NHLAMULO NDLOVU
Civil Engineer
B.Sc (Eng) Civil ; University of Cape Town 2015
NAME
Nhlamulo Ndlovu
ADDRESS
***** ********** ******, *******
Strand, 7140
CELLPHONE No
*******.********@*****.***
DATE OF BIRTH
30 April 1991
LANGUAGES
English
POSITION HELD
Junior Engineer
PROFESSIONAL EXPERIENCE SUMMARY
Feb 2015 to July 2018 (at HHO Africa)
YEARS OF PROFESSIONAL EXPERIENCE
3 years and 7 months
SPECIALIST EXPERTISE / INVOLVEMENT
Road Design / Stormwater Management / Quantity Estimation / Report Writing / Urban Drainage Design / Oral Presentation / Hydrological Assessment / Intersection Design / Design of overhead and mounted road signs / Road Markings / Traffic Accommodation
MEMBER OF PROFESSIONAL INSTITUTIONS
South African Institute of Civil Engineers (SAICE) - Membership No. 201600494
Engineering Council of South Africa (ECSA)
- Membership No. 201750295
Year
2018
Project & Description
Dualling of Sandown Road and M12 (Malibongwe Boulevard)
The Preliminary and detailed design of the Sandown Road and M12 includes the upgrade of the existing single carriageway into a dual carriageway, and the widening of existing box culverts. . As a member of the design team, I was responsible for the preliminary and detailed design road surface drainage, subsoil drainage system, hydrological assessment of the delineated drainage catchment, traffic accommodation, and completing a bill of quantities.
Contract Value: R50 million
2018
2017/2018
2016/2017
2016/2017
2016
Sable Road Interchange Upgrade: N1/N7 Central interchange Planning (N1 Collector Distributor)
The conceptual and preliminary design of the N1 collector distributor road adjacent the N1 from the N1/N7 interchange to Sable Road includes the introduction of a new interchange (i.e. Central Interchange) and the realignment of Sable Road. As a member of the design team, I was responsible for estimating the project cost for the road earthworks, services clashes and relocations, proposed pavement structure, and mass hauled to nearby landfill site
Upgrade of the National Route 3 Section 2 from Hammersdale km 8.1 to Cato Ridge km 19.4.
The Preliminary and detailed design of the national route N3 includes the rehabilitation of the existing concrete pavement, correction of sub-standard geometry, the addition of the 4th and 5th lanes and climbing lanes, replacement of existing bridges and culvert extensions. As a member of the design team, I was responsible for the preliminary and detailed design road surface drainage, hydrological analysis of the delineated drainage catchment, assessing the hydraulic capacity of the existing box culverts and river bridges, traffic accommodation, complete bill of quantities, and the design road signs and markings.
Contract Value: Provisional R1.2 billion
Upgrading of National Route 1 Section 18
from Heuningspruit km 0.00 to Koppies km 29
The Preliminary and detailed design of the National route N1 includes the upgrade of the existing 3-lane single carriageway to a 4-lane dual carriageway with provision for a 6-lane dual carriageway in the future, and the widening of Mahem River bridge and existing box culverts. As a member of the design team, I was responsible for the preliminary and detailed geometric design, interchange ramp re-alignment, hydrological analysis of the delineated drainage catchment, road surface drainage, checking the hydraulic capacity of the existing box culverts and river bridges, traffic accommodation, detailed design report, road signs and marking layout design, and estimating the cost of the project design alternatives.
Contract Value: Provisional R1.2 billion
Upgrade of Provincial Route 34 Section 6 between Kroonstad km 0.0 and Welkom km 48.0
The Preliminary and detailed design of the provincial route R34 includes correction of the vertical alignment, widening of shoulders and provision of turning lanes at intersections, assessment of the capacity of drainage structures, and widening drainage structures, the installation of a rope barrier, and the consolidation of the accesses of this road. As a member of the design team, I was responsible for the preliminary and detailed design hydrological analysis of the delineated drainage catchment, road surface drainage, checking the hydraulic capacity of the existing box culverts and river bridges, traffic accommodation, road signs and marking layout design, and estimating the cost of the project design alternatives.
Contract Value: Provisional R850 million
Upgrade of Section 10 of the national route N11 from km 3.4 Middelburg to Loskop Dam km53.4.
The Preliminary and detailed design of the national route N11 includes the rehabilitation of Section 10 of the N11 national route trunk road, widening of existing road, the addition of overtaking lanes, and upgrading box culverts and existing bridges. As a member of the design team, I was responsible for the detailed design intersection setting-out, the road signs and markings layout, and draughting of detailed design drawings.
Contract Value: Provisional R400 million
2016
Lefikeng via Tsoapo-le-bolila to Kofi Annan
Includes detailed designs and construction supervision for the upgrading of the road link between Lefikeng via Tsoapo-Le-Bolila to Kofi Anna Road (Maseru Bypass Road).
Design of the Lefikeng junction layout and drainage design.
