R.ASHOKKUMAR,
Mobile No: +91-989*******,
Mail Id: **************@*****.***
OBJECTIVE
Aspiring for a career to travel in the path of success utilizing my talents and become adept at my work that contributes to the growth of the company.
PROFESSIONAL EDUCATION
MBA Project Management, December 2013, Alagappa University
Bachelor Of Engineering in Electrical and Electronics, April 2001
University of Madras.
EXPERIENCE SUMMARY
I’m an accomplished Electrical Engineer with a background in Power Projects, commercial, Industrial and Renewable Energy Wind Turbine Generator installations.
Having 9+years of experiences in Projects of, 132KV/33KV GIS and AIS Substations, 33KV & 11 KV Substation, 33KV &11 KV Overhead line, underground cable laying Transmission & Distribution Projects, Industrial Projects and BMS System
PROFESSIONAL EXPERIENCE
Name of the organization : A.M BREWERIES Pvt ltd,
Position held : Engineer –Project, Operations and Maintenance
Period : December 2012 to TILL DATE
JOB RESPONSIBILITIES:
Maintain the TNEB metering details and follow up with them
Operation and maintains of 1500 KVA DG
Responsible to team assigned for the preventative & corrective maintenance, installation, commissioning, dismantling, and trouble shooting of the 33KV / 11KV / LT OH distribution lines.
Periodical checking of all motors and industrial utilities (Compressor, VAM )
Lead the team of expert O/H Lines Engineers and allocates duties to them.
Ensure proper routine inspection for all O/H Lines CKT’S as per code of practice in order to detect the week points and rectify before break down to improve the system reliability.
Coordination with electromechanical materials suppliers to provide the BMS provisions in their equipment
Panel board coordination with suppliers to provide the panels matching with the projects specifications final approved panel board schedules, control and monitoring BMS points and correction components
Installation supervision of the project BMS works for the Electromechanical equipment for the following
EMT conduits and Cable trucking for all project area
All lighting and Emergency Lighting Panels
All main Distribution Boards
Pumps controls through BMS and local control panels
Motor control panels assembly for diffetent types of AHU Chiller,Air Compressor,Ammonia Compressor,VAM and Motors with different power rating
Experience in monitoring and control from central control room( UPS,Water management system, Electrical Management system)
Supervision of installation and commissioning of the field instruments like Sensors, Transducers, Differential Pressure Switches, and Control Valves
Name of the organization : Regen PowerTech Pvt Ltd., Chennai
Position held : Senior Electrical Engineer -TQM
Period : December 2011 to December 2012
Site : Tamilnadu, Maharashtra, Rajasthan
JOB RESPONSIBILITIES:
Erection, and Site Supervision of 132/11 KV Substation and 132 KV Double Circuit Transmission Line (around 15 KM. ) and Feeder Line 4 no’ s from Substation (around 50 KM) over head line
Preparing the Project Plan(PP) and Daily progress report(DPR)
Inspection of incoming materials of Mechanical and Electrical Parts as per Site incoming inspection checklist and updating the Inspection Report
Responsible to Ensuring safety were strictly followed in site
Prepare QC Inspection reports and monthly accomplishment reports.
Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored
OFC cable Spicing to be done
Around 10kms OFC cable laying to be done
Name of the organization : Win wind Power Energy Pvt Ltd. Chennai
Position held : Senior Electrical Engineer - Projects
Period : January 2011 to November 2011
Site : Jath, Maharashtra
try predicting and then finding out how many mugs of water are required to fill a bucket or whether the glass of milk/water/drink that you see is full, half or empty
JOB RESPONSIBILITIES:
Planning,Scheduling, Installation, Testing and Commissioning, Operation and Maintenance of 33KV Switchyards.(i.e. Transformers – 1250 KVA, Circuit Breakers, CT,PT and Double pole Materials, cable laying)
33KV overhead Line work surveying, Erection of Poles and String of line work from Main Substation to Group substation feeders and one WTG to another WTG
Regularly Tools, Safety,Quality and Environmental Training given to workers
Involved in Quality Management (IQMS)
Involved in Safety Management, Stores Management and Tool Management
Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored
GCC Experiences
Project : 4.5 MW Power Stations at Al Mazyouna
Client : Rae co
Position held : Site Electrical Engineer
Period : August 2009 to December 2009
Supervision for erection,Testing and Commissioning of 4.5 MW Power Station at Al Mazyouna Erection of Generator, Transformer,11 KV Panel,HT Cable, Fire Fighting, Control & Protection Panels, Small Power Lighting, Battery system, Ear thing system, Cable laying, and Cable terminations
Name of the organization : Atlas International Engineering – Muscat, Oman
Position held : Electrical Engineer- Projects
Period : August 2009 to October 2010
Project : Wadi Saa 132/33KV Grid Substation,
Client : Oman Electricity Transmission Company SAOC
Position held : Site Resident Engineer - Electrical
Period : December 2009 to October 2010
JOB RESPONSIBILITIES:
Planning Scheduling, Erection, and Site Supervision of 132/33 KV Substation and
220 KV & 132 KV EHV Transmission Line.
Erection and supervision of overall Earth mat grid laying
Erection and supervision of 132 KV GIS and its accessories.
Erection and supervision of 63 MVA Power Transformer
Installation and supervision of 132 & 33KV indoor switchgear panels and control panels
Monitoring the contractor QA/QC activities and maintain the records
Installation supervision of the project BMS works for the Electromechanical equipment for the following
EMT conduits and Cable trucking for all project area
All lighting and Emergency Lighting Panels
All main Distribution Boards
Fire Fighting controls through BMS and local control panels
Motor control panels assembly for different types of AHU Chiller, and Motors with different power rating
Ensuring the responses are complete and in compliance with the contract documents. Where problems are found, work with Project Engineer to resolve.
