Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Ploiesti, Prahova, Romania
Posted:
February 19, 2021

Contact this candidate

Resume:

Street Aleea Seciului no. *

Ploiesti city

Prahova county

Romania

+40-728-***-***

adkbgi@r.postjobfree.com

Personal Data

Nationality: Romanian Drilling and Workover operations

Status: Married

Job Profile: Petroleum Engineer – Well Completions

Experience

December 2017– September 2020 Halliburton - Qatar

Service Leader - Intelligent Well Completion

North Oil Company (rig Ensco 110; HAK 10; HAK 12 and Dukhan) & Shell Qatar (rig Al Khor – well NF18B & NF18C).

Concentrated effort in achieving operational excellence, and customer satisfaction for long-term growth and profitability of HCT;

Interact with customers and supervise the activities of Completions service and/or shop personnel to exceed customer requirements;

Improve operational efficiency by applying latest available completion technology and best completion technique in all facets of well completion during development drilling- completion and workover operations in order to maximize hydrocarbon recovery;

Reduce non productive completion time and trouble cost by identifying problem areas, analyzing non productive time trends and recommend remedial action in order to achieve optimum operating cost and performance;

Prepare and participate in pre and post job technical planning and review meetings including Phase Gate meetings, CWOP, Risk Assessment, AAR, KPI, NPT and lessons learnt sessions;

Preparation of completion schematics, operational procedures for installation, equipment ordering and equipment list generations, Torque and Drag, Tubing movement;

Consolidate, capture and verify the lesson learnt and technical knowledge of Well Completion and disseminate the knowledge to all team members so that everyone is well informed and contribute to the improvement in their work processes and technology applications;

Recommend specific optimal (safe, timely, efficient and cost- effective) well completion operational resolutions/ measures/ technique by appraising/ analyzing past / current operational problems and by being proactive during progress of operational activities in order to achieve operational excellence with significant cost reduction;

Review, analyze and verify the scope of work and technical specifications for Well Completion equipment for tender packages in order to be in line with the engineering standards and meeting the operational requirement;

Monitor and review well requirements in accordance with the forward well plan;

Conduct engineering and technical studies associated with well completion in order to increase competitiveness and improve well integrity;

Support oilfield operations and supervision both onshore and at rig site.

2015 April – September – Weatherford - Turkmenistan

Technical Completion Manager

Planned logistics for completion, workover and well intervention for different international operator companies based in Turkmenistan (Petronas, ENI and Dragon Oil) and local operators (TurkmenOil and Turkmengas);

Co-ordinate and supervise the preparation and testing completion equipment according to Completion Engineering / Production Department from operator companies;

Engage with customers at a pre-tender stage of completion projects, ensuring appropriate technical expertise to align Weatherford with customer’s interests for a strong business relationship;

Active company representative for regular operator meetings with technical presentations of latest equipment and technology suitable to accommodate client project specific requirements.

2013- 2015 – Halliburton - Angola

Completion Service Specialist 3

Deepwater Well Completions BP – Blocks 18 & 31.

Team member involved in the business efforts in Horizontal, Sub Sea, Deepwater Stand Alone Screens, Frac Packs, Gravel Packs, Well Completions Injectors and Producers;

Active contributor in operational phases of project from planning, designing and equipment loading preparation, to “job load out into the basket”;

Supervise and responsible for equipment assembly, ensure workflow process is properly followed according to company quality standards and customer particular requirements – make up torque and pressure testing;

Responsible to receive field equipment back for service or reroute to company warehouses, including follow up and supporting documentation;

Equipment configuration for subsea completions including horizontal screens, swellable packers, retrievable sealbore production packers, packer completion assemblies (sealbore extensions, seal assemblies – no go locators, seal units, muleshoe guides, polished bore receptacle, travel joint), flow control valves, chemical injection systems, safety valves, hydraulic hydrostatic-set packers;

Actively participate in investigations, reporting and customer follow up.

2007 - 2013 – Weatherford WCT - Romania

Completion Engineer

Selecting the Completion tools based on contractor requirements and well data;

Active participant and involvement in creating well design process for customers as OMV Petrom, Expert Petroleum, Petrofac, Hunt Oil, Melrose Resources and ROMGAZ;

On-call supervision support for running completion tools, critical operations (Sand Control equipment, hydraulics and mechanical packers, flow control equipment, subsurface safety valves, etc);

Assist with troubleshooting investigations by gathering Completion / Sand Control post-job information from operations;

Organize and assemble Completion / Sand Control post-job review material including “as run” drawings;

Working close with Workover / Completion crews in performing PCP and RRP downhole and surface equipment installations for OMV Petrom on Ticleni field;

Spacing out, monitoring, troubleshooting and optimizing functioning of RRP and PCP pumps in the wells.

2000- 2007– OMV Petrom – Romania

Petroleum Engineer

Provide completion design and technical details for Sand Control jobs performed on OMV Petrom fields;

Inventory management & Sand Control equipment purchasing;

Sand Control Equipment preparation – make-up, torque and pressure test;

Follow up of critical jobs on location;

Prepare of Sand Control final reports, capture and document learnings.

Education & Training

2001- Master of Reservoir Engineering

Petroleum and Gas University of Ploiesti, Romania

2000 - Bachelor of Petroleum Engineering

Petroleum Gas University of Ploiesti – Faculty of Drilling wells and Reservoir Engineering, Romania

Training & courses

IWCF Well Intervention Pressure Control Certificate level 4 (Maersk Training Centre Doha) – valid till 2022

IWCF Well Control Surface BOP Stack Certificate level 2 (Oil & Gas University Centre Ploiesti) – valid till 2020

T-BOSIET / HUET – valid till 2021

H2S – valid till 2021

CA EBS & MK50 – valid till 2020

Introduction in Sand Control - Petroskills – London, England

Completion solutions - Halliburton, Carrolton, USA

Sand control solutions – Halliburton, Montrose, Scotland

Sand control: Gravel Pack Systems - Weatherford, Houston, USA

Homco Casing Patch - Weatherford, Langenhagen, Germany

Completion ZoneSelect and Swellable Technology - Weatherford, Aberdeen, Scotland

Introduction to Wellbore Calculations - Weatherford, Hannover, Germany

Applied Downhole Tool Hydraulics - Weatherford, Hannover, Germany

Tubing Stress Applications - Weatherford, Hannover, Germany

Finance Essentials for Non-Financial Managers – Weatherford, Ploiesti, Romania

Provide drilling engineering expertise and support in the planning and execution of drilling operations

for the provision of 3rd party services

Design drilling programs

Prepare AFE's and monitor cost control

Provide drilling superintendent and materials coordinator with equipment lists for program

Maintain end of well



Contact this candidate