PROFILE

I am having more than 21 Years of experience in Construction of Express way, Highways, Dams, Structures, Sewerage, drainage, irrigation, storm water, TSE, potable water networks, street light, communication system & Micro tunneling Service works and excellent human relation skill having dealt with variety of employees, contractors and clients. Ability to execute number of projects simultaneously.

1.DECEMBER 2018 TO PRESENT

Working as a Asst Manager (Project) with Concord Construction Company (Kallatra) in Kerala, India.

Project Details:

Name of the project: construction of bypass near Hubli city connecting NH 218 and NH 63 and Improvements to road from Bankapur Chowk (Km 405.200) to Channamma circle (Km. 407.70) of old NH-4 in Hubballi city limit in the State of Karnataka.

Responsibilities: -

Reporting to the General Manager (Tech).

Responsible for executing work including supervision of workman ensuring the safety and quality aspects as per the requirements of the project specification and monitoring the productivity of equipments, machineries and manpower as per the company norms.

Preparing the micro level program for the execution based on the look ahead construction schedule.

Excavation for NP3 pipe laying (1200 mm dia) for Cross drain and HDPE for irrigation main line and lateral line.

Execution of cross drainage system etc...

Coordinating with Clients meeting.

Coordinating with various inter department unit such as planning and cost control, Materials/Stores for their specific day to day activities related to project.

Execution of all types Utilities (dry & wet).

Preparing the monthly work done billing.

Managing the site, handling the manpower & Machineries, utilizing materials in proper way & better housekeeping.

Preparing the reconciliation statement at the end of month for the progress achieved.

Preparing the requirement statement at the beginning of the month for the target. Ensuring the Quality & Safety policies as required by the Company and sang list..

Execution of all types finishing works etc...

1.FEBRUARY 2018 TO DECEMBER 2018

Working as a Project Engineer with Sri Murugan Construction

Company in Tamil nadu India.

Project Details:

Name of the project : TamilNadu water supply and drainage board (TWAD) – Tirunelveli City development India.

Responsibilities: -

Responsible for executing work including supervision of workman ensuring the safety and quality aspects as per the requirements of the project specification and monitoring the productivity of equipments, machineries and manpower as per the company norms.

Coordinating with Clients/Consultants for the inspections and discrepancies in the drawings and for the clearance required in the day to day activities.

Preparing the micro level program for the execution based on the look ahead construction schedule.

Responsible for excavation of trench for DI pipe laying for water supply (800, 1200mm dia) and HDPE for irrigation main line and lateral line.

Ensuring the implementation of Project specifications, regulations for all materials & installations.

Preparing the sang list and close it.

2.AUGUST 2017 TO DECEMBER 2017.

Working as a CIVIL Inspector with CDM SMITH Engineering and Consultant in Qatar.

Project details:

Name of the Project: Design and construction of surface water drainage system in main intersection Phase 2. Location: Doha, Qatar

Project Tittle: PWA/NC/015/2017/L. Phase - FPS- 23- HS-012

Responsibilities: -

Receiving and attending the Inspection Requests, ensuring that works are carried out according to specifications, Inspection and Testing Plan, method statement, quality plan, and approved shop drawings.

Sewerage, drainage, irrigation, storm water, TSE, potable water networks, street light, communication system, (ITS & SSD), earth work, marine work, underpass, directional drilling, thrust boring, Micro tunneling work in Phase - FPS- 23- Hot Spot 278 & 281.

Deep Storm Water Line Micro Tunneling Max. Depth of 3 m and Length 30 Rm.

Evidence of monitoring to be recorded on QCE daily site reports.

Reporting to supervisor on site progress, quality and safety non- compliance.

Coordinating with surveyor on joint inspections.

Taking-off of site measurements and checking of such measurements on site.

Evidence of surveillance to be recorded on the QCE site observation report (SOR) and QCE Non-Compliance Report(NCR).

Maintaining contemporary site records and photographs.

Assisting supervisor in the preparation of the daily, weekly and monthly reports.

Reviewing of the AS-Built drawings, Method statement and ITP(Inspection test plan).

Attending the progress meeting and monitoring the work as per project schedule.

Preparing the snag list and Balance work details.

3.JUNE 2006 TO MARCH 2017

Worked as a Sr.Engineer – Highways with Galfar Engineering& Contracting S.A.O.G Muscat, Sultanate of Oman, (An ISO 9001, ISO 14001 & OHSAS 18001 registered firm having operations in Qatar, U.A.E, Brunei & India) From JUNE 2006 to MARCH 2017.

Reference :-

Mr. Anil kumar pallai. DGM (R&B)

Mr. Moshin. Sr Project manager

Mr. Satyanaranayan. Project Manager

Projects handled: -

A.BARKA – NAKAL ROAD PROJECT.

Dualization of 38.75 km of road, each 2 Lanes of 3.75m + 2.5m paved shoulders, Service roads length of approx 27 km of width 3.5m + 1.5m, Shoulder repairing and widening the asphalt paving of 37 km both side 1.5m width (wadi mistal junction to Al rustaq R/A) & 7nos Interchanges construction, 86nos of box culvers, 2nos of Pedestrian overpass, 6nos of Pedestrian underpass, 2nos Wadi Bridge & 4nos R/A with design and Protection and Relocation of all underground utilities & placing of street light pole and speed radar camera.

Project Details:

Value of Project : 64,961,425 Omani Rial

Client : Directorate General of Technical Affairs.

Consultant : Renardet SA & Partners Consulting

Engineers LLC

Cost Consultant : Ministry of Transport and Communication.

