PROFESSIONAL SYNOPSIS
Company Name : M/s. BLUEBIRD ELECTROMECHANICAL LLC, UAE.
Tenure : Oct – 2016 to October - 2020
Designation : Mechanical Engineer
Company Name : M/s. NEEL AUTO PVT. LTD. (TVS Plant 2) Tenure : April 2015 to September 2016
Designation : Quality Maintenance Engineer
• A Dynamic person with over 5 Years of Total Experience in Mechanical and Electromechanical
• Project Execution of Substation Projects.
• Gained Experience in Erection, Testing, Servicing & Maintenance of Transformers
• Presently working in M/s. BLUEBIRD ELECTROMECHANICAL LLC, UAE.
• Previously worked in M/s. NEEL AUTO PVT. LTD. (TVS Plant 2), India. RESPONSIBILITIES:
• Project Technical Assessment through site-visits and Client Interrogation.
• Working Cost – Benefit Analysis Framing Enquiry Offer
• Sequential Scope Scheming of the defined work
• Technical Plan of the Project (Men, Material and Procedures)
• Site – Performance Analysis
• After each project, Taking Feed-back from Client for finding their level of satisfaction
• Actively participated in DEWA, FEWA, SEWA, AADC, ADNOC & TRANSCO Projects
• Transformer Erection, Testing, Filtration Activity.
• Sub Station Buried Earthing & Cable Tray Installation Activity.
• Calibration Activity Under ISO17025 (Mechanical, Pressure & Flow) ACTIVELY PARTICIPATED IN THE FOLLOWING PROJECTS
CLIENT CONTACTOR PROJECTS JOB DETAILS
DEWA DANWAY
132/11 kV – Mira SS
132/11 kV – Shibahts SS
132/11 kV – Second Warsan SS
132/11 kV – Outlet Mall SS
132/11 kV – Terminal 2 SS
3 No’s of 50MVA Transformer, Reactor &
Earthing Transformer
(Erection, Filtration, Tan Delta
Measurement & SFRA Test)
UAE Govt.
Hospital
SITE
TECHNOLOGY
MEP Project, Dubai, UAQ & Ras Al
Khaimah
Generator Installation & Cable Laying,
Circuit Designing and Load & Cost
Management.
RESUME
E.GOWTHAM RAJ
Email ID : ************@*****.***
Mobile : 91-938*******
TRANSCO
SIEMENS
400/132 kV – Sadiyat SS
400/132 kV – Bahia SS
400/132 kV – Mahawi SS(Abu
Dhabi)
500 MVA Transformer and Shunt Reactor
- IBT Maintenance & Filtration
TRANSCO
STERLING &
WILSON
220/33 kV, SS Sweihan – Abu
Dhabi
(World Largest Solar Power Plant)
250MVA Transformer Erection & Oil
Filtration Activity
DEWA
ABB
132/11 kV, SS Business Bay
132/11 kV, SS Resort Village
132/11 kV, SS Cultural Village
132/11 kV, SS Al Nadha
132/11 kV, SS Arjan
132/11 kV, SS Majan
132/11 kV, SS Madeen
132/11 kV, SS Ras Al Khor
132/11 kV, SS Oxygen
132/11 kV, SS Green Hills
132/11 kV, SS Rawbah
132/11 kV, SS Dubai Hills
132/11 kV, SS Nad Al Hamar
132/11 kV, SS Doha Road
400/132 kV, SS MBR Solar
400/132 kV, SS Al Shams
Transformer Erection & Testing
(General & Special)
Transformer OLTC Inspection
Transformer Oil Filtration Activity
Earthing Grid Installation Activity
Grid Earth & Step and Touch
Measurement.
Capacitor Bank Installation.
132kV GIS & 11kV Maintenance.
DEWA
SIEMENS
132/11 kV, SS Nakhel Road
132/11 kV, SS Garden City
132/11 kV, SS Garden Tower
132/11 kV, SS Deira Island
132/11 kV, SS Deira Tower
132/11 kV, SS Deira Sahil
132/11 kV, SS Marina Harbour
132/11 kV, SS Seyahist
132/11 kV, SS Al Barsha
132/11 kV, SS Mobility
132/11 kV, SS Taweelah
132/11 kV, SS New Mushriff
132/11 kV, SS Mirdif
132/11 kV, SS Madinat-Al-Seha
400/132 kV, SS SRSGD
400/132 kV, SS Jebal Ali
Transformer Erection & Testing
(General & Special)
Transformer OLTC Inspection
Transformer Oil Filtration Activity
Earthing Grid Installation Activity
Grid Earth & Step and Touch
Measurement.
Capacitor Bank Installation.
132kV GIS & 11kV Maintenance.
SEWA
SIEMENS
132/11 kV, SS Abu Shagara
132/11 kV, SS University
Sharjah
Transformer Maintenance & Oil Filtration
Activity Up To 50MVA.
FEWA ABB 132/11kV Industrial Area 2 SS Transformer Maintenance & Filtration TRANSCO SIEMENS 132/11kV, SS Wasit Power Station Transformer Maintenance & Filtration TRANSCO SIEMENS 400/132kV, SS Yasmine Village-RAK Transformer Maintenance & Filtration STAR CEMENT -
20MVA Transformer Periodical
Maintenance ( Dubai, Sharjah & Ras Al
Khaimah)
Transformer OFS and Annual Maintenance
Activity.
EUROGULF
&
GLOBAL
TRANSFORMER
TRANSCO
/ADDC/SEWA
Factory Acceptance Test (FAT)
Transformer General & Special Testing (SFRA
& Tan delta)
AG
ENGINEERING
EMPOWER
Installation of Switchgear and
Transformer in Cooling Plant
Installation, Testing OF 11kV Switchgear
RESPONSIBILITIES:
• Transformer Erection, Oil Filtration & Testing.
• Arranging Manpower and Necessary Schedule, Reports Preparation, Clint Management.
• Preparation and Submittals of Daily Activities.
• Conduct HSE Safety Meetings.
ACADEMIC QUALIFICATION
• Bachelor of Engineering (BE) in Mechanical.
• Year of passing – 2015
ADITIONAL QUALIFICATION
• Rigging & Slinging Training Safety Course.
• Fire & Safety Course.
SKILLS
• Excellent interpersonal skills.
• Strong organizational skills.
• Motivational Speeches.
• Able to work at several projects simultaneously.
• Fast learning capability and good attention to detail. SOFTWARE SKILLS
• Have Basic Computer skills and CAD designing.
• Basic System Operator
• Working in All Kind of Management, System MS Office. PERSONAL DETAILS:-
FATHER’S NAME : R.ELUMALAI
DATE OF BIRTH : 09-09-1993
GENDER : Male
MARITAL STATUS : Single
NATIONALITY : Indian
RELIGION : Hindu
LANGUAGES KNOWN : Tamil, Hindi, English, Malayalam PASSPORT NUMBER : P3659777
PERMANENT ADDRESS : 10
th
North Street
Mahalakshmi Nagar,Palladam,
Thirupur - 641662, Tamil Nadu, India.
INTERNATIONAL VALID DRIVING LICENSE
DECLARATION
I consider myself familiar with Mechanical Engineering Aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge. Thanking you,
Yours Sincerely,
(Gowtham Raj. E)