Personal Background:
Age: **
Birthday: January *2th 1990
Nationality: Pakistani
Marital status: Single
Visa status: Employment visa
License: UAE driving license
OBJECTIVE:
A Highly Successful Land
Surveyor with over 9 years of
experience in managing all
land surveying
Activities and staffing;
responsible for ensuring best
practices are followed and
quality assurance goals
Are obtained; as well as
participate in development
of best practices as related to
land surveying.
AREAS OF EXPERTISE
• ROAD WORKS
• ALLINFRA STRUCTURE
WORKS
• TO POGRAPHY
• AS BUILT DRAWING S
Educational Qualification
Details:
• DAE (Civil)
Board of technical
Education Peshawar
Shahid Ali Amir Nawab
Dubai UAE
**********@*****.***
WORK EXPERIENCE:
Gulf Jewel Contracting LLC Dubai:(201a to 2020)
Project: proposed residential /commercial building G+3P+8typ Aljadaf Dubai UAE.
Client: M.r hussain hassan mirza muhammad al sayegh Consultant: Eng adnan saffarini Design.supervision & Consultant Position Held: Senior Land Surveyor.
Project:
Client:
proposed residential building G+2P+ 11 typ Dubai Land Dubai Msaab Mohammed Al zwaid
Consultant: Eng ad nan saffarini Design,supervison & Consultant Project: Residential building G+4 typ+RoofWadi Al safa2 Dubai Project:
Client:
Consultant:
Residential building G+5P+8 typ HC Aljadaf Dubai
Mr Ali Abdullah Muhammad al shirawi
Eng adnan saffarini Design.supervision & Consultant Khalif Al Fahad Contracting co LLC :(2016 to 201a1 Project: New building for Dewan ruler representative in western regien madinat zayed Abudhabi.
Employer:
Consultant:
Dewan Ruler Representative
Musanada
World planers Consultant Engineers
• Diploma in Information
Position Held: Senior Land Surveyor.
technology
Board of technical
Education Peshawar
• Diploma in survey
• Board of Technical
Education Peshawar
Horizon Boring Contracting:(2020 till now)
Position Held: Senior Land Surveyor.
1.Reviewed plans and specs during the pre-construction phase. 2. Surveyed and designed Horizontal Directional crossings with lengths ranging from 100' to 7100'.
3. Served as Navigator on these crossing utilizing wireline and walkover methods on rigs ranging from 36,000 lbs to 625,000 lbs and pipe sizes ranging from 2" to 36".
4. Created or reviewed all as-built drawings for completed projects. 5. Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues. 6.Determined the project schedule, which included the sequence of all construction activities.
7.Implemented systems to improve process efficiency and reduce the project duration.
8.Trained and promoted continued education for all onsite crew members. SKILLS
Responsible to solve survey
obstruction arise on the
project.
Supervision of survey team
and manage the survey
group.
Ensure that work is being
carried out as per quality and
safety
standards.
Preparation of survey
drawings.
Co-ordinate with sub
contractors and consultants
Computer Skill:
• MS Office(Word, Exell &
power point)
• Autocad 2016
• Internet Browsing
Language Skill:
• ARABIC
• ENGLISH
• URDU
EXPERTS IN SURVEYING
INSTRUMENT:
• LEICA GPS RED LINE
• LEICA GPS SYSTEM
1200
• TOTAL STATION
SOKKIA ex 701,610 &
520
• TOTAL STATION
NIKON DTM 352
• THEODOLITE,DIGITAL
& NON DIGIT AL
• ALL TYPES OF LEVEL
INSTRUMENTS
Code Contracting Co LLC Abu Dhabi (2013 to 201s1
Project: Design and Build of additional requirements at existing ruwais hospital Agreement number 7010 C1
Client: Abudhabi national Oil Company (ADNOC)
Consultant: Hill international Abudhabi
Position Held: Land Surveyor
Project: Out door play area ruwais agreement number 701 OC3 Client: Abudhabi national Oil Company (ADNOC)
Consultant: Dorseh Consultant Abudhabi
Position Held: Land Surveyor.
Project:
Client:
Recreation area ruwais agreement number 7018C4
Abudhabi national Oil Company (ADNOC)
Consultant: Dorseh Consultant Abudhabi
Position Held: Land Surveyor
Project: Dubai Military Accommodation
Position Held: Land Surveyor
Pakistan Enquiring Service Lahore Pakistan
Project: Thanda dame damage restoration khoat pakistan Position Held: Senior Land Surveyor.
Project: pali dame charsada pakistan
Position Held: Senior Land Surveyor.
Project: FORD Peshawar pakistan
Position Held: Senior Land Surveyor.
Experience Responsibility & Summaries:
Thorough knowledge of principles, practices and procedures of, topographic survey's boundary SJ\efo, legal descriptions and easement preparation. Superb problem solving skills related to land surveying activities Remarkable ability to: synthesize complex and divers information; collect and research data; use intuition and experience to complement data.; design work flows and procedures Solid personnel management experience, including technical evaluation of staff, conflict resolution skills, emotional composure and initiative Excellent communications skills in working with other capelins, clients and outside agencies.
Sound ability to develop strategies to achieve organizational goals; adapt strategy to changing conditions
Superb skills at Prioritizing and planning work activities; using time efficiently; setting goals and objectives;
organizing and scheduling other people and their tasks plans uncommon abilityto Meet productivity standards; complete work intimely manner; strive to increaseproductivity; and work quickly
Highlymindfulofsafetyandsecurityprocedures;Uses equipment andmaterials properly. P1an, coordinate and supervise the work of several field survey crews. Instructsurveycrewsinthefieldlayoutofthemoredifficultconstructionprojects,in replacing lost survey monuments, in setting property corners on city land from legal descriptionsand titleinformation,andinperformingotheraspectsofsurveywork Serve as the liaison between public utilities, contractors, and subcontractors during construction toprovidecontinuityin theassignmentofsurveycrews. Attend pre-construction conferences to convey information of contractors' intent to field crews andtheengineeringdesign,inspection, andmaterialssections.
Attend pre-construction conferences to convey information of contractors' intent to field crews and the engineering design, inspection, and materials sections Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects Review and analyses work methods to increase efficiency and productivity and provide input into the writing of performancestandards Koop detailed and accurate records of crew activities, survey data. Study operational problems and recommend changes.
Report on events and activities which may affect operations Review blueprints and legal deeds to survey areas in details Determine existing and proposed right-of-way. Oversee the measurement of completed construction work to determine "as-builds" quantities for the construction project, which are used in computing the cost of the project.
Work with contractors in providing survey data for expediting construction projects Layout& setting out of School building.
Footing,Slab,Door,Elevator,Windows,Stair,otherconcretestructure,Mechanicaland electrical Lay out.
Layout and setting out of vertical and horizontal alignment of concrete column Estab1ishment of control points and bench mark for fixed reference usingtotal station and automatic level
Down1oadedit and process of data usingsokkia software for as built drawing. All Roadwork’s. All Infrastructure Works
All Services, Pipe line works like storm water, Drainage pipe line, Water pipe line, Irrigation pipe line, All Cabling likeETISALATcable,power cable Etc.