KEVIN COUGHLIN
Humble, TX **346
adkgcb@r.postjobfree.com
APS PLASTICS & MANUFACTURING
CNC Lathe Machinist January 2020-Present
Ran production on 2 HAAS CNC Lathes, including set up and program editing. CUSTOM MACHINING CORPORATION
CNC Lathe Machinist July 2018-December 2020
Recruited from a former supervisor at Intrex, because of my knowledge and experience in heat treating. Duties include but not limited to perform First Article before each job ran, responsible for all in house heat treating as well as set up and running production on 2 axis Mori Seiki lathes. Ran production on 5 axis MoriSeiki lathes, and proficient in reading blue prints and program editing on machines.
INTREX AEROSPACE
CNC Lathe Machinist August 2017-July 2018
Ran production on Mazak and More Seiki 2-5 axis CNC Lathes. Other duties include minor program editing, as well as changing tooling and touch off when necessary.
PRESCOTT’S
CNC Machinist / Lead man November 2014 – August 2017 Set up and ran production of CNC lathes. Cut bar stock to length, load appropriate program, edit program put in tooling including live tooling, set geometry for tooling and run parts according to print. Complete first article inspection and continue with in process inspections.
VESTAS BLADES
Logistics September 2014 - November 2014
Working with logistics team to ensure timely delivery of materials for production of wind turbine blades as well as transportation of blades within and outside of production facility.
PERSONAL TRAINER August 2012 – September 2014
Certified fitness trainer. Helping clients achieve their fitness goals by creating a workout program, meal plan and providing motivation to follow thru with program.
VESTAS TOWERS
Line Lead Steel Yard September 2009 - August 2012
Responsible for all incoming steel products via rail car and keeping accurate inventory of products. Responsible for unloading all railcars in timely fashion and moving empty railcars to pick up location. Responsible for several operators working under my supervision to keep steel yard operational. Set up and wrote all procedures for the steel yard along with training and certifying all steelyard workers on skid loaders, forklifts, overhead cranes and track mobile. ROCKY MOUNTAIN STEEL MILLS
Quality Assurance August 2008 – September 2009
Inspection of seamless steel tubing. Inspect for defects using magnetic. Particle testing and ultrasonic thickness testing. Correct any defects found if possible and mark as good or scrap depending on findings
ATLAS PACIFIC ENGINEERING
Machinist September 2006 – June 2008
Program, set-up and machine parts to blue-print specifications. Machining parts made from stainless steel, aluminum, brass, aluminum bronze, plastic, cold rolled steel and castings.
MINCO MFG
Set up/Lead Man February 2001 – August 2006
In charge of set ups on 22 CNC Lathes, perform first article on all set up. In charge of teaching and editing programs for 12 robotic arms used for loading and unloading parts from CNC machines. Responsible for performance of several machine operators who
worked under me. Responsible for retrieving blueprints, inspection, paperwork, job traveler, lot vouchers and inspection equipment for each cell. Knowledge on use of micrometers, calipers, pocket surf, run-out indicators, laser mic, optical comparator, micro-height, bore gages, thickness indicators. Received certificate for decision making and problem solving for CNC set ups from Pueblo Community college
MAXCOR MFG
Machine Operator April 1998 – February 2001
In charge of set up and ran production on various CNC Machines. Retrieved job traveler, prints, inspection paperwork and brought up material from warehouse.Received certificate for statistical process control QUALTEC MFG
Heat Treater January 1992 – April 1998
Singly ran heat treatment department on the night shift. Knowledge and use of two vacuum furnaces, two gas furnaces, several tempering ovens and deep freezes.