CURRICULUM VITAE
Mirza Naseer Baig
E-mail : adl02e@r.postjobfree.com / adl02e@r.postjobfree.com,
Mobile No :+91-879******* / +658*******
Career Objective:
To work with the challenging environment where I can be a valuable team member contributing my ideas and put my best in every task undertaken and to update my knowledge everyday according to the new trends.
Strengths:
Excellent blend to support to site engineer for execution & DLP Maintenance.
Capable of Generating Project Documentation & Technical Submittals.
HVAC Designing by using HAP & Elite.
Educational Qualification:
Bachelor of Technology in Mechanical Engineering -Year 2006
Diploma in Mechanical Engineering -Year 2002
Total year of Experience: 10+
Professional Experience in Past company ( Universal Voltas ):
Having 4+ years experience in HVAC Designing, preparation of shop drawing, BOM & Installation works.
Present Employment:
Company name : SEA2SEA International Pte Ltd
Division : Engineering
Designation : HVAC Engineer
Duration : March 2020
Client : Shipyard
Previous Employment:
Company name : Universal Voltas LLC
Division : Engineering & Service
Designation : HVAC Engineer
Duration : Sep 2014 to May 2019
Client : ADNOC
Designing & Detailed Engineering:
Studying the scope of work; specifications of the assigned project and designing HVAC
Systems as per the requirements.
Preparation of HVAC Design basis
Design & development of HVAC Calculations
ESP calculations
Pump head calculation
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC abbreviations, Symbols & General notes.
Design & development of Basic Air flow scheme
Design & development of Single line Duct design layouts
Preparation of Data sheets
Preparation of HVAC Material Take off
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC Control schematic drawing
Preparation of HVAC Equipment schedule
Coordination with other disciplines
Material take off ( MTO )
Major Projects Handled:
Power Generation Units Retirement Project-GASCO Project no. 5283-Bab/Habshan Package, Abu Dhabi.
Power Generation Units Retirement Project-GASCO Project no. 5283-Asab/Buhasa Package, Abu Dhabi.
Rumaitha North CO2 injection Project, ADCO, Abu Dhabi.
Higher College Of Technology Abudhabi
ESI Carbon Capture Project ( Masdar)
Modification works Transco Room - GASCO
Additional UPS Das Disaster Computer Room Telecom building - ADMA
New Laundry Building, GASCO-Habshan, Abu Dhabi.
Previous Employment:
Company name : TECHNIP MIDDLE EAST ( Qatar)
Division : Engineering
Designation : HVAC Engineer
Duration : MAY 2013 TO Nov 2013
Role and Responsibilities:
Design & development of FEED design
Design & development of detail design
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
Preparation of Basic Air flow scheme
Preparation of Single line Duct design layouts
Preparation of Data sheets
Preparation of HVAC Material Take off
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC Abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
Preparation of Basic Air flow scheme
Preparation of Duct design layouts& HVAC details drawings
Preparation of HVAC Section drawings
Preparation of HVAC Control schematic drawing
Preparation of HVAC Equipment schedule
Preparation of Data sheets
Preparation of HVAC Material Take off
Coordination with other disciplines
Technical offer evaluation & TBT
Material take off ( MTO )
Employer:
Company name : AL TOUKHI Trading & Contracting Co ( Saudi Arabia )
Division : Engineering
Designation : HVAC Engineer
Duration : December 2010 to January 2013
Role and Responsibilities:
Design & development of detail design
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
ESP & Pump head calculation
Preparation of Basic Air flow scheme
Preparation of Single line Duct design layouts
Preparation of Data sheets
Preparation of HVAC Material Take off
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC Abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
Preparation of Basic Air flow scheme
Preparation of Duct design layouts& HVAC details drawings
Preparation of HVAC Section drawings
Preparation of HVAC Control schematic drawing
Preparation of HVAC Equipment schedule
Preparation of Data sheets
Preparation of HVAC Material Take off
Coordination with other disciplines
Technical offer evaluation
Material take off ( MTO )
Participation in Tender for designing & BOM
Identifying the snags and coordinate with Project team Vendors to resolve them.
Spare Parts review, indents and procurement if required.
Scheduling for daily and weekly check.
Reviewing history records of key machines for repeated breakdowns to analysis and carrying out necessary corrective actions.
Employer:
Company name : ARAMEC (CCE SISTER CO.)
Division : Engineering
Designation : HVAC Engineer
Duration : Sep 2007 to Nov 2010
Role and Responsibilities:
Tender review HVAC scope of work
Verify the design calculations
Preparation of Basic Air flow scheme
Preparation of Single line Duct design layouts
Preparation of Data sheets
Preparation of HVAC Material Take off
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC Abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
Preparation of Basic Air flow scheme
Preparation of Duct design layouts& HVAC details drawings
Preparation of HVAC Section drawings
Preparation of HVAC Control schematic drawing
Preparation of HVAC Equipment schedule
Preparation of Data sheets
Preparation of HVAC Material Take off
Coordination with other disciplines
Technical offer evaluation
Material take off ( MTO )
Site execution work
Employer:
Company name : Comfort line System Pvt LTD ( INDIA )
Division : Engineering
Designation : HVAC Engineer
Duration : August 2006 to June 2007
Role and Responsibilities:
Verify the design calculations
Preparation of Basic Air flow scheme
Preparation of Single line Duct design layouts
Preparation of Data sheets
Preparation of HVAC Material Take off
Preparation of HVAC Drawing Summary sheet.
Preparation of HVAC Abbreviations, Symbols & General notes.
Preparation of HVAC Design basis
Preparation of HVAC Calculation notes
Preparation of Basic Air flow scheme
Preparation of Duct design layouts& HVAC details drawings
Preparation of HVAC Section drawings
Preparation of HVAC Control schematic drawing
Preparation of HVAC Equipment schedule
Preparation of Data sheets
Preparation of HVAC Material Take off
Coordination with other disciplines
Technical offer evaluation
Material take off ( MTO )
Site execution work
Identifying the snags and coordinate with Project team Vendors to resolve them.
Spare Parts review, indents and procurement if required.
Achievements:
Qatar Gas Approval as a HVAC Design Engineer
Winner in cricket Tournament championship conducted by Voltas Group Year 2016.
Reorganization award for Preparation of material request and deliver to the site within the time to execute the site works on time.
Computer / Software Knowledge:
AutoCAD 2010.
MS Office/ Excel
SAP
Elite Duct sizing/ESP calculation.
Personnel Information:
Name : Mirza Naseer Baig
Father’s Name : S/O. Mirza Basheer Baig
Sex : Male
Marital Status : Married
Nationality : Indian
Languages Known : English, Hindi &Telugu
Hobbies : Cricket
Passport Number : K0827090
Declaration:
I hereby declare that the above information furnished by me is true to the best of my knowledge and belief.
Yours Faithfully,
Place :
Date : Mirza Naseer Baig