Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Kotteri, Tamil Nadu, India
Posted:
March 09, 2021

Contact this candidate

Resume:

ILAYARAJA N

Email:adkroy@r.postjobfree.com

Contact: +918*********

+919*********

PROFILE SUMMARY

A dynamic professional with 8 years of experience in:

~Supply Chain Management ~Material Coordination ~Inventory Control

~Team Management ~Reporting & Documentation ~Quality Management

~ & Accounting Activities

Currently associated with Infoplus technologies Pvt. Ltd., working for Cairn India Ltd., India as Material Controller.

Possess working knowledge Goods movements in SAP MM.

A good knowledge on the material specification used in Oil and Gas Construction. CORE COMPETENCIES

Planning, directing and maintaining efficient store operations; assigning & evaluating the work performance of personnel assigned to store and maintaining clean & safe environment

Coordinating for incoming & outgoing material activities to ensure accuracy, completeness and quality of material; handling goods movement in SAP & documents; formulating claim report of shortage of material required.

Managing the procurement of raw material, packing material, equipment & machinery including maintenance of minimum stock / inventory level.

ORGANIZATIONAL EXPERIENCE

Company: (Takreer Refinery, Abudhabi) Through Gulf industrial security company . Position: Fire and gas technician.

Period :Feb 2019 TO Nov 2019.

Company: (Dolphin energy,Qatar) Through consolidated gulf company. Position:Fire and gas technician.

Period : May 2016 TO Aug 2018

Company: (Cairn India ltd, Rajasthan, Mangala Well pad Oil and Gas Project) Through Infoplus Technologies Pvt ltd.

Position: SAP ENGINEER .

Period : Jan 2016 TO May 2016

Company: (Cairn India ltd, Rajasthan, Mangala Well pad Oil and Gas Project) Through Brunel India ltd. Position: SAP ENGINEER.

Period : Sep 2015 TO Dec 2015.

Company: (Reliance India ltd, Jamnagar, BRU (Benzene Recovery Unit) Through EDAC Automation ltd. Position: Instrument Engineer

Period : Jun 2015 TO Aug 2015.

Company: (BHEL, AMRAVATHI, 5x270 MW POWER PLANT) Through EDAC Automation ltd. Position: Instrument Engineer

Period : Jan 2015 TO May 2015.

Company: CIL (Cairn India Ltd, Rajasthan, AISHWARYA Well pad Oil and Gas Project) Through ZETI Engineering services.

Position: SAP ENGINEER.

Period : Jan 2014 TO Dec 2014

Company: CIL (Cairn India Ltd, Rajasthan, Mangala Well pad Oil and Gas) Through AARVI ENCON PVTLTD. Position: Instrument Engineer

Period : Jan 2013 TO Dec 2013

Company: CIL (Cairn India Ltd, Rajasthan, AISHWARYA Well pad Oil and Gas Project) Through ZETI Engineering Services.

Position: SAP ENGINEER.

Period : Apr 2011 TO Dec 2012

Key Result Areas:

Daily audit on bin discipline and ensuring the availability of average empty bins for future consignments.

Monitoring the advance shipment and organising storage of the project materials.

Planning and allocating of MHE and manpower for loading, offloading and shifting operations.

Coordinating with QC team for material quality clearance and responsible for reverse logistics for rejected material.

Ensuring the tagging/labeling and put-away of the inbound materials.

Responsible for signing off of daily inbound transaction report.

Inventory control, generating reports of inventory consumed, and balance quantity in warehouse, material handling, reconciliation and maintaining the stock records.

Responsible for all material sheets to be documented and made available for audit under SAP

Invoice clarification against GRN in Document flow manager DFM tool.

Ensuring the Updates of issue and return of material in live basis in SAP.

Attesting the verified reconciliation report for contractors and consuming the inventory in SAP with signed consumption report.

Preparation of cyclic inventory calendar and organizing the cyclic inventory stock count and responsible for Write Off.

Updating weekly inventory report sent to the project heads & department heads

Quarantine the project surplus, dead and slow moving stock and circulating the report on to engineering and procurement team to deplete surplus.

Responsible for segregating and disposing of Scrap

Responsible for the Zero tolerance Safety Operation and maintain the safety norm of the organization.

Responsible for organize the periodic third party certification on lifting tools and tackles for work safety.

Installation Activities Supervision of Installation of Cable Trays and Impulse Tubing, Cable laying, Glanding and Termination, Installation of Junction Boxes, Marshaling Panel, Control Panel & Consoles. Safety Training course.

Loop Checking and Commissioning of all Process Instrument.

Performed Loop Checking, Commissioning of separator tank, dehydrator, boiler, degassing boot tank, oil storage tank,fuel gas system – through Field Auxiliary Room and Central Control Room.

Hydro test activities in various instruments.

Sov control valve, mov calibration.

Carried out in site Calibration and Testing of various type Package Vendor Instrument.

Performed Loop Checking, Commissioning of Fire & Gas Detection System.

Performed Calibration of Process Instrument (Level, Pressure, Flow, Temperature) Switches and other Pressure Indicator using test Equipment such as Hart Communicator

Involved in the Trouble Shooting for various Instrument from field to Control Room

Testing of Different type of Temperature Measuring Element.

Checking & clarify the all instruments is installing in process line as per P&ID.

Checking the cables, terminations, tags, earth, instruments fittings, lighting earth pit, etc., as per the procedure.

Checking & clarify the smoke detector, gas detector, alarm point, etc.

Performed Loop Checking the Transmitter using the Hart Communicator.

Involved in the charging of panels, loop-checking and commissioning of panels.

Maintenance of various field instruments such as Electronic Transmitters, RTD’s, Pressure gauges, Temperature gauges, Orifice plates, Safety valves, Rota meters, etc.,

Hands-on experience on HART COMMUNICATOR (Fisher Rosemount-275 & 375& )

Preparation of standard documentation such as instrument specification sheets, instrument process data sheets, junction box detailing and Cable Schedule and Interconnection Diagrams. EDUCATION

BE-ECE:

Apr 2011 BE [Electronics and Communication Engineering] from Anna University (Arasu Engineering College, Kumbakonam) during Aug 2007 to Apr 2011 with 63 %( first class). H S C:

N. Kittappa Government Higher Secondary School, Mayiladuthurai, during Jun 2005 to Apr 2011 with 66 %( first class).

S S L C:

MMRA Government High School, Mayiladuthurai, in the year of 2005. With 77 %( first class). PERSONAL DATA

Name : Ilayaraja

Fathers Name : Natarajan

Date of Birth : 06/06/1990

Sex : Male

Languages Known : Tamil, English, and Hindi

Nationality : Indian

Contact No : +919*********

Marital Status : Single

Passport NO : J7285728

Valid Until : 14.02.2022

I hereby declare that the above furnished details are true to my knowledge and belief. I pledge you that I will serve for your concern with honest and sincere, if I would give a better chance. Place: Mayiladuthurai yours truly

ILAYARAJA N



Contact this candidate