VIKAS RAJ KARMAKAR VIKAS RAJ KARMAKAR
City : Harda, Dist : Harda (M.P.) Maheshwar Road Near 220KV Substation, Barwaha Pin : 461331 - India M.No. : +91-992*******, 798-***-**** M.P. Power Transmission Co. Ltd. Barwaha Dist : Khargone (M.P.) Pin : 451115 India
Career Objective :
I am Hardworking person and I try every time best to best performance in my work place. Academic Qualification :
1 10th Passed from M.P. Board April-2001
2 12th Maths Science Passed from M.P. Board July-2003 3 ITI Electrician Passed from NCVT July-2006
4 Diploma in Electrical Engineering from RGPV June-2018 Past Experience :
1
2
3
4
5
Current Working Experience :
1
a
b
c
d
d
e
f
g
Permanent Address : Current Address :
Address : Bagnoli Colony Near Kali Mandir Address : Office of Executive Engineer (Testing) 06 Month Working from Brush Transformer Gulf in Abu Dhabi (UAE) as a Transformer Technician from 16.03.2009 To 02.09.2009
As a working on Post of Transformer Technician at Crompton Greaves Ltd. Power Transformer T-3 Division Mandeep Bhopal (M.P.) from 05.09.2009 To 10.03.2011 on Tanking Section. 800KV 500 MVA Power Transformer manufacturing process training from Hungry in Europe in Month of Aug-2020 by Crompton Greaves Ltd.
Presently working on Madhya Pradesh Power Transmission Co. Ltd. Testing Division Barwaha (Undertaking of MP Government) (M.P.) from 01.04.2011 To Continue…..
My post is Testing Attendant but I am working as a Assistant Engineer (Office) of Testing Division MPPTCL Barwaha. Brief description of work carried out by me :
13 No. EHV Substation (02 No. 220KV & 11 No. 132KV) working under Testing Division Barwaha and 05 No. 220/132KV Transformer + 25 No. 132KV Transformer working at above Substation. All 220KV & 132KV Transformer Losses eg. MWH, MVAH & MVARH Data consumption taken out and checked every week, every month by me and information sent to higher office. All Transformer, Incoming Outage taken out every week, every month by me and sent to higher office. Daily All Transformers, 220, 132 & 33KV Line's Max. Min. Load data (eg. Amp. MW, MVAR, MVA, Voltage, Time) taken out and checked by me and sent to higher office. Load management plan for Substation done by me (eg. Additional, Augmentation of Transformer proposal, new feeder proposal, Cap. Bank Proposal etc.) sent to higher office. All 220, 132 & 33KV Lines various type Tripping information (eg. Faulty tripping, Differential, DPR, Over Current, Earth fault indication, Auto Recloser indication) providing higher office by me. Information of All Differential Relay, Distance Protection Relay, Under Frequency Relay,Capacitor Bank Status maintained by me and time to time when any replacement of these relays, the new addition data are updated by me and providing higher office.
All the 33KV Incoming AMR (Automatic Meter Reading) system data working properly by checked me daily (eg. Modem, Sim and Antenna) found any issues, the information providing higher office for rectification.
-: RESUME :-
01 Year CGL Training from Crompton Greaves Ltd. Power Transformer T-3 Division Mandeep Bhopal (M.P.) as a Technician Trainee from 08.11.2007 To 07.11.2008 on Taking Section. 01 Year Apprentice Training from Crompton Greaves Ltd. Power Transformer T-3 Division Mandeep Bhopal (M.P.) from 12.10.2006 To 11.10.2007 on Tanking Section.
All Capacitor Bank proper working at the time of high loading of feeders watch daily and any issue found after intimation of the Substation in charge for rectification. F:\VIKAS RAJ\New Job Data\Resume.xlsx 08.02.2021 Page-1 h
i
j
k
l
m
n
Other Experience :
1
2
3
4 Basic knowledge of Computer Hardware and software. Personal Profile :
1 Father's Name : Mr. Badal Karmakar
2 Mother's Name : Mrs. Pratima Karmakar
3 Date of Birth : 17/01/1985
4 Male
5 Marital Status : Married with 1 Kids
6 Languages Known : English, Hindi & Bangla
7 Nationality : Indian
8 Hobbies : Mobile Photography, Listening Music
9 Passport No. : H2510805
Declaration :
Date :
Place : Barwaha
VIKAS RAJ KARMAKAR
Sex:
All the Substation connected on SCADA connection working properly checked by me daily, found any issuse, the information providing higher office for rectification. I solemnly declare that all the above information is correct to the best of my knowledge and belief. Typing Hindi with mangal Font & English on Computer. M.P. Power Transmission Co. Ltd. Provide Departmental ERP Training, MS Office Word & Excel Powerpoint for various Office work and technical Work.
M.P. Power Transmission Co. Ltd. Provide Departmental Feild Training for Transmission line maintenance from 17.12.2013 To 24.12.2013.
New work (eg. Erection of All class New Transformer, Feeder bay, Breaker, Control Panel, Cables structures, nut bolt, clamp, conductor) related requirement given by me time to time and watching the progress of work and the information sent to higher office.
DGA and Oil Parameters sample taken out all transformer every 06 month and the results send to higher office. All official Technical Related information taken by me and provide higher office time to time. Presently various type Technical work done on ERP (SAP) system from 2018 in MPPTCL. All office related technical work execute by me on ERP(SAP) System (eg. Material Related Requirement through FLM, Store Related for various material collection and consumption in Substations, Shut Down massages, Tripping Informations of Line, Indent Approval, Various data of Substation related equipment like Breaker, CT, PT, Wave Trap, Contraol Panel, Transformer)
Written of Various type letters experience in English and Hindi Language for Departmentally and other company's. Best performing award found testing Division Barwaha in Financial Year 2019-20 in my working period. F:\VIKAS RAJ\New Job Data\Resume.xlsx 08.02.2021 Page-2