Post Job Free

Resume

Sign in

Electrical Engineer Maintenance

Location:
Kolkata, West Bengal, India
Posted:
March 12, 2021

Contact this candidate

Resume:

TANMOY DAS

Mobile: 980-***-****

Email- adkvm5@r.postjobfree.com

CAREER OBJECTIVE- To work in an organization that appreciates innovative, demands analytical. Provide a challenging and performance driven environment and a wide spectrum of experience to grow and excel in my career. I aim to create meaningful contribution to the organization through my skill and abilities and to continuously improve on my professional knowledge and skill.

PROFILE SYNOPSIS

Result Oriented Professional Possessing 10+ Years of Experience In Career.

Offer Opportunity to make best use of knowledge, analytical and technical skills, to further enhance knowledge in profession and a job profile that offers high growth prospect.

Expertise in the Specific Domain Associated With.

Hardworking, Competent & Efficient.

Smart, Dynamic & Talented to Play a Positive Role in a Challenging Environment.

Good Communicator with Excellent Presentation, Team management / Building & Motivation Skills.

COMPETENCIES:

for achievement

Planning and organization

Concern over costing

Influence and impact

Team player

EMPLOYMENT SCAN:

Company Name Grow Ever Steel (India) Pvt Ltd

Designation HEAD Electrical Maintenance

Duration NOV’ 2015 To Till Date

ROLES & RESPONSIBILITIES:

From 2/11/2015 to presently Working at Grow Ever Steel (India) Pvt Ltd as Snr. Engineer & HOD of Electrical Maintenance department.

Responsible for whole activities of electrical maintenance department of Unit I, 2 Nos Tube Mill and Unit II, Compressed nut department.

Controlling Through Shift in charge Supervisors Electrical Technician & apprentice according their needs in plant.

Look upon Spare and Develop, repair or Indent to maintain them.

Solid State HF Welding Plants 200 kw and 150 kw H.F welders (by UNITHERM) Maintenance.

Responsible for all kind of Electrical maintenance work of Utilities machinery like Air Compressor(Elgi), DG (180 Kva) Kummins etc.

Familiar Working with PLC (Siemens, Delta, Schneider Etc) HMI, Encoders, DC motor, Digital DC Drive( Control Techniques/Emerson) Servo drive (Siemens), AC drive (Siemens/ Danfoss ) Motion controller, Vibrators feeder etc.

Maintenance Of CNC Production line.

ISO 9001 & 14001 Work and other Official work.

ACHIEVEMENTS:

Project Work at grow ever steel (India) Pvt Ltd:

Unit-II Establishment work.

11kv substation,VCB, Transformer 500 KVA (OLTC), PCC, MCC, ( as per need drawing and making) Cable Laying, Air Compressor (Elgi) Installation as per need of new compressed nut department.

150 Kw New Tube mill (Upto 32mm OD) Erection and commissioning.

COC Of Old Mill Replacing.

Extended Unit-I and set up Cut To Length facilities.

New CNC line set up at Unit-II

Extended portion of Unit-II for New product development.

Company Name Essilor India Pvt Ltd

Designation Jn Engineer Maintenance

Duration April 2015 to October 2015

ROLES & RESPONSIBILITIES:

As an electrical shift in charge of Lab controlling the Technicians.

Follow up the routine maintenance of the machines.

Take care Of VFT- Ultra, PRA Blocker, DLP, CCM, Multi Coat, FOG ID, Edging Machine.

Responsible for all kind of maintenance work of Utilities machinery like UPS (EATON), stabilizer, Compressor (ELGI), Chiller, DG (Cummins) etc.

Spare development and electrical costing calculation of Lab.

Company Name Utkarsh Tubes & Pipes Ltd (Utkarsh India Ltd)

Designation Snr. Electrical Engineer

Duration Sept 2010 to April 2015

ROLES & RESPONSIBILITIES:

Electricity costing of different department, cost control, energy conservation.

Controlling Through Shift in charge Supervisors Electrical Technicians & Helpers according their needs in plant.

Look upon Spare and Develop, repair or Indent to maintain them.

