JUSTIN HOBEN
PO BOX **** Gibbons, Alberta T*A *N* 780-***-****
adk37q@r.postjobfree.com
Job Objective: To obtain employment with a well-established company that offers challenging responsibilities and the potential for advancement. Summary of Qualifications:
Journeymen Red Seal Pipefitter
LSE (Leadership for Safety Excellence)
IRATA level 1
Hydrogen Sulfide (H2S Alive)
Construction Safety Training Systems (CSTS-09)
Elevated Work Platform
Worker Fall Protection
Confined Space Entry/Monitor
First Aid
WHMIS 2015
Work History:
Pipe Fitter, Tacten Industrial, Shell Scotford Fort Saskatchewan AB, Nov 2017-Mar 2020 Refinery Maintenance and shut downs
Nut Splitter/ Hydraulic torque equipment training and feild experiance Work inside vessels & furnaces fixing brackets supports and changing tubes Demo lines 2"-14' reinstall and bolt up.
Hand rigging valves and spools
Bolt up and torque manually and hydraulic.
Replace welded drain lines with threaded connections under platform’s Blind and deblind
Pipe Fitter, PCL Energy, Edmonton AB, April 2017-Oct 2017 New construction, Secondary Extraction Fort Hills Suncor Fabricate spools as per iso, Install and prepare for weld. Rigging and install spools 2”-24”
Install valves, bolt up and torque
Walk systems, lay out support elevations, install and prepare for weld. Hydro Testing Foreman, Phoenix industrial Inc. Edmonton AB, Oct 2016-March 2017 New construction, NWR Sturgeon Refinery
Test piping integrity, Pneumatic and Hydrostatic testing of systems Walking piping systems to put together material take offs. Equipment coordinating, permit receiving, submitting support requisitions Ensuring all test procedures are understood and followed Maintaining a safe work front for 13 man crew, coordinating with other craft Enforcing all safe work practices & reviewing JHA’S with crew in morning tool box talks Pipe Fitter, Worley Parsons Cord Teamco Ltd, Edmonton AB, Feb 2016-July 2016 New construction CNRL Froth treatment 2 & Pembina RFS 3 Hydro test and reinstate
Stage, set up, cut and fab spools from isometric drawings Rig and fly valves and pipe into rack set up for weld, bolt up and torque Clear construction punch list & deficiencies
Apprentice Pipe Fitter, Moreau Industries, Edmonton AB, Jan 2015-May 2015 New construction Cristina lake Conklin, AB
Rigging and signaling spools into pipe rack, fit for welding and bolt-up Reinstate lines, torque and clean up
Fabricate spools on site
Apprentice Pipe Fitter, Big Country Energy Services, Edmonton AB, June 2014-Sept2014 Full construction of pump station on 24” pipeline. Install numerous types of data recording instruments and valves ranging from 2 – 24” Hand torqueing, hydraulic over electric torqueing and pneumatic torqueing Assisting millwrights with pump strains following torqueing specs and understanding torque procedures.
Apprentice Pipe Fitter, URS (flint,) Redcliff AB, Jan19 2014-June 4 2014 Cut, prepare, reclaim pipe ends for butt welds 2-36”, bolt up and torqueing In field measure on site fabrication, tying into live lines. 2-4 point rigging lifts on spools 6-36”.
Hand rigging spools into position, support with hangers and fit to tack Isometric readings & lay out.
Education and Training:
Sept 2008
Nova Scotia Community College
Port Hawksbury, Nova Scotia
Completed one year of pipe/steam fitting trades training May-June 2015, Nov-Dec 2015, May-June 2016
Medicine Hat Collage
Medicine Hat, Alberta
Completed 1st,2nd and 3rd block Steam fitting Pipefitting technical training
June 2007
East Antigonish Education
Center/Academy
Monastery, Nova Scotia
Obtained High School Diploma
References:
Mattie Pye, Foreman, Phoenix .Ind,
adk37q@r.postjobfree.com
Steve Bage, Foremen, Tacten .Ind,
adk37q@r.postjobfree.com
Bruce Naugler, Mechanical Supervisor
Williams Energy Canada, 780-***-****
adk37q@r.postjobfree.com