Post Job Free

Resume

Sign in

Engineer Project

Location:
Richmond, TX
Salary:
63000
Posted:
February 20, 2021

Contact this candidate

Resume:

ISAAC NUNEZ

BSc Petroleum Engineer

Senior Reservoir Engineer

Contact: +1-832-***-****

fielsted68@Houston, gmail.TX USA com

Senior Petroleum Engineer 19 years experience in the E&P industry worldwide Conventional & Unconventional asset process activities, outstanding performance in Reservoir Management & Production process. Managing Primary, Secondary, Tertiary Recovery and Enhance productivity project increment and optimization project evaluation. Advanced Experience Identify, prioritize, present, and monitor oil and gas development and exploitation projects, Identify and quantify oil and gas targets, Construct plans of depletion, Identify reservoir mechanics and predict potential for additional recovery

Software Skills Experience

• OFM-Oil Field Manager

Production Decline / Curve Analysis / Dynamic Pressure & Fluids Maps.

• Integrated Production System

Petroleum Experts IPM suite (MBAL, PROSPER and GAP)

• Pipe-Sim modeling

Well Performance Production / Optimal Well Design / Nodal Analysis

• Kappa Suite version 5.0

Pressure/Rate Transient Analysis (PTA & RTA) Saphir and Topaz

• PVT analysis/modeling

PVTSIM fluid.

• Eclipse, Petrel RE & EOR modeling.

Reservoir Characterization, Development Planning and Production Evaluation to Optimized Reservoir Performance.

E&P Industry Activities Experience

1. SCHLUMBERGER (International mobile) America 02/2009 – 06/2020 Position: Technical Service Group SPM / PTS / SIS segments Technologist Engineer.

Senior Reservoir, Production, & Optimization assets. Consultant Operation Filed Services, Sales Engineer. Technical and Software Consulting Team.

• Project: CASABE Asset Reservoir Integrated Evaluation & Production Optimization. Integrated team Geoscientists and Petroleum Engineers Join Venture Colombia.

• Project: Shushufindi Asset Join Venture.

Petroamazonas & Schlumberger Alliance.

• Project: Productivity Optimization project Lago Agrio & Drago Assets.

• Project: Production Optimization, Well test Evaluations.

• Project: OFM PASS Project Implementation South America.

• Project: Well Optimization Offshore operations PEMEX Alliance Mexico Conducted the selection and the preparation of well prognosis for work over activities for Pemex in CANTAREL Naturally Fracture Carbonate (NFC). 2. ARAMCO 01/2007 – 01/2009 Saudi Arabia (Middle East) Project: Increment Productivity Asset KHURAIS Field Asset, Abu Jifan & Mazahlij Position: Senior Reservoir & Production Engineer. Active participation in Portfolio Development Team work Saudi Aramco's Exploration & Production (E&P) business the Company's reserves portfolio KHURAIS Field Development

(Naturally Fracture Carbonate) work is the largest integrated oil project in company history and the largest in the history of the industry.

Team member of a multidisciplinary team for the largest field development in the history of the oil industry-Khurais Field. The team was able to design and execute a plan to drill and complete more than 300 wells in short time frame to meet the company’s expectation. Evolved in every aspect of the development including reservoir performance review, simulation study team member, prepare the well’s artificial well data set, secure well’s package approval, and monitor drilling operation.

3. HALLIBURTON / Landmark 2003 – 2006 Mexico.

Project: Advanced Recovery Productivity Asset. Alliance Pemex Project: Increment Production North Texas & Colombia Assets. Project: Optimization Cardenas Asset, OFM project implement. Reservoir, Production & Optimization Engineer

Responsible preparing program and well surveillance activities and reservoir definition and behavior prediction of assigned reservoir in order to preparing well stimulation and fractures treatment stimulation proposal and support in evaluation and analysis and determination of wells for application north round rock and around well located in private properties ranch location in Texas and North Mexico.

Unconventional Tight Reservoirs Asset Deep Water Mexico Gulf area generating new data fields, candidate to drill and work over, also MP Wells, based on conventional reservoir engineering and simulation studies to identify optimum recovery and field development options, adjusts reservoir development plans in response.

Generate Production Exploitation Plans Cardenas Asset, 45 well production, Villahermosa location.

4. LAGOVEN S.A. / PDVSA 1992 – 2002 Venezuela

Project: WESTERN Maracaibo Lake Fields Offshore VENEZUELA Development Reservoir Engineer

Conducted Monitoring and surveillance Conventional & Unconventional asset Reservoir & Production process for INTERCAMPO, BACHAQUERO, LAGUNILLAS & LAGUNA Assets offshore operation Maracaibo Lake over 650 well productions, 180 injections well. C-7-X14. Build exploitation Field Developed Plan (FDP) in Intercampo, Laguna & Lagunillas. Lead studious proposal for new locations and work over field jobs supervisions in offshore field such as stimulation jobs, MDT, and Build UP testing, Water flooding surveillance to maintenance and increase the productivity.

Conducted 197 well completion program covering, completion operations sequence, completion and perforating program, identifies opportunities to improve Education

• BSc Petroleum Engineering

• Specialization Geoscience & Reservoir Engineering, Development Productivity Exploitation Program.

International Center of Education & Development (CIED). 1996-1997

• Specialization Integral Study Numerical Simulations. International Center of Education & Development (CIED). 1997-1999

• Master Scientiarum Mathematics 2018.

• Domain languages English, Spanish & German.



Contact this candidate