Abdelaziz Shawareb
Amman, Jordan
+962-********* ****.********@*****.*** https://www.linkedin.com/in/aa-ismail/ SUMMARY
Mechanical Engineer with eight years of experience in site supervision in the oil and gas and healthcare sectors
Energy assessing and auditing skills of buildings for initial compliance with BREEAM or LEED accreditations.
On state of the art for all renewable technologies such as solar, wind, hydrogen, geothermal, and biofuels
Lead in conducting feasibility and viability studies for different renewable solutions for each case study.
Significant experience in using energy software solutions such as RETscreen, HelioScope, and Homer
Holds a Distinction from Brunel University London in MSc. Mechanical Engineering
On the course of gaining Chartered Engineer (CEng) status in the UK, approved by JEA and KSE EDUCATION
2019 Brunel University London
MSc. Mechanical Engineering in the field of Renewable Energy with Distinction London, UK
2011 Hashemite University
BSc. Mechanical Engineering minor in Mechatronics
AlZarq, Jordan
WORK EXPERIENCE
2020 Project Engineer at 7Kat Co. Mexico City, Mexico Hydrotek Engineering is a lead water solution company that is part of Al Injazat Holding, established in 1946 2012 – 2018 Mechanical Engineer at Hydrotek Engineering Co. Al Rai, Kuwait Hydrotek Engineering is a lead water solution company that is part of Al Injazat Holding, established in 1946 2011 – 2012 Mechanical Field Engineer at SK Engineering and Company Al Abdalli, Kuwait SKEC is a Korean construction company, and it is part of the SK Group, which has +70,000 employees in 113 countries PROJECTS:
2020 RESIDENTIAL VILLAS AND CHALETS
The contract value of $1.5 Million
Prepared shop drawings and material submittals
Followed up with site activities and inspected works against approved drawings
Billed completed activities on monthly based
2015-2018 THE CONSTRUCTION OF AL AMIRI STATE HOSPITAL EXPANSION 416 beds capacity and contract value of $103 Million
Successfully led the site team of 150 members to execute mechanical works
Inspected the work packages against approved drawings, specifications, and local codes.
Undertook periodic inspections on-site following the Inspection and Test Plans
Assessed the health, safety, and any environmental issues that may arise at the site.
Monitored continuously, the quality of works reported daily activity on-site.
Effectively coordinated between discipline-related works resulted in a smooth workflow.
Provided technical engineering solutions on-site for the day-to-day site issues that surfaced. 2013-2015 THE CONSTRUCTION OF BIO-REMEDIATION SOIL TREATMENT AT MINA ABDULLAH KNPC The contract value of $4.3 Million
Trusted with a budget of the project and successfully handed it over
Managed a team of 30 and two subcontractors, overseeing the direction of the project.
Supervised the project ensured that the client's specifications and requirements were met.
Reviewed progress and liaised with quantity surveyors to monitor costs
Made periodic safety inspections, ensuring construction and site safety 2012-2013 SE-80 TSE NETWORK PUMP STATION AREA C1 AND STORMWATER PUMPING STATIONS RA211, RA121, RA240, RA263
The contract value $55 Million
Prepared and approved the shop drawings from the consultant
Submitted, approved, and supplied all submersible pumps and other material
Supervised all installations, approved, and billed monthly the delivered work packages
Commissioned and negotiated the snag list tell closure of the projects. 2011-2012 NEW GAS BOOSTER STATION 132 PROJECT AT KUWAIT OIL COMPANY (KOC) The contract value $680 Million
Planned resources, workforce, and equipment to execute works of the erections of vessels, scrubbers, pumps, and steel structures
Efficiently managed weekly meetings with civil and piping divisions project's schedule.
Led a team of 50 members who carried modifications on steel structure for the HP & LP SKILLS:
Proficient in Excel, PowerPoint, Word, and AutoCAD
Knowledge of C and Python languages
Languages: English (Fluent), Arabic (Native), Spanish (intermediate) EXTRACURRICULAR ACHIEVEMENTS:
Habasha project: Sought financial support from protentional donors for Syrian student refugees
Warratel Center: Trained 25 youth to become future leaders and empowered them to face life challenges PUBLICATIONS:
Abualshawareb, A., & Dehouche, Z. (2019). Evaluation of Clinical Waste Treatment and Power/Heat Generation Using Gasification Integrated Fuel Cell System on Site for Hillingdon Hospitals, UK. MC2019 Masters Conference People and Buildings. London: Network for Comfort and Energy Use in Buildings.