993-1997
1.1.machine setting
1.2.1.2 lab Testing
1.3.Color Matching
1.4.Sample testing
1.Production coded welder (Duys Component manufacturers)
1997-1998
1.1 Assembly of Toyota/Man Truck and Bus components
1.2 Final welding
1.3 Kanban process
2.Quality Control Inspector (Duys Component manufacturers)
1998-2001
2.1 ISIR Samples-measuring, dimension reports, inspection reports
2.2 Production line inspection according to drawing specification
2.3 First off tool sample
2.4 Receiving inspection
2.5 Verification and calibration of instruments
2.6 Jigs,gauges,checking fixtures
3.0 Quality Assurance Auditor (Duys Component manufacturers)
2001-2002
3.1 Setting and implementing ISO TS16949/9000
3.2 Controlling of quality management systems
3.3 Auditing of all processes (product, systems and dock audits)
3.4 Measuring systems analysis
3.5 Training of supervisors and shop floor to ISO standards
3.6 Management review/core processes
3.7 Planning and scheduling of audits
3.8 Review of findings
3.9 Corrective action and preventive action
3.10 Control of non conforming products
4.0 Quality Assurance Auditor/Supervisor (Duys Component manufacturers) 2002-2008
4.1 Overseeing of all quality inspectors
4.2 Problem solving techniques
4.3 Implementing core tools for kaizen purposes
5.0 Quality Assurance Engineer/Auditor
2004-2008
Promoted to Quality Engineer Automotive OE / A Market
5.1Inspection & Testing of components to SABS standards and requirements eg.
a)Tow bars
b) Roll bars
c) Vehicle Bodies Building eg.tippers,rollbacks, tankers,Toyota van Bodies, and dropsides.Supervise and Train painting/Powder coating. Viscosity checks/Paint thickness checks.
d)TSZ 001-Substance of concern
e)Implementing of POKA YOKE devices
f)Documentation Control
g)Layout Inspection
h)Process flows
i)Implementation of ISO 14000 impact and aspect analysis
Professional Duties
Setting up ISO TS16049/9001/ISO14001
Inspection and testing-SABS (Towbars,Chasis,Safety Critical)
Homologation
Liaising with SABS
Calibration
Statistical process control
Internal audits
QA Training
Engineering drawing
SABS audits
Supplier audits
FMEA/Flowcharts/Control plan.
Procedures
Works instructions-ISO 9000/14001/TS16949
Control of Quality network
Daily Quality training of all teams
Language
English/Afrikaans
Marital status
ID No
Married
Present position Quality Assurance Engineer (Mechanical Engineering)
Professional Qualifications
Bsc Engineering/Industrial Technology and Management
Presently completing BSc at PMI
Production management 3
Quality management 3
Logistical management 3
Financial management 3
Quantitative Methods 3
Human Resources
IAP 3
Courses completed
TS 16949-SETTING UP SYSTEM
MSA
1SO AUDITOR 19011/17021-SABS
SPC
HEALTH AND SAFETY
QUALITY CONTROL TRAINING
6G GTAW WELDING/MMAW/SMAW
MDW TRAINING
SUPERVISORS TRAINING
NOSA
PIPE FITTING
RISK ANALYSIS
TOYOTA PRODUCTION SYSTEMS
SASSDA STAINLLESS STEEL TRAINING
ISO 14001:2015
QUALITY CONTROL CIRCLES-TRAINING -DAILY.
SAATCA REGISTRATION ISO AUDITOR-SABS-WIP
IS0 14001 LEGAL REQUIREMENTS-SABS
ISO 9001:2015
BRILLIANT WRITING SKILLS
PEOPLE MANAGEMENT AND LEADERSHIP.
DECISION MAKING
TEAMWORK
HEALTH AND SAFETY SUPPORT-RISK ANALYSIS/ACCIDENT PREDICTION
OSH ACT
MICROSOFT EXCEL LEVEL 2-360
International qualification
City and Guilds, London in Quality Assurance, Plexus.QC ENGINEER
Refer Raj Harrilal-082*******.
License Code 08 / Crane license / F/Lift license
Reference
Sheron Fenner-- Duys Component Manufacturers
Employment History (Maxe Stainless Steel (June 2008 - May 2010)
6. (Toyota PPO Legend 40 Hilux Project)
6.1 Manage and control of inputs/output
6.2 Management review at Toyota
6.3 Kanban
6.4 Line balancing
6.5 Setting up of ISO 9001:2015
6.6 Problem solving and countermeasures techniques
6.6 Training of operators on line per bay
6.7 Training of quality standards
6.8 Cycle time per unit
6.9 Quality defect tracker
6.10 Measure and control processes
6.11 Defect and Countermeasures
6.12 Control of Non conformances (Internal and External)
Reference
Clayton Wait - Maxe Stainless Steel
(PAST Employment (TOYOTA TSUSHO SA PROCESSING-PROSPECTON)
7.0 QUALITY ASSURANCE SPECIALIST- (2010-2020)
7.1 Maintaining the quality management system. Conducting of all internal audits (ISO 9001:2015) (ISO 14000:2015) (OSHACT).Improvement techniques, cost reduction, control of non-conforming devices, health and safety.Measuring system analysis.Problem solving devices and techniques. Management review. Defect analysis. Statistical process control. Maintaining ISO 14001.Training of all managers and shop floor.Customer complaints. Quality circle-Training of all staff. Defect analysis. Scrap meeting. Prevention Maintenance (Dies,Blanks,pressing,forming).Master sample off tool. Receiving of containers-CvT technology.Streamline Human Resources -succession plan training. Safety/Induction Training, Contractors Safety File Preparation .e.g. "Letter of Good Standing". Yield loss Calculations. Supplier performance Meetings (Arcelor Mittal).Monthly supplier meetings - (Arcelor Mittal/Nippon Steel/Thyssen/Posco.) Risk assessments. Calibration, GAGE R-R Studies. Quality Training. Risks Assessments. Internal canteen audits.
8.0 QUALITY ASSURANCE ASSISTANT MANAGER - (2010-2020).
8.1 Supplier/Customer Liaison
8.2 Support with Budget FY
8.3 Customer Survey Index
8.4 Investigation/Reports for Top management
8.5 HR support-Skills development
Currently resigned.
Willing to start immediate and relocate if it's a requirement of the company.
I am willing to start and grow successfully in an organization
Reference: Nundha adl0je@r.postjobfree.com