Responsible for PVC plant 5 nos Extruder KTS-200- 2 Nos, KET-52, KTS-90, KTS-350 (Windsor & Kabra), Mixing, Belling etc .

ERW Oscillator Tube Type & Solid State HF Welding Plants 250 kw H.F welders by INDUCTOTHERM (THERMATOOL) Maintenance.

Handle 33/11/0.440 kv indoor substation, Transformers up to 4 MVA, 6 tube mills, DC Motors up to 315 kw, Slitting Mill, 6 Extruders, 28Nos EOT Cranes up to 30 MT, PLC ( Schneider, Allen Bradly) Systems, AC & DC Drives, Compressor, GI plant, Boiler, 3 Nos. DG 500 kva each, Stabilizer maintenance.

Working with HMI, Encoders, Servo motor, Dedicated Motion controller, Simo Drive etc.

ISO 9001 & 14001 Work and other Official work.

Checking & Testing of Indoor / Outdoor Motor Rewinding Department.

ACHIEVEMENTS:

From Nov 13th 2013 to April 23th 2015 totally attached with a New PVC plant Establishment project at Gurap Hooghly. During this period planning, Execution done of following machinery:

uPVC Extruders KET-52, KET- 180, KTS-350 (Double Die),KTS-250, KTS-450, KTS-700 (Double Die)

1 Nos CPVC Con-63 Extruder by Thyson. 1 Nos Palletizer by Kabra Ext tech.

HDPE Extruders Solex 250 & 450 By Kabra Ext Tech.

Mixing Machine 4 Nos for Injection Moulding.

10 Nos Injection Molding M/C ARM 180, ARM 250 (For CPVC), ARM 350, ARM 705, ARM 350 (Old), ARM 1480, Feromatic 200, Polo Smart 180, Polo Smart 350, Omega 200.

Automatic Online Belling Machine by VIHAN, 315 & 110.

Silo & Automatic Mixing ( 2 Nos 300kg per batch Mixture by Kabra), Conveying System with SCADA by Prasad.

PVC Plant Laboratory, Machine Shop, CNC Lathe for Threading, Quarter, Road Light, Shed Light Etc.

11kv substation, Transformer 1.25 MVA (OLTC), PCC, MCC, Cable Laying, DG(725Kva TIL/ CAT), Chilling Plant (Prasad), Air Compressor (Atlas Copco) Installation.

Installation Completed on September 2014. After that I am responsible for maintenance department and acting HOD of the new project since leave the Job.

Company Name Singhco Electrical Enterprises

Designation Astt Electrical Supervisor

Duration June 2009 To July 2010

ROLES & RESPONSIBILITIES:

Look upon of field technician’s works.

Installation of AC & DC Motors.

Underground XLPE Cable laying & Jointing.

Supervising of Installation overhead bare lines.

VOCATIONAL TRANINGS:

Training in Transmission (O&M) at Adisaptogram 132KV substation.

Familiarization Training in the Department of Operation & Maintenance at NTPC Limited,Farakka

EDUCATION.

2009: Passed B.Tech in Electrical Engineering from West Bengal University Of Technology.

2005 : Passed Higher Secondary Examination From West Bengal Council of Board of Secondary

Education.

2003: Passed Secondary Exam From West Bengal Board Of Secondary Education..

HOBBIES:

Painting, Listen music etc.

Cooking of Different Cuisines.

STRENGTHS

Good Communication Skill.

Smart, Dynamic & Challenging To Play A Positive Role In a Challenging Environment.

Sincere & Hardworking.

Good Leadership Skills.

Can solve intricate technical problems

Through Detailed Analysis.

PERSONAL DOSSIER:

Father’s Name Basudeb Das

Date Of Birth 22 th Sept, 1987

Address Vill +Po: Jagadishpur Hat, (Near Jagadishpur SBI)

Howrah,Pin: 711114

Sex Male

Nationality Indian

Religion Hinduism

Marital Status Married

Linguistic Proficiency English, & Hindi, Bengali

Notice Period 30 days

Declaration: - I hereby declare that all the Information Furnished Above are true to the best of my Knowledge.

Date:

Place: (TANMOY DAS)



Contact this candidate