PERSONAL DATA:
Date of Birth : January **, ****
Place of Birth : Talisay, Gingoog City, Philippines
Sex : Male
Civil Status : Married
Religion : Roman Catholic
Citizenship : Filipino
Height : 5’7”
Weight : 70 kg
Father’s Name : Alex T. Delima
Occupation : Millwright (deceased)
Mother’s Name : Carmelita R. Delima
Occupation : Housewife
Parents Address : Zone 2 Bayabas Extension, Cagayan de
Oro City, Philippines
Contact no. : 093********
EDUCATIONAL BACKGROUND:
College : Xavier University – Ateneo de Cagayan
Corrales Avenue, Cagayan de Oro City
Bachelor of Science in Mechanical Engineering
2002-2008
Graduated (Licensed)
Secondary : Kong Hua School
Kauswagan, Cagayan de Oro City
1998-2002
Graduated
Primary : Kauswagan Central School
Kauswagan, Cagayan de Oro City
1992-1998
Graduated
WORK/TRAINING EXPERIENCE:
I.Project Management (Construction Engineering)
1.Projects: Various Projects (January 22, 2016- December 07, 2020), Northern Mindanao, Philippines
Company: FED Construction Company Inc.
Position: Project in Charge(Mechanical/Piping/Structural/Civil)
Reporting to: Operation Manager
Unit: Field Operation Group
Job Summary:
Oversees the Planning, Estimates, Management, Coordination and Financial Control of the Project. Accomplished Project objectives by Planning and evaluating project activities. Ensure
Project is completed on time and within the budget.
2.Projects: Northern Mindanao Import Facilities (July 7, 2014- November 30, 2015), CDO, Philippines
Company: Japan Gas Corporation
Position: Piping Supervisor
Reporting to: Construction Manager (Piping/Mechanical)
Unit: Field Operation Group
Job Summary:
Control, and are directly responsible for the progress of the construction work and Quality controlling for the assigned work categories, coordinate and control the activities of the various categories working. Understands construction schedule, sequence of work & interface with other works. Coordinate and control between all the categories of work related to their scope of works and report to the Construction Manager.
Responsibilities:
Piping spool fabrication
Piping & supports field installation
Piping test & inspections
Assist in Mechanical Equipment Installation
3.Projects: Felcris Mixed Used Development Project (Feb. 1, 2014- July 5, 2014), Davao City, Philippines
Company: Rider Levett Bucknall Phils.
Position: Site Mechanical Engineer
Reporting to: Construction Manager (Mechanical)
Unit: Field Operation Group
Responsibilities:
Project plan implementation.
Inspection of construction works.
Monitoring of project accomplishment in accordance with set schedule.
Coordination with different parties involved in the project.
Evaluation of billings submitted by the contractors and/or suppliers.
Attendants to regular meetings.
Other related duties.
II. Engineering Construction (Oil/Gas Engineering)
1. Projects: Albayroni Ammonia Energy Optimization Project –Shutdown Works
(February 1, 2013 – Aug 09, 2013)
Company: ARCC/EEI-KSA
EPC Contractor: Saudi Toyo Engineering Corp.
Position: Engineer Field -Mechanical
Reporting to: Mechanical Superintendent (Rotating/Static)
Unit: Field Operation Group
Job Summary:
Works under the direct supervision of Superintendent. Coordinates all Engineering aspects such as RFI, RFIT, WTS and “as-built” drawing preparation. Assist on preparation of construction methodology and conducts time and motion study in every aspect of mechanical activities to improved productivity. Assumes other duties as assigned by my superior.
Responsibilities:
Ensure projects are completed according to project plans.
Prepares construction methodology (static, rotating, turbine assembly, internal trays and catalyst loading).
Provides issued for construction drawing at site as per client approval.
Monitors work for compliance to applicable codes, accepted engineering practices and standards.
Monitors and evaluates work progress at site and prepares erection materials to be installed as per shutdown works scheduled.
Work as Material Engineer for pre-shutdown, shutdown, and turn-around works in all rotating, static, turbine parts assembly, internal trays, catalyst loading and equipment modification.
Assigned material expediter to prepare and expedite all assembly/erection equipment material as per scheduled priority.
To ensure all erection equipment materials to be issued at site on time before schedule knocks.
Prepares and purchase tools/equipment needed to execute pre-shutdown, shutdown and turn-around works.
Monitors quality, safe and productivity in collaboration with FOG and support disciplines (Quality Control, Planning and Cost, and Engineering Department).
Coordinates with the clients for any field revisions encountered against bid drawing and generate additional work cost.
Assist foreman and field supervisors in familiarization of mechanical job work scope and promulgate approved construction methodology.
Assist on Testing and Pre-Commissioning Activities.
2. Projects: SAMco. Acrylic Acid Project (July 28, 2012- January 31, 2013)
Company: ARCC/EEI-KSA
EPC Contractor: Samsung Engineering Co., Ltd.
