G SATHEESH
Senior Civil Engineer
PROFESSIONAL SUMMARY
Competent professional with 10 years of experience in
CONTACT DETAILS:
the field of Civil Construction and Management and
: ************@*****.*** public projects. Have a knowledge and experienced in
various types of work such as STP Tank, Mivan
: 919********* Shuttering work, Grade Slab Work, Tank/ Vessel
: 335/79, Abdul Kalam 1st foundation, Pipe rack/ Column foundation, Power Plant
street, EVP Prabhu Avenue, Chimney Towers, main control building establishments,
Paraniputhur, Iyyapanthangal, High Rise Residential and commercial Buildings, High
Chennai - 600122, Tamilnadu, Rise Residential apartments and High rise IT parks. In
India. the field works also gained experiance such as cost and
estimation report, planning and cost reporter, site
: execution, management of the building works and safety,
www.linkedin.com/in/satheesh- etc.
govindan EXPERIANCE
1. New Consolidated Construction Company
Limited(NCCCL) - Prestige Tech Cloud IT Park,
SKILLS: (High Rise Building) as Senior Engineer, in
MS Office Bangalore– 2019 to till date
AUTO CAAD Responsibility:
RGS - REBAR • To manage the site execution, billing and costing,
coordination of site work.
EDUCATION: • To perform foundation work, Grade slab work,
Diploma in Civil Engineering - Mivan shuttering work wall and lift, UG Sump work and
KSR EDUCATION INSTITITE Grano flooring work.
OF TECHNOLOGY, Erode, 2010. • Execution of STP tank work for various towers in the
site.
CERTIFIED:
• The high rise building commercial and appartment
AUTO CAAD Drafting work execution from substructure to super structure.
and Productivity Tools in • Site planning execution, site costing and reporting is
Autodesk, 2009. also done.
REBAR Detailling in RGS • The site execution with preparation of client bill,
Construction Technilogies BBS, Labour Bill checking has been done.
Limited 2010.
TRAINING PROGRAMMES: 2. Coramendal Engineering Company Limited –
Engineer MS2 grade level, Visakapattinam -2019.
Project Management
Responsibility:
Training Programme
• To manage the site execution, site costing and
Productivity training reporting and coordination
Programme • The execution of shuttering work and steel executive
HSE System development in the building is also coordinated.
training programme Quality • Substation structural work, Plastering, Finishing and
management system. painting work are all coordinated.
• Overall foundation work and bolt fixing work are
also handled.
AREA OF EXPERTISE:
• Water proofing has been coordinated all tanks and
Well versed with Project also sika grouting work also done.
Execution, Site executive, • All type of industrial buildings like water pump
construction management. house, water treatment plant, admin building had
Competent to comment on worked and experience well.
designs of consultants, • Cooling tank, ICW tank and precast work also done.
suggest construction • Managing labour Bill, plastering work, block work
friendly detailing, improve are all arranged and coordinated.
upon specifications. 3. Eversendai Construction Private Limited - DLF
Billing and Costing IT Park as Senior Engineer,(High Rise Buildings)
Estimation and cost reporter Chennai – 2017 to 2018.
Risk analysis and mitigation Responsibility:
strategies. • Execution of concrete, shuttering and steel work has
Finishing works. been done.
TECHNICAL ACTIVITY: • Block work, plastering work, core wall and texture
painting work executive has been coordinated and
The Specialized techniques managed.
like Water Proofing,
• Execution of lift work of 12 numbers has been done
Cement Grouting work,
sucessfully.
Chemical coating leakage,
• The site execution with preparation of client bill,
Screed Concrete and
BBS, Labour Bill checking has been done and handed
Texture painting work has
over the building successfully.
been well executed.
4.NAPC Private Limited, Minda Project and MJ
casting projects as Senior Site Engineer, Bangalore
In the Floor finishing and – 2013 to 2017
Fall Ceiling various Responsibility:
techniques and materials • Execution of concrete, shuttering and steel work has
handled like Flooring been done.
protection sheet, Dry • Block work, plastering work and painting work
finishing, Fall Ceiling, executive has been coordinated and managed.
Gypsm Fall Ceiling work,
• The site execution with preparation of client bill,
Flooring tiles, Vertified and
BBS, Labour Bill checking has been done and handed
Anti verified tiles, Granite
over the building successfully.
marble fixing, and Kadappa
• Planning of costing controller and Costing reporter
floor finishing.
also done.
In the door and fixing
• Admin management work also managed.
handled various types like
Glazing window doors and
5.ECCI India Private Limited, Chennai, ARS
fixing, UPC window door
Power Plant,OPG Power Plant as Junior Engineer,
fixing, Aluminium window
2011 – 2012
fixing,Glass fixing, Gypsm
Responsibility:
board Partition wall,
• The site execution and construction STP Tank, ETP
Elevation Glading work.
tank, transformer foundation, cooling tower, cylo,
boiler tank, DG duct and Coal yard work has been
managed.
• Shuttering and steel work execution has also been
PERSONAL INFORMARTION: done.
• Executive of Bridge work harder section and
Date of Birth : 25.07.1985
Assemble building work has been managed.
Passport Number : L6363791
6.DLF Building India Limited, Chennai, DLF
Gender : Male
Commander Court Project as Site Supervisor –
Languages : Tamil, Telugu, 2010 to 2011
English & Hindi. Responsibility:
• Site Executive for Raft, Column and Slab.
DECLERATION:
I hereby declare that the information furnished above are true and correct to the best of my
knowledge and belief.
Yours faithfully,
Date: 13.02.2021
Place: Chennai.
(G SATHEESH)