Post Job Free
Sign in

Electrical Engineer Power Plant

Location:
Chennai, Tamil Nadu, India
Posted:
March 12, 2021

Contact this candidate

Resume:

R.ASHOKKUMAR,

Mobile No: +91-989*******,

Mail Id: **************@*****.***

OBJECTIVE

Aspiring for a career to travel in the path of success utilizing my talents and become adept at my work that contributes to the growth of the company.

PROFESSIONAL EDUCATION

MBA Project Management, December 2013, Alagappa University

Bachelor Of Engineering in Electrical and Electronics, April 2001

University of Madras.

EXPERIENCE SUMMARY

I’m an accomplished Electrical Engineer with a background in Power Projects, commercial, Industrial and Renewable Energy Wind Turbine Generator installations.

Having 9+years of experiences in Projects of, 132KV/33KV GIS and AIS Substations, 33KV & 11 KV Substation, 33KV &11 KV Overhead line, underground cable laying Transmission & Distribution Projects, Industrial Projects and BMS System

PROFESSIONAL EXPERIENCE

Name of the organization : A.M BREWERIES Pvt ltd,

Position held : Engineer –Project, Operations and Maintenance

Period : December 2012 to TILL DATE

JOB RESPONSIBILITIES:

Maintain the TNEB metering details and follow up with them

Operation and maintains of 1500 KVA DG

Responsible to team assigned for the preventative & corrective maintenance, installation, commissioning, dismantling, and trouble shooting of the 33KV / 11KV / LT OH distribution lines.

Periodical checking of all motors and industrial utilities (Compressor, VAM )

Lead the team of expert O/H Lines Engineers and allocates duties to them.

Ensure proper routine inspection for all O/H Lines CKT’S as per code of practice in order to detect the week points and rectify before break down to improve the system reliability.

Coordination with electromechanical materials suppliers to provide the BMS provisions in their equipment

Panel board coordination with suppliers to provide the panels matching with the projects specifications final approved panel board schedules, control and monitoring BMS points and correction components

Installation supervision of the project BMS works for the Electromechanical equipment for the following

EMT conduits and Cable trucking for all project area

All lighting and Emergency Lighting Panels

All main Distribution Boards

Pumps controls through BMS and local control panels

Motor control panels assembly for diffetent types of AHU Chiller,Air Compressor,Ammonia Compressor,VAM and Motors with different power rating

Experience in monitoring and control from central control room( UPS,Water management system, Electrical Management system)

Supervision of installation and commissioning of the field instruments like Sensors, Transducers, Differential Pressure Switches, and Control Valves

Name of the organization : Regen PowerTech Pvt Ltd., Chennai

Position held : Senior Electrical Engineer -TQM

Period : December 2011 to December 2012

Site : Tamilnadu, Maharashtra, Rajasthan

JOB RESPONSIBILITIES:

Erection, and Site Supervision of 132/11 KV Substation and 132 KV Double Circuit Transmission Line (around 15 KM. ) and Feeder Line 4 no’ s from Substation (around 50 KM) over head line

Preparing the Project Plan(PP) and Daily progress report(DPR)

Inspection of incoming materials of Mechanical and Electrical Parts as per Site incoming inspection checklist and updating the Inspection Report

Responsible to Ensuring safety were strictly followed in site

Prepare QC Inspection reports and monthly accomplishment reports.

Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored

OFC cable Spicing to be done

Around 10kms OFC cable laying to be done

Name of the organization : Win wind Power Energy Pvt Ltd. Chennai

Position held : Senior Electrical Engineer - Projects

Period : January 2011 to November 2011

Site : Jath, Maharashtra

try predicting and then finding out how many mugs of water are required to fill a bucket or whether the glass of milk/water/drink that you see is full, half or empty

JOB RESPONSIBILITIES:

Planning,Scheduling, Installation, Testing and Commissioning, Operation and Maintenance of 33KV Switchyards.(i.e. Transformers – 1250 KVA, Circuit Breakers, CT,PT and Double pole Materials, cable laying)

33KV overhead Line work surveying, Erection of Poles and String of line work from Main Substation to Group substation feeders and one WTG to another WTG

Regularly Tools, Safety,Quality and Environmental Training given to workers

Involved in Quality Management (IQMS)

Involved in Safety Management, Stores Management and Tool Management

Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored

GCC Experiences

Project : 4.5 MW Power Stations at Al Mazyouna

Client : Rae co

Position held : Site Electrical Engineer

Period : August 2009 to December 2009

Supervision for erection,Testing and Commissioning of 4.5 MW Power Station at Al Mazyouna Erection of Generator, Transformer,11 KV Panel,HT Cable, Fire Fighting, Control & Protection Panels, Small Power Lighting, Battery system, Ear thing system, Cable laying, and Cable terminations

Name of the organization : Atlas International Engineering – Muscat, Oman

Position held : Electrical Engineer- Projects

Period : August 2009 to October 2010

Project : Wadi Saa 132/33KV Grid Substation,

Client : Oman Electricity Transmission Company SAOC

Position held : Site Resident Engineer - Electrical

Period : December 2009 to October 2010

JOB RESPONSIBILITIES:

Planning Scheduling, Erection, and Site Supervision of 132/33 KV Substation and

220 KV & 132 KV EHV Transmission Line.

Erection and supervision of overall Earth mat grid laying

Erection and supervision of 132 KV GIS and its accessories.

