Name: Ahmed Al-Bakri
Mobile: 00-968-********/****9273
Email: *****************@*****.***
EDUCATION:
**** - *.** ********** *********** University Of Technology Baghdad - Iraq
Electrical Design
Construction / Commissioning
Project Management
QA/QC
Site Management
Load Calculation
Requirements analysis
Process improvement
Design skills
QA/QC
Manufacturing methods and procedures
Safety management
Single line diagram for power DB
HVAC installation
Earthing system
MTOs (Materials Take Offs) preparing
Lighting system
Material requisition preparing
Small power layout
TBE preparing
Power and instrument cable laying
EPF construction
Fire alarm detector & cable routing layout
Power diesel generator cluster construction
Since 2006, I had a various challenges to overcome and make my achievement along with my working team.
Many times, I had tasted the satisfaction feeling when I am on target even though hard times we have been through.
At the current time, I can implement my accumulated experience and skill to achieve new targets with more efficient and high tech procedure.
For this position, I believe that I can offer your team my best level of technical experience as to reach with you to the optimum success. All of that because I can offer you the following:
Review of Technical MTO & with respect to approved system drawings.
Review of SLDs, Client Specifications, standards & Contract Documents.
Preparation / Review of Construction Method statements for Electrical systems installation.
Review of Vendor erection procedures and shall ensure the full compliance of OEM recommendations.
Review of SLD’s, Cable Tray Routing Layouts etc
Preparation of Material Requests in SAP & ACCPAC.
Review of Vendor offers, catalogues, Wiring Diagrams, Schematic Diagrams, inter-connection Diagrams, Data sheets, Cross Section Drawings, GA Drawings & Performance Curves.
Co-ordination activities with other departments like Civil / Structural, Mechanical.
Shall estimate the required recourses and shall plan the construction works.
Preparation of Electrical construction sequences based on the work front available.
Electrical Power system Study and shall lead the testing and Pre-com works
Co-ordination with engineering team for site installation activities.
Input to Engineering team for preparation of As-Built Documents as per the Red mark-up documents from site.
Manage smooth commissioning of the project by Coordinating between the company and the Contractor.
Supervise and approve commissioning plans in accordance with project guidelines.
Review designs and supervise onsite commissioning activities.
Prepare and maintain commission records of site observations, testing processes and checklists .
Outline procedures, norms and details for writing the Systems Manual.
Monitor installation, submittals and usage of engineering tools adhering to project and commissioning guidelines.
Guide testing processes and motivate specialists to achieve standard results.
Assist with identification and redressal of commissioning and malfunction issues.
Track and review progress through meetings.
Evaluate contractual commissioning statistics and instruction guidelines in accordance with the needs of the project.
Compile commission report data for summarizing.
Assist in summarizing and updating commission records.
Schedule and supervise operational reviews in association with functional staff.
Create an empowering and inspiring work culture with the commissioning team.
Attain customer satisfaction through adhering to owner guidelines with the entire project team.
Operate, maintain and control the electrical network and equipment reliably and with integrity to agreed targets with cost optimization.
Review all the electrical discipline procedures within an ISO certified quality assurance system.
Initiate, develop and deliver plant reliability and integrity improvements to the electrical network and equipment via management of process change.
Implement appropriate maintenance techniques to establish the required preventive maintenance (PM) for all electrical equipment to ensure non-overdue status at the OLNG; raise and get consensus approval when overdue happens.
Ensure sufficient and suitable resources in terms of labor, material and equipment are available to efficiently carry out all electrical work in accordance with appropriate standards and procedures.
Lead in trouble shooting, through proper techniques like RCA and tripod if needed, all electrical related process incidents that can affect complex reliability and availability.
Develop and obtain approval for all modifications needed to overcome electrical design issues.
Implement electrical equipment long term review that is documented and updated in Asset Reference Plan (ARP) and implement ARP action items (stock proposals, upgrade proposals, etc.).
Implement regular electrical spare parts reviews and follow up of action items that ensure availability of required spares to maintain complex electrical equipment.
Manage all interfaces between electrical and other disciplines within OLNG and 3rd parties.
Manage budget and contracts for the electrical discipline.
Plan and carry out electrical audits and provide input to the relevant HSSE audits.
Contribute to site safety as an Authorized Engineer and participate in the duty engineering system for out of hours support.
Review designs the cables size /DB specification and cable laying/DB installation activities (supervision).
WORK HISTORY:
E&I Sr. Engineer, CCED, Muscat, Oman, (Jan 2014 - Present),
Handle various E&I engineering duties in Oil and Gas fields. Starting of project preparation, design, calculation, materials list, execution and site construction management.
Subcontractor’s managements and procurement activities.
Instruments devices installation, test, commissioning and start up activities.
Operation / Maintenance technical support.
Block valve station solar system installation and commissioning.
FGS and FAS installation and commissioning.
Heater treater installation and commissioning.
Separator installation and commissioning.
DCS and ESD panels installation, connections, configuration, graphic and commissioning.
FOC laying, connection and commissioning.
MCC installation, cables connection and commissioning.
Gas power station installation and commissioning.
Pump motor starter installation, cables connection and commissioning.
Earthing system design, installation and commissioning.
Lighting and emergency lighting system design, installation and commissioning.
E&I Sr. Engineer, PRECISION ENGINEERING LLC, Oman, (Jul 2010 – Jun 2014),
Responsibilities included initiating Design Team, Liaison with Clients.
Co-ordination with Client, Vendor and Contractor. Coordination with various departments like Process, Piping, Instrumentation, Civil, Electrical etc.
Review the project progress by highlighting the critical path and the critical activities to be performed by engineering departments time to time for timely completion of the project.
Monitoring of Schedule delays and suggesting the recovery plan to maintain the schedule completion date.
Developing and implementing Management reporting systems and processes.
Preparation of Daily, Weekly and Monthly Progress Reports reflecting the Project Progress and analyzing the productivity of Resources
E&I Sr. Project Engineer, ARDH BUSHER GLOBAL, Oman, (Jul 2009 – Jun 2010),
Completes engineering duties by organizing and controlling project elements.
Develops project objectives by reviewing project proposals and plans and conferring with management.
Determines project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, and reviewing bids from contractors.
Determines project specifications by studying product design, customer requirements, and performance standards.
Completes technical studies and prepares cost estimates.
Confirms product performance by designing and conducting tests.
Electrical works implementation (cables laying, transformer and power DB installation for Muscat, Mazoon, Majan Electricity Company.
Street light system installation.
E&I Engineer, ASLAC GROUP ELECT CONTRACTING, Syria, (Jul 2007 – Jun 2009),
Completes engineering duties by organizing and controlling project elements.
Develops project objectives by reviewing project proposals and plans and conferring with management.
Perform all the site electrical, instrumentation and control activities.