Post Job Free
Sign in

Rigger Team Leader

Location:
Posted:
March 26, 2021

Contact this candidate

Resume:

Jerry B. Cruz

E: *********@*****.***

M: +639*********

T: +63 2-822******

Education: Bachelor of Science in Customs Administration

**** – 1984 (undergraduate)

Philippine Maritime Institute

Career History:

Dec. 14, 2019 - Jan.26,2021 E-Formula, DMCB and SVR Tel. Philippines

TELECOM RIGGER

Key Accountabilities and Responsibilities

Worked in data center by installing servers and switch in their corresponding rack

Installing and connecting of fiber optics, LAN cables, power plugs and transceivers

Cable grooming and re-routing

Worked on antenna transfer project (ATP-Ericsson)

Mounting or installing of proposed AAU, AMB, RRU’s/ERS and other accessories and equipment’s

Checked the proper orientation of installed antennas specially the proposed azimuth and tilting

Supervising on basic rigging on mounting of antennas and other technologies including pre laying and termination of CPRI’s and power cables

Installing of cabinet or rectifier in the proposed base pad

Assisting the Team Leader in power tapping and termination

Receiving of deliveries (MOS)

Antenna dismantling, integration, power tapping, and rectification

Working at height on a range of telecommunications structures including poles, towers and masts to install antennas

Place insulation over conductors or seal splices with moisture-proof covering (waterproofing)

Permitting job and performed other related job as assigned

Aug. 25, 2019 – Oct. 07, 2019 PLB FORTUNA NORD STREAM 2

RUSSIA - GERMANY

RIGGING FOREMAN

Key Accountabilities and Responsibilities

Hauling of cement coated pipes and setting up to roller for welding

Preparation of mooring anchor and pennants for deployment

Installing and dismantling of working platform

Installing of pipe straightener

Banking/signaling to crane

Supervises and coordinates activities of workers engaged in all rigging and lifting activities to ensure compliance with safety procedures and method statements

Familiar with heavy lift plans and procedures

Assists and determines the proper method of lifting equipment for each assigned project

Ability to optimize resources (manpower, equipment, and materials) to ensure efficient and timely completion of project

Ensure good and proper workmanship are applied in all stages of work.

Feb. 01, 2019 – March 20, 2019 COES Shanghai Salvage Company

QATAR Petroleum WHP-3/NFA-FIELD

QATAR

RIGGING FOREMAN

Key Accountabilities and Responsibilities

Loading/unloading of materials and equipment from the quayside to to the vessel and or from the vessel to the quayside

Preparation of anchors, chains and wire slings use for mooring points

Vessel to vessel transfer of materials and equipment and off-signers/on signers personnel

Banking or signaling on crane

Slinging of temporary platform for lifting

Assisting on lifting of the topside platform (2,900) Tons for installation

Installation of Flare Boom

Conducting toolbox talk

Oct. 12, 2017- Aug. 20, 2018 PHILSPEC CONSTRUCTION

Quezon Power Plant

Mauban, Quezon

RIGGING SUPERVISOR

Key Accountabilities and Responsibilities

Hauling of ESP materials and accessories

Erection of casing column and structure

Pre-assembly of hopper, collecting electrodes, discharge electrodes, inlet and outlet funnel, ducting from ESP (electro-static precipitator) to FGD (fuel gas duct), pre-assembly of ducting for IDF (induce duct fan)

Erection of roof beams, ducting for IDF, and Smoke stack

Installed slide bearing, casing structure and casing panel

Erection of collecting and discharge electrodes

May 01, 2017- June 15, 2017 HEEREMA MARINE CONTRACTORS

Gulf of Mexico, USA

RIGGER TEAM LEADER

Key Accountabilities and Responsibilities

Transporting and installation Stampede Platform TLP (Tendon Leg Platform)

Banking the crane during lifting operations

Preparations of corresponding rigging for the recovery of corrosion cover

Taking off all the towing lines

Setting of pulling lines during riser’s installations

Keep an eye on the support crane during TSB (Tendon Support Buoy) recovery

Assisting on Torque Winches during the pulling of Tendons

Securing the rigging of diver’s camera

Aug. 29, 2016-Dec. 25, 2016 SAIPEM INDONESIA

Karimun, Indonesia

RIGGER (pipe erector)

