Post Job Free

Resume

Sign in

Engineer Project

Location:
Chennai, Tamil Nadu, India
Posted:
March 03, 2021

Contact this candidate

Resume:

RESUME

R. RAMASAMY

CONTACT: ****-934-***-****, 811*******

E-MAIL: adkmhl@r.postjobfree.com, adkmhl@r.postjobfree.com

Project Engineer with 20 years’ experience in the field of construction and supervision of water and waste water pipelines. Experienced in the delivery of various water, wastewater and Effluent treatment plants and Ground reservoir.

EDUCATIONAL QUALIFICATION

B. Tech ( civil )

Diploma civil engineering

Years of Experience: 19 Years

( Water & Sewage pipeline with Elevated tank and Ground reservoir and STP )

Employment:

GCC Region

Arcadis Consulting Middle East,

Oman Branch ;

Senior Site Inspector

Aug 2012 to Dec 2019

Employment:

India Region

East coast constructions & Industries ltd, India

Site Engineer,

2005 - 2006.

Mott MacDonald company llc,

Sultanate of Oman;

Site Inspector,

April 2011 – AUG 2012.

Nagarjuna construction company ltd, India

Asst. Engineer,

April 2001-- 2005

Galfar Engineering & contracting S.A.O.G, sultanate of oman,

Project Engineer

July 2008 -- Feb 2011

PERSONAL PROFILE:

Father’s Name : R.Rajendran

Date of Birth : 15.07.1981

Nationality : Indian, Marrige Status : Yes

Gulf driving license : Light

Nagarjuna construction company & international llc-- Oman

Pipe line Engineer,

May2006– June 2008

Key Skills:

Monitoring and verification of trench cutting,bedding, Pipe

Laying,( HDPE,DI, UPVC, MS and RCC PIPE) pipe

Surrounding and back filling. Relocation of existing

ground services, Tests and Pipe jointing and construction of

water reservoir and sewage chamber, necessary wadi crossing

Concrete and gabions work etc.

Inspect as per the QA/QC procedure and maintain the documents. To check the concrete cube and soil test and MAS approval as per the technical specification, and maintain the report documents, NCR reports, site instruction reports and minutes of meeting writing etc.

To maintain the Health and Safety awareness and safety way to work at site with all PPE. Implement the Tools Box talks at site every day. To maintain the spot card and control the site accident with various site activities like deep trench cutting and road crossing etc.

Detailed Experience

Arcadis Consulting Middle East Limited Oman Branch

Position: Site Inspector.

Period: Mar2016 to Dec 2019

Projects: Bawsher to Seeb Water transmission pipeline,

Contractor: Larsen & Toubro (Oman) LLC.

Project Description: The PAEW wishes to execute the whole scope of work described below in three Phases, with early completion of the section from Bawsher to Ghala as Phase 1, and Ghala to Airport reservoir connection as Phase 2. In both cases the Phases include construction of the relevant reservoir connections and isolating valves so that PAEW may take over and operate the completed sections

The Bawsher to Seeb Water Transmission System comprises the following principal components:

Laying of DN 1600 Carbon Steel pipes of approximate length 29,200 m.

7Nr cross connections of varying sizes to all the off-take pipelines from existing DN 1000 transmission main leading to following compounds including connecting pipes (either Carbon Steel or DI, as detailed in the drawings and BOQ) and valves including motor operated valves.

Project responsibility: Responsible for supervision of 1600mm dia CS pipe laying to buried the ground level including with Bedding and surrounding and backfilling.

As well as responsible for the route alignment, Shop drawing checking MAS review and weekly plan checking.

Find out the welding Quality through Radiographic and ultrasonic test welding of joints, Internal coating and External coating.

Hydro test for welded and throw out full length of pipe as per the project specification.

Flushing and disinfection for the pipeline as per project specification.

Monitoring the Trenchless road crossing and wadi crossing and construction of flow meter chambers, valve chambers, compound pipe works.

Position: Site Inspector

Period: July2014 to 2016

Projects: Expansion of water Distribution for willayat Sur

Contractor: TARGET LLC

Project Description:

The works to be constructed include the supply and installation of water distribution system using HDPE and DI pipes and all associated pipes and fittings, chambers, valves, anchor blocks etc.

water transmission pipelines, distribution networks, main overhead line power supply, instrumentation and SCADA.

Project responsibility :

Responsible for supervision of ground reservoir and Elevated Tank and associated ductile iron (DI) transmission and high density polyethylene (HDPE) distribution pipelines.

as well as compound works including earthworks, construction of Guard House, compound wall, flow meter chambers, valve chambers, compound pipe work and access road. Wadi concrete protection and gabions works, Fire hydrant,

Pressure test for distribution and transmission pipeline, Leak test for Elevated tank and Ground Reservoir, Flushing and Disinfection for the distribution and Transmission pipelines and Elevated tank and Ground reservoir.

Position: Site Inspector

Period: Sep2012 to 2014

Projects: Construction of water Distribution Networks in Sinaw,

Contractor: SMC Infra llc.

Project Description:

The Project objective is supply and installation of HDPE

Water distribution networks in Areas feed by Elevated tanks at sinaw ground reservoir.

Project responsibility :

Responsible for supervision of construction of Ground reservoir and associated ductile iron (DI) transmission and high density polyethylene (HDPE) distribution pipelines, Concrete protection for future road, wadi encasing concrete, gabboins work, Thrust block work as well as compound works including earthworks, construction of Guard House, compound wall, flow meter chambers, valve chambers, compound pipe work and access road.

Mott Macdonald company llc, Sultanate of Oman.

