Post Job Free
Sign in

Construction Plant

Location:
Austin, TX
Salary:
OPEN
Posted:
March 25, 2021

Contact this candidate

Resume:

David Mata

330-***-****

********@*****.***

***** ******* **.

Edinburg, TX 78542

SKILLS

Bilingual English/Spanish (read, write, speak, translate)

Microsoft words, Excel, Power Point

Lecture/Instructor LOTO Orientation

Follow instructions/procedure

Read and understand electrical one lines, P&ID

Maintain list of authorize personnel

Clarify questions related to LOTO procedure

Keep records and reports closed isolations, LOTO registration logbook

Maintain a Master List of authorize request

EXPERIENCE

05/2020 - Present LOTO COORDINATOR, Zachry industrial, inc. Gregory, TX

Working on a Polyester Plant performing LOTO for construction personnel

Keeping track of issue LOTO permits, close LOTO permits with logbook

Issue locks and tags for personnel along with issuing lock box, locks, and tags for field devices, to ensure proper isolation

Prior to start a walkdown is conduct with the supervisor and the tagging authority on systems to ensure all protective measures have been identified on the permit prior to authorizes work for safety of personnel and equipment

Work is completed verify the equipment or system are in safe configuration to restore

Working side by side with pre-commissioning and commissioning

Requesting and assigning PTW from commissioning to construction

08/2017 – 12/2019 LOTO COORDINATOR, Zachry industrial, inc. Freeport, TX

Working on a LNG Plant performing LOTO for construction personnel also commissioning

Keeping track of issue LOTO permits, close LOTO permits with logbook

Issue locks and tags for personnel along with issuing lock box, locks, and tags for field devices, to ensure proper isolation

Prior to start a walkdown is conduct with the supervisor and the tagging authority on systems to ensure all protective measures have been identified on the permit prior to authorizes work for safety of personnel and equipment

Work is completed verify the equipment or system are in safe configuration to restore

Working side by side with pre-commissioning and commissioning

Requesting and assigning PTW from commissioning to construction

02/2016 – 05/2017 LOTO COORDINATOR, Zachry industrial, inc. Granbury, TX

Working on a Combine Cycle Plant performing LOTO for construction personnel also commissioning

Keeping track of issue LOTO permits, close LOTO permits with logbook

Issue locks and tags for personnel along with issuing lock box, locks, and tags for field devices, to ensure proper isolation

Prior to start a walkdown is conduct with the supervisor and the tagging authority on systems to ensure all protective measures have been identified on the permit prior to authorizes work for safety of personnel and equipment

Work is completed verify the equipment or system are in safe configuration to restore

Working side by side with pre-commissioning and commissioning

Requesting and assigning PTW from commissioning to construction

EDUCATION

Graduated 05/2004 High School Diploma, J. Economedes High School- Edinburg, TX



Contact this candidate