B.MUSCAT EXPRESSWAY

(Al Quram to Al Naseem) This is the first Expressway in Sultanate of Oman, which involved the construction of 182 Km long road with service roads, 39 bridges and under passes including 12 interchanges with box girders, 131 box culverts of varying sizes, 28 million Cum of earthwork, 240,000 Sqm. of MSE wall, 500,000 Cum of asphalting and 273,000 Cum of concrete.

Project Details:

Value of Project : US $330 Million

Client : Muscat Municipality

Directorate General of Technical Affairs.

Consultant : Parsons Group Oman Engineering LLC.

Parson Transportation Group

Cost Consultant : Majan Engineering Consultants.

Responsibilities: -

Reporting to the project Manager.

Responsible for executing work including supervision of workman ensuring the safety and quality aspects as per the requirements of the project specification and monitoring the productivity of equipments, machineries and manpower as per the company norms.

Sewerage, drainage, irrigation, storm water, TSE, potable water networks, street light, communication system.

Preparing the micro level program for the execution based on the look ahead construction schedule.

Execution of embankment formation, mass excavation such as rock excavation, sand dune excavation, preparation of Granular Sub Base, Aggregate Base Course, Bituminous Wearing Course, High embankment slope protection, fixing of all types of Barriers & curb, drainage network and all finishing works etc...

Execution of all types (Dry Utilities Telecommunication, Electrical cable laying & wet Utilities Strom Water line, cross drainage and other) utilities services

Coordinating with Clients/Consultants for the inspections and discrepancies in the drawings and for the clearance required in the day to day activities.

Coordinating with various inter department unit such as planning and cost control, Materials/Stores for their specific day to day activities related to project.

Preparing Earthwork excavation quantity calculations for the submission of monthly billing.

Managing the site, handling the manpower & Machineries, utilizing materials in proper way & better house keeping.

Preparing the reconciliation statement at the end of month for the progress achieved.

Preparing the requirement statement at the beginning of the month for the target.

Preparing the daily progress report.

Ensuring the Quality & Safety policies as required by the Company.

4.JUNE 2000 – JUNE 2006

Worked as a Jr. Engineer with Bhageeratha Engineering Limited [An ISO 9001 -2000 Company], Cochin, Kerala, India.

Projects handled: -

A. MAY 2004 – JUNE 2006

Worked in Kerala State Transport Project – 1 in association with PATI (Malaysian Company)

Project Details:

Client : Public Works Department, Kerala

Consultant : RITES – BECA – WSA J.V

Value of the Project : 2140 Million Indian Rupees

Length : 128 Kms

Funding Agency : World Bank

C.NOVEMBER 2001 – MAY 2004

Worked in National Highway – 7 [Salem – Bangalore]

Project Details:

Client : National Highway Authority of India

Consultant : Mukesh Associations

Value of the Project : 750 Million Indian Rupees

Length : 20 Kms [Four Lane]

Location : Salem

Responsibilities: -

Supervision and Execution of Earthwork [Excavation, Embankment and Sub grade, Sub Base [Granular Sub Base], Base Courses [WMM], Asphalt Works [Prime Coat, BM, DBM, Tack Coat and BC] and Structure works [Culverts, Drainage and Retaining walls]

Execution of Utilities services (cross drain & cable laying)

Maintaining Levels and Quality as per MORTH Specifications

Optimum utilization of Machinery and Manpower

Cost controlling and wastage reduction

Reconciliation of materials used

Daily Monitoring of works

Weekly and Monthly Programming as per budget

C. JUNE 2000 – NOVEMBER 2001

Worked in Vadakku Pachair Reservoir Project at Tamil Nadu India.

Project Details:

Client : Public Works Department, Tamil Nadu

Value of the Project : 1100 Million Indian Rupees

Length : 3.5 Kms [Earth Embankment Work]

Funding Agency : World Bank

Responsibilities: -

Supervision and Execution of RR Masonry, Embankment Bund work, WBM & SDBC Roads and Structural Works

Maintaining Levels and Quality as per Specifications

Optimum utilization of Machinery and Manpower

Cost controlling and wastage reduction

Daily Monitoring of works

Weekly and Monthly Programming as per budget

Subcontractor bill certification

5.DECEMBER 1999 – MAY 2000

Worked for Public Works Department, Tamil Nadu as a Supervisor

Project Details:

Manimutharu Main Canal Desalting and Drawings & Bill preparation

6.JULY 1998 – DECEMBER 1999

Worked for Sri Jothi Earth Movers as a Supervisor in a Pipe Line Project

Responsibilities: -

Supervision and Execution of Pipe Laying and Earth work

Levels and Alignment for Pipe Laying

Testing

ACADEMIC & PROFESSIONAL QUALIFICATIONS:

1995-1998: Diploma in Civil Engineering from St. Xavier’s Polytechnic, Seydunganallur, Tuticorin, Tamil Nadu, India

1994-1995: SSLC from Schaffter Higher Secondary school, Tirunelveli, Tamil Nadu, India

PERSONAL DETAILS:

Contact Tel. No. : +91-739*******.

E-mail ID : adkclz@r.postjobfree.com / adkclz@r.postjobfree.com

Date of Birth : 14th February 1979

Nationality : Indian

Gender : Male

Marital Status : Married

Driving License : Oman, India & GEC (Valid up to 2027)

Father’s Name : K. S. Subramanian Pilli

Languages Known : Tamil, English, Hindi, Arabic & Malayalam

Permanent Address : 98 Thadiveeran kovil west street

Tirunelveli - Town

Tirunelveli Dist, Pin: 627006

Tamil Nadu, India.

PASSPORT DETAILS:

Passport No : L 3805686

Date of Expiry : 03/09/2023

DECLARATION:

I do hereby declare that all the above given particulars are true to the best of my knowledge and can produce the testimonials as and when required.

Place : Tirunelveli Yours truly,

Date :

SANKAR.S



Contact this candidate