Position: Senior Field Piping/Construction Engineer
Reporting to: Construction Superintendent/Manager (Piping/Mechanical)
Unit: Field Operation Group
3. Projects: Hadeed Long Expansion Project (May 3, 2011 – April 28, 2012), ARCC/EEI-KSA
Company: ARCC/EEI-KSA
EPC Contractor: Industrial Beteiligung Services and Contracting L.L.C SA
Position: Field Piping Engineer
Reporting to: Piping Supervisor
Unit: Field Operation Group
4. Projects: NCP-Ethylene Plant Project (Aug 13, 2009 – March 03, 2011), ARCC/EEI-KSA
Company: ARCC/EEI-KSA
EPC Contractor: Japan Gas Corp.
Position: Junior Field Engineer
Reporting to: Piping Supervisor (Fabrication and Installation)
Unit: Field Operation Group
5. Projects: Integrated Engineers Development Program-IEDP (June 8, 2009 – July 24, 2009)
Company: Equipment Engineers Incorporated Corp.-EEI
Position: Mechanical Engineer
Unit: Field Operation Group -IEDP Batch 2
Job Summary:
Works under the direct supervision of Superintendent. Assigned a gang of men to execute piping works construction. Evaluates and monitors work Progress and Productivity. Resolves field design problem and coordinates all Engineering aspects such as RFI, WTS, JCRF and Permit to Work System. Develop field piping work procedures and parameters and “as-built” drawings preparation. Time and motion studies of piping work activities to improved productivity. Assumes other duties as assigned by my Supervisor.
Responsibilities:
Ensure projects are completed according to project plans.
Provides issued for construction drawing at site as per client approval.
Monitors work for compliance to applicable codes, accepted engineering practices and standards.
Assigned a gang of men to execute piping works construction as per schedule.
Assist on quantification including cost estimates for any change order and additional works.
Coordinates all Engineering aspects such as RFI/TQ, RFIT, WTS and “as-built” drawing preparation.
Assist skilled workers on preparation of work execution based on approved construction methodology.
Prepares construction weekly and monthly schedule.
Assigned group of line checkers to evaluate work Progress at site as per piping test packages priority.
Coordinates with clients for any field construction revisions and additional cost.
Conducts toolbox meeting on quality, safety and Productivity.
Conducts time and motion studies of piping work activities to improved productivity.
Monitors and evaluate productivity and work activities.
Assist on Testing and Pre-Commissioning Activities.
I.Manufacturing and Industrial Process(Operation and Maintenance)
1.Universal Robina Corporation (Feb 3, 2009 – April 22. 2009), URC-El Salvador, Mis-or. Phils.
Position: Process Operator
Unit: Production Operation
Responsibilities:
Process operation for Refresh Fruit Drink
Piatos process Sheeter Operation
V-Blending Operation
Process trainee operation for Nova Country Cheddar
2.Nestle Philippine Inc. (Apr-May 2008)
Position: On-the-job trainee
Unit: Predictive Maintenance System
Responsibilities:
Vibration Testing using Data Collector
Laser shaft-coupling alignment
Thermal Testing
LICENSURE/ACCREDITATION:
Registered Mechanical Engineer, Registration no. 0075756
Sustaining Technical Employee, DTI-PCAB
Pilipinas Shell Petroleum Corp. Accredited Project Supervisor
SKILLS:
Construction Project Management
Supervisory Skills
Pipe fitting
Steel working
Millwrighting
Computer: Microsoft Office, Power Point
AWARDS
Semi-finalist, Final Year Project Presentation (College)
2nd place Mid-Year PSME National Convention Quiz Bowl (College)
3rd placer History Quiz bowl (High School)
Honorable Mention (Elementary)
Seminars/Training ATTENDED:
Event Date Venue
1. Construction Project Management September 24, 2018 Cagayan de Oro City
2. Occupational First Aid and BLS August 01, 2018 Cagayan de Oro City
CPR with AED Seminar
3. Construction Occupational July 14, 2018 Cagayan de Oro City
Safety and Health
4. Project Supervisory September 21, 2018 Cagayan de Oro City
5. Tank Cleaning Supervisor July 01, 2018 Cagayan de Oro City
6. Basic Millwright Course February 01, 2013 Jubail, KSA
7. Foremanship Course February 02, 2011 Juaymah Camp, KSA
8. Health and Safety Environment August 20, 2009 Jubail, KSA
9. Good Manufacturing Practices February 16, 2009 URC, El Salvador, Mis-Or.
REFERENCES:
Bobot Pedral, Quality Control Manager
JGC Philippines, Inc., 2109 Prime Street, Madrigal Business Park,
Ayala Alabang, Muntinlupa City
Cp No. 099********
James Bulay-bulay, Mechanical Superintendent
Al Rushaid Const. Co. Ltd. PO Box 31688, Petroleum Center. Tower A Doha Road
Al Khobar, Kingdom of Saudi Arabia.
Cp No. +966*********
Engr. Mark Andrew Barretto
PSPC Terminal Manager.
Contact No. 091********
Engr. Jess Noel R. Delima
Purok 5, Crossing Libona, Bukidnon
Email Add: adkj2y@r.postjobfree.com
Contact No.: 093********
Noel R. Delima
Brgy. 28 Osmeña St., Cagayan de Oro City
Email add: adkj2y@r.postjobfree.com
Contact no. 093********