Key Accountabilities and Responsibilities

Installation/erection of Gas Turbine Generator

Proper sequence of erection of different columns, large platforms, channel, handrails, diagonal pipe bracings and gratings

Continuous erection of different types of valves and their support

Installation of clamps, pipe support and pipe shoe

Installing of large spool piece

Banking or signaling the crane

Aligning double ending pipe for welding

Participate in tool box talks and ensure all instructions from the supervisor are fully understood and responded promptly

Punch listing

May 2015 - Oct 2015 EMAS, AMC

USA/Germany

RIGGER

Key Accountabilities and Responsibilities

Operating carousel, deck winches and falfinger (crane)

Cable laying

Plan the route of the load and inform relevant personnel and surroundings of the move to minimize disruption to normal operations

Attend all relevant briefings prior to the job commencing and ensure all instructions are fully understood

During operations communicate accurate information to colleagues and Deck Foreman

Flow line recovery

Deployment of structure protection on the seabed

Deployment of concrete mattresses

Pipe and umbilical laying

Installing track way for the umbilical and A/C cables

Banking the crane

Assisting lay technicians and ship welder

Preparing all the accessories and equipment needed during laying and recovery operations

Maintaining or do some function test on the equipment on board before the operations

March 2009 – January 2015 SUBSEA 7 / ANGLO EASTERN

Makati City, Philippines/UK

AB/RIGGER

Key Accountabilities and Responsibilities

Assisting VLS technicians

Operating winches during spooling and pipe laying operations

Working together with the HLO during crew change as a helideck team member

Assisting on my foreman during spooling or reel walking for choking the pipe

Material handling and lifting

Preparing all the rigging needed for lifting

Installing pipe buoyancy and accessories

Loading/unloading, deploying of concrete mattresses, steel structure, PLEM, PLET, jumper, risers and flow lines.

Banking of the crane

May 2008 – December 2008 PETROMAR COMPANY ( GPS )

CHEVRON Project Cabinda, Angola

RIGGER FOREMAN

Key Accountabilities and Responsibilities

Preparing all the materials for hauling, erecting and laying

Participate in tool box talks and ensure all instructions from the Supervisor are fully understood and responded to promptly

Request suitable assistance from colleagues in a polite and courteous way without causing undue disruptions to normal work activities

Concrete pouring

Aligning double ending pipe for welding

Setting up pile driving equipment

July 12, 2007 – August 12, 2007 KIKEH FIELD DEVELOPMENT PROJECT

KIKEH FIELD, MALAYSIA

AB/RIGGER

Key Accountabilities and Responsibilities

Double check the rigging orientation of the rigid jumper before lifting by the rig crane

Loading all the necessary torque tools to the ROV basket before deploying it to the sub sea

Loading / offloading of all the materials needed before go on sailing

Making sure all the sea fastening is properly done

March 12, 2007 – April 21, 2007 HORIZON OFFSHORE COMPANY

STA. MARTA, COLUMBIA

PIPELINE RIGGER

Key Accountabilities and Responsibilities

Detecting holiday in the pipe

Wrapping of shrink sleeves to the welded joint of the pipe

Laying pipe in the roller

Assisting in the installation of the riser pipe

July 29, 2006 – Sept. 13, 2006 AMEC / V-PEOPLE ENERGY

BUZZARD PLATFORM

NORTH SEA, SCOTLAND

RIGGER FOREMAN

Key Accountabilities and Responsibilities

Participating in tool box safety meeting and securing all the work permit

Installing clamps and pipe support

Lowering vertical pipe column of the sea lift water pump

Hauling and rigging of valves on the lower level of production platform

Assisting pipe fitter’s on the installing spool piece

Piping erection

Material handling and lifting

Removing spool piece of the medium water pump for the inspection of each strainers

Writing report and performed other related job as assigned

Feb. 13, 2006 – Apr. 12, 2006 HEEREMA MARINE CONTRACTOR

Gulf of Mexico, USA

RIGGER TEAM LEADER

Key Accountabilities and Responsibilities

Setting up new rigging for the spool piece before transferring to the winch system number 9

