SOBOYEJO OLUFEMI KAYODE
*, **** ******, ***** ******, Iju- Ishaga Lagos
adkgdk@r.postjobfree.com
State of Origin: Ogun State, Abeokuta South LGA
Marital Status: Married
Gender: Male
Objective
To work with existing staff as a team player, contribute my quota to the organization with a creative input and above all being tenacious while carrying out assignment.
Skills
Good interpersonal and Organizational skills
Facilities Management & Project Management
Good Customer service
Time management potential
Creativity
Self – motivated towards achieving set goals
Ability to work efficiently as part of a team
Proficient in the use of Microsoft word, Power point, AutoCAD Knowledge (Electrical Design) and Microsoft excel
Interpretation of engineering drawings
Education & Training
HND, Electrical Engineering 2002
Yaba College of Technology (YABATECH), Yaba- Lagos
OND, Electrical / Electronic Engineering 1998
Ogun State Polytechnic, Abeokuta, Ogun State
Senior Secondary School certificate Examination 1994
Dairy Farm Secondary School, Agege, Lagos State
First School Leaving Certificate 1988
Keke Primary School, Agege, Lagos State
Others
Introduction to Facility Management Training June, 2008
Certificate of Accomplishment
Accredited by International Facility Management Association (IFMA) Nigeria Chapter.
Project Management Training June, 2010
Certificate of Accomplishment
Cashbridge Trust Limited
Training & business Consulting
132, Bode Thomas Street, Surulere, Lagos.
Member, Project Management Institute (PMI) June, 2010
PMI ID No: 1842796
The Nigeria Society of Engineering (Lagos State Chapter) June, 2013
Certificate of Attendance
Effective Maintenance Management Practices
Nigeria Red Cross Society (Lagos State Chapter) June, 2014
Certificate of Competence
IATA Training & Development Institute October, 2014
Airport Customer Service
Certificate with Distinction
Vinakom Associates October, 2015
Certificate of Participation
Fire & Safety Management
Autodesk AutoCAD Essentials September,2015
Employment History
Homeland Meridian Partners Limited 2018 – 2020
(Hubmart Stores)
Plot 1263, Adeola Odeku Street, Victoria- Island, Lagos.
Assistant, Head of Maintenance (Overseeing All Hubmart Stores)
Nature of Job
To coordinate and manage all facility equipment and plants such as:
33KV Electrical High Voltage Panel
400KVA X 3nos Synchronized generators
1600Amps Automatic Transfer Switch (ATS)
Electrical Troubleshooting & Supervision.
Water Treatment Plant and Sewage Treatment Plant
Elevators
HVAC and Extraction Systems
Other Operating Equipment
Manage all the Service Providers and contractors under facility / Maintenance department.
Weekly and monthly status operational report, project progress report, tracking of preventive and corrective maintenance work carried out in the terminal by Service Providers.
ACHIEVED PROJECTS
Installation of 33kv gang isolators with J & P Fuses 2019
Installation of pole mounted skipper meter for 33kv 2019
Installation of 33KV switchgear panel 2018
Role: Project Coordinator
Contractor: Power Systems Services Limited
James Cubitt Facility Managers 2017 - 2018
8A Floor, Union Marble House,
1, Alfred Rewane Road, Ikoyi, Lagos
Facility Manager, (Assigned to Diamond Bank, Admiralty Way, Lekki)
Nature of Job
To coordinate and manage all facility equipment
Manage all the Service Providers and contractors under facility department.
Weekly and monthly status operational report, project progress report, tracking of preventive and corrective maintenance work carried out in the terminal by Service Providers.
Bi-Courtney Aviation Services Limited 2008 – 2016
Murtala Muhammed Airport (MMA 2), Ikeja- Lagos.
Head, Power & Electrical Unit / Assistant Head of Facility Management
Nature of Job
Job planning, executing, monitoring and controlling of facility projects for electrical & power unit
Manage and coordinate power generation to the entire MMA 2 terminal
Manage all the Service Providers and the stakeholders under power & electrical unit
Manage and maintain terminal’s power generating sets (7.0MVA Captive power)
Manage and maintain both step up transformers (8.0MVA Captive power) and Step down transformers (5.7MVA Captive power)
Manage and maintain 11KV MV terminal switchgear (ABB Product)
Manage and Maintain 4nos 630Amps Ring Main Units (RMU)
To ensure constant power supply at MMA 2, Airport
Manage and maintain all electrical works at Murtala Muhammed Airport (MMA 2), Lagos.
Provide technical supports and trouble shooting of major technical faults
To analysis fault, implement power specifications and ensure that all wiring and connections are within the baseline.
Energy Management and billing System
Weekly and monthly status operational report, project progress report, tracking of preventive and corrective maintenance work carried out in the terminal by Service Providers.
Supervise and manage all electrical projects by contractors to assured they are completed with the required standard.
Project coordinator for facility department within MMA 2, Lagos.
Facilities maintenance coordinator within MMA 2, Lagos.
Achieved Projects
Upgrade of power generation August, 2012
Role: Project Coordinator
Project Deliverables: Installation and synchronization of 2nos 2000KVA Diesel generators (Perkins) and installation of 4nos 2000KVA step up transformers (ABB) at MMA 2 Power house (Lagos)
Contractor – Jubailibros Engineering Limited
Upgrade of power generation October, 2015
Role: Project Coordinator
Project Deliverables: Installation and synchronization of 2nos 1500KVA Diesel generators (Perkins) at MMA 2 Power house (Lagos)
Contractor – Jubailibros Engineering Limited
Upgrade of escalators and elevator at MMA 2, Lagos June, 2014
Role: Project Team
Project Deliverables: installation of 2nos escalator and 1no elevator at MMA 2.
Contractor – Mitsulift Elevators
Upgrade of ticketing counters, self- checking counters, E-gate for boarding and scanners at MMA 2. June, 2014
Role : Project Team
Project Deliverables: Provision of floor sockets (Raw & UPS power source) for 45nos ticketing counters, 4nos self-checking counters and 4nos E-gate for boarding
Upgrade of Apron Lighting fittings at MMA 2 October,2013
Role: Project Coordinator
Project Deliverables: Installation of 25nos 300Watt LED lighting fittings at MMA 2
Contractor – Team Electric
Electrification of 2nos Attendance Booth at MMA 2 Car Park July, 2016
Role: Project Coordinator
Project Deliverable: Electrical wiring (Conduit System)
Contractor – In-house electrical facility team
Guinness Nigeria Plc (Contract Staff) 2006 – 2008
Packaging Line electrical personnel
Nature of Job
Maintenance of Safety switches and electrical motors for conveyor systems at the packaging lines
Samson Industrial Automation Company (SIAC) 2006
Victory Plaza, Ilepo Bus stop, Alimosho LGA, Lagos
Guinness Contractor (Installation Engineer)
Nature of Job
Termination of power and control cables in the MCC & PCC panels and installation of electrical motors for conveyor systems.
Industrial wiring (Conduit / surface wiring system)
Project execution on brewery lines: Guinness Automated line 3 & 4(Ogba Brewery) and 7up Automated packaging line 3 (Oregun – Lagos)
Eko Engineering Ventures Limited 2005 – 2006
Old Nigeria passport office, Ikeja Lagos
Electrical Technologist
Nature of Job
Electrical design for Agro mechanical equipment
Erin ile Secondary School, Kwara State (NYSC) 2004 – 2005
Mathematics and Physics Teacher
Interest and Activities – Reading, Watching football and playing chess and scrabble
Referee:
On request