Position: Site Inspector

Period : April 2011 – Aug 2012

Projects: Water Supply Scheme to Al Massarat

Contractor: Al Matar Trading & Contracting Company

Project Description:

The Project objective is to provide potable water distribution system to 4 areas and will be executed in parallel. The works to be constructed include the supply and installation of water distribution system predominantly using HDPE pipes and all associated pipes and fittings, chambers, valves, anchor blocks etc.

The scheme comprises principal components of ground reservoir tanks, compound works; water transmission pipelines/pumping main, distribution networks,, main overhead line power supply, control, instrumentation and SCADA.

Project responsibility :

Responsible for supervision of construction of 500m3 ground RCC(reinforced cement concrete) reservoir and associated ductile iron (DI) transmission and high density polyethylene (HDPE) distribution pipelines as well as compound works including earthworks, construction of Guard House, compound wall, flow meter chambers, valve chambers, compound pipe work and access road.

GALFAR ENGINEERING & CONTRACTING S.A.O.G, Sultanate of Oman.

Position: Project Engineer,

Date: JULY 2008 –FEB 2011

Projects: A’Seeb Wastewater Project, Muscat (Haya Water )

Project Description:

The project involves construction of vacuum stations with all elements of the compound including building and electromechanical equipment, vacuum sewers to convey the wastewater flow from the properties to the vacuum stations, house connections to vacuum collection chambers outside the property boundary through rider sewers, emptying, disinfecting, demolishing and backfilling septic tanks, 110mm conduits for fiber optic cabling along the routes of sewers and Treated effluent pipelines (250mm-700mm diameter).

Project responsibility :

In charge of the rising main and gravity main sewerage network. Fix the alignment for rising main sewer pipe line works for rider sewer network,house connection chamber, Connect the network from house connection to vacuum sewer pipes Make encasing concrete and wadi protection for major wadi area Provide thrust block at necessary place Provide a gabbions at necessary places, Pressure test the rising main by water. Co-ordinate with consultant and supervisors.

NAGARJUNA CONSTRUCTION COMPANY & INTERNATIONAL LLC,

Sultanate of Oman.

Position: Pipe line Engineer, Date: 2006 – 2008

Project: Sohar Water Net work project (Phase-1)

Project Description: The project consists of water network system for the Sohar. The work include Excavation, Pipe laying, concrete work, Thrust boring and Hydro Testing of various pipes like 250mm,180mm,& 125mm HDPE Pipes& Air valve chambers, washout chamber.

Responsibilities

In charge of the distribution water line,Fix the alignment for as per approved shop drawing,HDPE pipe and DIpipe laying works Prepare the site reports Butt welding for solid wall pipes and,Hand extraction welding for weholite pipes.

To follow up the public,consultant and client requirements. Fixing the gate valve and fire hydrant with chamber as per approved drawing,Execution of chamber activities and Pipe hydrotest and flushing and disinfection works.

EAST COAST CONSTRUCTION & INDUSTRIES LTD, Bangalore – India.

Position: Engineer,

From 2005 – 2006

Project: Drinking Water Supply (Greater Bangalore Board, India )

Responsibilities :

Using DI pipes from100mm to 800mm diameter in transmission and distribution lines. Alignment fixing and laying and jointing DI pipes with rubber gasketsFixing air valves and scour valves Hydro testing House service connection Construction of thrust blocks and anchor blocks Co-ordination with consultant and client,Pump station pipe work and associated electromechanical work. Assist to

Client bill preparation and subcontractor bill preparation.

NAGARJUNA CONSTRUCTION COMPANY LTD, Chennai- India.

Position: Asst. Engineer

Date: 2001–2005

Project: Chennai Metro water supply and sewerage board,

250 MLD Water treatment plant Chennai, Tamil Nadu.

Project Description:

The project involved building the plant itself, based on proprietary filtration and clarification technology, the installation of a SCADA control system and the construction of more than 50km of water supply (MS pipeline ) to link the new facility to city’s existing supply network.

Responsibilities :

Responsible for supervision of 1500mm dia MS pipe laying above the ground level through the RCC pedestal with bearing and wearing plates.As well as responsible for the route alignment, welding of joints, inside cement lining and outer coating of bitumen paints with warping coating. compound works including earthworks, construction of Guard House, compound wall, flow meter chambers, valve chambers, anchor block and thrust block. To find out the mistake from pipe making and welding of pipes at Manufacturing yard.

Find out the welding test through Radiographic test, Pressure test, flushing and disinfection to raw water pipeline and Treated water main line,

NAGARJUNA CONSTRUCTION COMPANY LTD, Gujarat- India.

Position: Asst. Engineer

Date: 2004–2005

Project : Irrigation Project – Narmada River development - Gujarat

Project Description:

The Narmada River Development - Gujarat Water Delivery and Drainage Project is part of an inter-state program for the development of multi-purpose hydropower and irrigation dams on the Narmada River and their associated irrigation canal networks. The program has been designed to: (a) further the progress of India's long-term power plan; (b) bring potentially valuable agricultural land in Gujarat and Rajasthan under irrigation; and (c) supply domestic, municipal and industrial water for Gujarat. The project including including a storage reservoir extending about 75 kms upstream of the dam in Gujarat.

Responsibilities :

Responsible for supervision of 2000mm dia MS pipe laying below the ground level with proper bedding materials .As well as responsible for the route alignment, welding of joints, outer coating of bitumen paints with warping coating. compound works including earthworks, construction of Guard House, compound wall, flow meter chambers, valve chambers, anchor block and thrust block.Pressure test and flusing.To find out the welding test through Radiographic test. To find out the mistake from pipe making and welding of pipes at Manufacturing yard.

R.RAMASAMY



Contact this candidate