Installing a set of sling to use to the winch system for the recovery of the pulling head connected to the riser

Assisting the Valkyrie personnel for the positioning of SCR vacuum system equipment including pumps with associated rigging and hose hook – up

Assisting in transferring and pull in of 10” steel catenary’s riser and associated with rigging and maintenance

Assisting the versabar winch operator for the 6” chain transfer and keel haul procedure /dummy flex joint transfer and riser abandonment procedure

Operating winch in the ROV skid for the lowering and positioning of the cursor frame in the pontoon

Assisting for the hooking up of the chain jack, chain locker and OCEANEERING dive trolley’s

Sept. 17, 2004 – Dec. 11, 2004 TORCH OFFSHORE INC

MARATHON OIL COMPANY

MALABO, EQUATORIAL GUINEA

RIGGER FOREMAN

Key Accountabilities and Responsibilities

Material handling and lifting

Pipe laying of PIP (pipe in pipe)

Put umbilical line to the pipe for submerging underwater

Putting insulation on both end of the pipe by painting the welded joint of primer

Installing fiber glass in the inside the PIP (pipe in pipe)

Installing half shell of PUF (polyurethane foam) in the inner pipe where the joint has been weld

Wrapping ROCS sleeve (shrink sleeve) around the area to be coated

Detecting holiday in pipe by using JEEP HOLIDAY DETECTOR

Assisting technician for terminating umbilical loading valves line through umbilical termination assembly

Assisting for submerging the condensate, butane and propane PLEM

Maintain good level of housekeeping on the loading or offloading area

Assisting divers for all the rigging related works

Rigging and assisting mechanics mounting heavy structures and oil rig/shipyard machineries

Cleaning, painting and greasing deck winches and crane

July 21, 1999 – Mar, 28, 2000 MDK International

MALABO, EQUATORIAL GUINEA

STEEL ERECTOR

Key Accountabilities and Responsibilities

Material expediting

Erecting different types of columns in each foundation

Assembling trusses or a supporting framework for a roof to support a structure

Erecting side beam, center girder, vertical bracing, side girth, horizontal bracing and installing sag rod

Assembling and installing fin fan cooler

Installing gratings in every platforms

Bolt tightening

Piping erection

Installing hand rails and ladders

Performed other related job as assigned, having a good leadership, writing report and a good knowledge of safety

June 05, 1991 – May 02, 1997 Gulf Marine Maintenance and Offshore

DUBAI, U.A.E.

Mechanical, Structural and Offshore Rigger

Key Accountabilities and Responsibilities

Material Handling and lifting

Rigging and assisting mechanics mounting heavy structures and oil rig/shipyard machineries

Removing, replacing large pieces or part of a ship

Capable of removing, replacing, re-installing and repositioning heat exchanger, turbo charger, panel boards and different type of valves and pumps

Assisting or tendering divers during salvage and clearing operation

Cleaning, painting and greasing deck winches and cranes

Capable of erecting scaffoldings and do some painting job

Inspecting of rigging tackles and equipment

Maintaining good level of housekeeping on loading or offloading area especially in the work site

Continuous rigging while on board the ship, platforms, dry docks, and ship repair facilities

Installing or erecting beams for horizontal and vertical construction

Erecting pressure vessel

Installing trusses or supporting framework or to support a structural for heavy iron fitting

Rigging an upright pole or other structure for carrying blower, turbines, panel boards etc.

Jan. 21, 1988 – Aug. 02, 1990 AL-SOULAH TRADING LTD

STATE OF KUWAIT

OFFSHORE RIGGER

Key Accountabilities and Responsibilities

Material handling and lifting

Rigging and assisting mechanics mounting heavy structures and oil rig/shipyard machineries

Maintain good level of housekeeping on the loading or offloading area

Knows perfectly the sign of communication with crane operator

Estimate the weight of the objects

Choose appropriate sling and other rigging equipment

Cleaning, painting and greasing deck winches and cranes

References

Available upon request.



Contact this candidate