Following SHE policies strictly
Preparing the Project Plan(PP) and Daily progress report(DPR)
Preparing the SLD, specification and layout drawings, and cable schedule.
Responsible for the review of vendor drawings and documents.
Preparing the method statement for installation activities for approval.
Monitoring and coordinating the installation activities.
Reporting the work progress to the Project Manager on a daily, weekly and monthly basis.
.
Name of the organization : ETA Power project Division, Dubai
Project : 132/11KV substation,
Client : Dubai properties
Authority : DEWA
Position held : Site Engineer - Electrical
Period : August 2008 to March 2009
JOB RESPONSIBILITIES:
Planning Scheduling, Erection, and Site Supervision of 132/11 KV Substation.
Erection and supervision of 132 KV GIS and its accessories.
Erection and supervision of 63 MVA Power Transformer
Erection and supervision of 132 & 11KV indoor switchgear panels. And other control panels(SCP,LVAC )
Installation of Cable trays routing
Laying and Termination of Power cables and Control cables
Project Licensing and NOC from the consign developer and government authority(DEWA&TECOM)
Creating the non conformity reports for Contractors non compliances
Reporting progress
Monitoring the changes during Construction and ensuring permission is received from the Supervisors in writing
Co-ordination with consultant for equipment, material inspection.
Preparation of erection procedure for all equipment.(Method Statement,FQP )
Responsible to Ensuring safety were strictly followed in site
Knowledge about HVAC (Heating Ventilation and Air Conditioning)System MEP (Mechanical Electrical Plumbing)and BMS(Building management system)
Preparing the Project Plan(PP) and Daily progress report(DPR)
Name of the organization : VESTAS WIND TECHNOLOGY (I) PVT. LTD.,
Position held : Site Engineer - Electrical
Period : July 2005 to June 2008
Project Sites : Chitradurga, Karnataka Gudepanchgani, Karad,
Anthiyur, Coimbatore, Tamilnadu
JOB RESPONSIBILITIES:
Planning,Scheduling, Erection, Testing and Commissioning, Operation and Maintenance of 33KV Double pole Switchyards.(i.e. Transformers – 2250 KVA and 950 KVA, Circuit Breakers, CT,PT and Double pole Materials)
Planning,Scheduling,Testing and laying of 33KV XLPE Underground Cable around 10km from Main Substation to Group substation and one WTG to another WTG
33kv Line work surveying, Erection of Poles and String of line work from Main Substation to Group substation feeders and one WTG to another WTG
Laying and Termination of LT cables (3.5x300Sqmm, 3x70sqmm) for Transformer to Main Panel, Main Panel to Generator and Control Cables.
Regularly Tools,Safety,Quality and Environmental Training given to Co-workers and Contractors
Involved in Quality Management (IQMS) and Six Sigma Format
Involved in Safety Management, Stores Management and Tool Management
Preparing the site WEG machine location for laying the OFC cable for SCADA from one Machine to other WEG machine and all the Machine are connected in the Control Monitoring Station from CMS all the WEG Machine are Monitored
OFC cable Spicing to be done
Around 50kms OFC cable laying to be done
TRAINING ATTENDENTED:
Balance of Plant(BOP)
Tools Handling and Maintenance
Blade Manufacture and Repair
Safety,Fire and Environmental Training
Name of the organization : Mazagon Dock Ltd., Mumbai.(Contract Basis)
Project : proto type ship building (submarine)
Client : PRP Site BARC, Kalpakkam.
Position held : Electrical Engineer
Period : March 2002 to July 2005
JOB RESPONSIBILITIES:
Erection of IS & NIS, LCP’s, Switch Boards,
HT Cable schedule preparation, Laying and Testing of (3.5x400sqmm, 3x95sqmm, 3x70sqmm, 1x240sqmm, Fiber Optical Cables & Control Cables.)
Fabrication of Cable boxes, Cable boxes Assembly and Designing the Cable Routes
Cable Boxes Compound Filling,
Testing of Earthing & Lightning equipment’s for the towers and High Rising Buildings
Safety and Quality carried out through the work
Name of the organization : Thirumoorthy Hi-tech Company Pvt. Ltd., Chennai
Client : Southern Railways & Ennore Thermal Power Plant,
Position held : Site Supervisor
Period : May 2001 to February 2002
JOB RESPONSIBILITIES:
Replacement of Existing power cable and Laying of New Power cables (Unit 5). The Project has done for the Unit 5 has increased its capacity to180Mw to 350Mw.
Replacement of Defective Power Cable between Chennai Basin Bridge to Gummidipundi (47000mts) Completed successfully with in time under the guidance Of Mr.Srinivasulu
STRENGTHS
Self-motivated and ready to tackle any challenge.
Proven track record of absorbing new and complex concepts easily and adapting to highly demanding situations.
Exceptionally strong communication and team work skills.
COMPUTER KNOWLEDGE
Knowledge in SAP Material Management &Primavera
Operating System: Ms-Dos, Windows NT/95.
LANGUAGE KNOWLEDGE
English, Tamil, Hindi
PASSPORT DETAILS
Passport No : L3052040
Date of Expire : 29-08-2023
Onsite Experience : 8 months in Dubai, UAE
15 months in Muscat, Oman
PERSONAL DETAILS
Father Name : V.K.Rajamani
Date of Birth : 22nd December 1977
Marital Status : Married
Nationality : Indian
Permanent Address : 19/94, Big Maniyakara street,
Chengalpattu, Tamilnadu.
India – 60300