Pita Road: Road alignment and hydrology of route and drainage design, design of box culvert for river crossing, detailed design report
Road alignment and drainage design of route from the Constitution Road & Palace Road Junction up to Tona-Kholo Road next to the Palace Site in Lesotho.
Contract Value: R90 million
2016
Far South Study
Conceptual Design of Ou Kaapse Weg widening
-Connects traffic from Steenberg Road & Steenberg BLVD & Ou Kaapse Weg junction to NoordHoek Main Road & Ou Kaapse Weg Junction.
-Addition of two lanes to the existing Ou Kaapse Weg Carriageway
-Involves the widening of the carriageway to the LHS in most cases to avoid cutting into existing rock formations / Outcrops.
-Conceptual Drawings
-BOQ
Conceptual Design of Fish Hoek Northern Bypass:
-The New alignment of the Fish Hoek Northern Bypass route based of previous design proposals.
-Connecting Traffic from the Existing Kommetjie Main Road & Corsair Way Junction to the Boyes Drive & Godfrey Road & Clairvaux Road Junction.
-Entails the alignment of a new route traversing on a Via-Duct bridge structure that leads into a new Tunnel cutting through Trappies Kop before it ties-into Boyes Drive.
-Conceptual Drawings
-BOQ
2015/2016
Conceptual Design / Regrading of Clairvaux Road:
-Realignment and Regrading of Clairvaux Road to create and underpass going under Godfrey Road and the New Fish Hoek Northern Bypass.
-Calculate the amount of retaining wall area required to support the existing ground.
Rehabilitation of the MR287 municipal route from Robertson (kogmanskloof rivier) to Bonnievale (Swellendam road)
The Preliminary and detailed design of the MR287 route includes the rehabilitation of the existing road pavement, widening of the Kogmanskloof river bridge, extending box culverts and rehabilitating Transnet railway crossing. As a member of the design team, I was responsible for the preliminary and detailed design road surface drainage, stormwater drainage network for the peri-urban and urban section of road, hydrological analysis of the delineated drainage catchment, complete bill of quantities, and assessing the hydraulic capacity of the existing box culverts and river bridges.
Contract Value: Provisional R250 million
2015
N2 (Tongaat to Ballito) Road Upgrade
The Preliminary and detailed design of the National route N2 includes the addition of two concrete lanes on each carriageway of the existing dual carriageway. The upgrades include the construction of cut and fill retaining walls, widening of Tongaat River Bridge and lengthening of 9 culverts. As a member of the design team, I was responsible for the preliminary geometric design, hydrological analysis of delineated drainage catchment, road surface drainage, assessing the hydraulic capacity of existing drainage structures, detailed design report, and placement of retaining walls, complete bill of quantities and project costing of design alternatives.
Contract Value: R800 million
2014
2014
Upgrading of Trunk Road 2 Section 1 Including New Borcherds Quarry Interchange
The widening of Trunk Road 2 Section 1 and the construction of the new Borcherds Quarry Interchange including New Eisleben Road and Klipfontein Road. As member of design team, I was responsible for stormwater design and preliminary geometric design of on- and off-ramps at new Borcherds Quarry Interchange
Contract Value: R700 million
Houmoed Avenue
The upgrading of Kommetjie Road and the extension of Houmoed Avenue includes sidewalks, street lighting, cycle lanes, bus stops, traffic calming and silt and litter trap facilities. Member of design team responsible for design of stormwater system and litter trap.
Contract Value: R20 million
RECENT IN-CAREER TRAINING COURSES
2016 Civil Designer Training - Knowledgebase
2017 Practical Geometric Design Course - SAICE
2017
Bentley / Microstation Select Training Course
EDUCATION HISTORY:
Giyani High School, National Senior Certificate (2005 - 2009)
University of Cape Town, B.Sc In Civil Engineering (2010 - 2015)
Core courses: Structural Steel Design, Structural Timber Design, Reinforced Concrete Design, Structural Analysis, Transport Planning, Urban Water Services, Water and Waste Water Treatment, Urban Planning, Fluid Mechanics & Hydraulics, Engineering Maths, Physics, Geotechnical Engineering, Hydraulics, Surveying.
REFERENCES:
Pierre van Zyl, Professional Civil Engineer - Director Roads Division at HHO
Email: ******@***.**.** Tel: +27-021-***-****
Graeme Warrin, Professional Civil Technologist - Director Roads Division at HHO
Email: ******@***.**.** Tel: +27-021-***-****
Siraaj Hendrickse, Junior Civil Engineer - Roads Division at HHO
Email: ******@***.**.** Tel: +27-021-***-**** / cell: +27-081-***-****
Rirhandzu Mhlongo, Professional Civil Technologist - Structural Engineer formerly with HHO
Email: **********@*****.*** Cell: +27-084-***-****
Bhekimuzi Dlamini, Professional Civil Engineer - Transportation Division at HHO
Email: *********@***.**.** Tel: +27-021-***-**** / Cell: +27-082-***-****
CIVIL ENGINEERING PROFESSIONAL EXPERIENCE