Erection and supervision of 63 MVA Power Transformer

Installation and supervision of 132 & 33KV indoor switchgear panels and control panels

Monitoring the contractor QA/QC activities and maintain the records

Installation supervision of the project BMS works for the Electromechanical equipment for the following

EMT conduits and Cable trucking for all project area

All lighting and Emergency Lighting Panels

All main Distribution Boards

Fire Fighting controls through BMS and local control panels

Motor control panels assembly for different types of AHU Chiller, and Motors with different power rating

Ensuring the responses are complete and in compliance with the contract documents. Where problems are found, work with Project Engineer to resolve.

Following SHE policies strictly

Preparing the Project Plan(PP) and Daily progress report(DPR)

Preparing the SLD, specification and layout drawings, and cable schedule.

Responsible for the review of vendor drawings and documents.

Preparing the method statement for installation activities for approval.

Monitoring and coordinating the installation activities.

Reporting the work progress to the Project Manager on a daily, weekly and monthly basis.

.

Name of the organization : ETA Power project Division, Dubai

Project : 132/11KV substation,

Client : Dubai properties

Authority : DEWA

Position held : Site Engineer - Electrical

Period : August 2008 to March 2009

JOB RESPONSIBILITIES:

Planning Scheduling, Erection, and Site Supervision of 132/11 KV Substation.

Erection and supervision of 132 KV GIS and its accessories.

Erection and supervision of 63 MVA Power Transformer

Erection and supervision of 132 & 11KV indoor switchgear panels. And other control panels(SCP,LVAC )

Installation of Cable trays routing

Laying and Termination of Power cables and Control cables

Project Licensing and NOC from the consign developer and government authority(DEWA&TECOM)

Creating the non conformity reports for Contractors non compliances

Reporting progress

Monitoring the changes during Construction and ensuring permission is received from the Supervisors in writing

Co-ordination with consultant for equipment, material inspection.

Preparation of erection procedure for all equipment.(Method Statement,FQP )

Responsible to Ensuring safety were strictly followed in site

Knowledge about HVAC (Heating Ventilation and Air Conditioning)System MEP (Mechanical Electrical Plumbing)and BMS(Building management system)

Preparing the Project Plan(PP) and Daily progress report(DPR)

Name of the organization : VESTAS WIND TECHNOLOGY (I) PVT. LTD.,

Position held : Site Engineer - Electrical

Period : July 2005 to June 2008

Project Sites : Chitradurga, Karnataka Gudepanchgani, Karad,

Anthiyur, Coimbatore, Tamilnadu

JOB RESPONSIBILITIES:

Planning,Scheduling, Erection, Testing and Commissioning, Operation and Maintenance of 33KV Double pole Switchyards.(i.e. Transformers – 2250 KVA and 950 KVA, Circuit Breakers, CT,PT and Double pole Materials)

Planning,Scheduling,Testing and laying of 33KV XLPE Underground Cable around 10km from Main Substation to Group substation and one WTG to another WTG

33kv Line work surveying, Erection of Poles and String of line work from Main Substation to Group substation feeders and one WTG to another WTG

Laying and Termination of LT cables (3.5x300Sqmm, 3x70sqmm) for Transformer to Main Panel, Main Panel to Generator and Control Cables.

Regularly Tools,Safety,Quality and Environmental Training given to Co-workers and Contractors

Involved in Quality Management (IQMS) and Six Sigma Format

Involved in Safety Management, Stores Management and Tool Management

Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored

OFC cable Spicing to be done

Around 50kms OFC cable laying to be done

TRAINING ATTENDENTED:

Balance of Plant(BOP)

Tools Handling and Maintenance

Blade Manufacture and Repair

Safety,Fire and Environmental Training

Name of the organization : Mazagon Dock Ltd., Mumbai.(Contract Basis)

Project : proto type ship building (submarine)

Client : PRP Site BARC, Kalpakkam.

Position held : Electrical Engineer

Period : March 2002 to July 2005

JOB RESPONSIBILITIES:

Erection of IS & NIS, LCP’s, Switch Boards,

HT Cable schedule preparation, Laying and Testing of (3.5x400sqmm, 3x95sqmm, 3x70sqmm, 1x240sqmm, Fiber Optical Cables & Control Cables.)

Fabrication of Cable boxes, Cable boxes Assembly and Designing the Cable Routes

Cable Boxes Compound Filling,

Testing of Earthing & Lightning equipment’s for the towers and High Rising Buildings

Safety and Quality carried out through the work

Name of the organization : Thirumoorthy Hi-tech Company Pvt. Ltd., Chennai

Client : Southern Railways & Ennore Thermal Power Plant,

Position held : Site Supervisor

Period : May 2001 to February 2002

JOB RESPONSIBILITIES:

Replacement of Existing power cable and Laying of New Power cables (Unit 5). The Project has done for the Unit 5 has increased its capacity to180Mw to 350Mw.

Replacement of Defective Power Cable between Chennai Basin Bridge to Gummidipundi (47000mts) Completed successfully with in time under the guidance Of Mr.Srinivasulu

STRENGTHS

Self-motivated and ready to tackle any challenge.

Proven track record of absorbing new and complex concepts easily and adapting to highly demanding situations.

Exceptionally strong communication and team work skills.

COMPUTER KNOWLEDGE

Knowledge in SAP Material Management &Primavera

Operating System: Ms-Dos, Windows NT/95.

LANGUAGE KNOWLEDGE

English, Tamil, Hindi

PASSPORT DETAILS

Passport No : L3052040

Date of Expire : 29-08-2023

Onsite Experience : 8 months in Dubai, UAE

15 months in Muscat, Oman

PERSONAL DETAILS

Father Name : V.K.Rajamani

Date of Birth : 22nd December 1977

Marital Status : Married

Nationality : Indian

Permanent Address : 19/94, Big Maniyakara street,

Chengalpattu, Tamilnadu.

India – 60300



Contact this candidate