RESUME
PERSONAL DETAILS
DIPLOMA IN CIVIL ENGINEER
NAME
ASISH GURIA, D.O.B-03.01.1990
FATHERS NAME
NANDA DULAL GURIA
ADDRESS
VILL-GAJPATIA,PO-ELLABONI,PS-KOTWALI, DIST-WEST MIDNAPORE,PIN-721102,STATE-WEST BENGAL, INDIAN
SEX
MALE
EMAIL ID
adjva6@r.postjobfree.com
MATERIALS STATUS
MARRIED
MOBILE NO
ACADEMIC QUALIFICATION:
EXAMINATION
SCHOOL
BOARD
%OF MARKS
YEAR OF PASSING
MADHYAMIK
CHANDRA HIGH SHOOL
W.B.B.S.C
51.50%
2007
HIGHER SECONDARY
CHANDRA HIGH SCHOOL
W.B.C.H.S.E
50.10%
2009
HIGHER SECONDARY (VOCATIONAL)
MIDNAPORE TOWN SCHOOL
W.B.S.C.V.E&T
72.83%
2012
TECHNICAL QULIFICATION:
DEGREE
COLLAGE
BOARD
%OF MARKS
YEAR OF PASSING
DIPLOMA IN CIVIL ENGINEERING(GOVT COLLAGE)
DR. MEGHNAD SAHA INSTITUTE OF TECHNOLOGY(HALDIA)
W.B.S.C.T.E
71.50%
2014
WORKING EXPERIENCE: ALL WORKING EXPERIEN IN RESIDENTIAL BUILDING PROJECTS
1.I HAVE PASS OUT OF DIPLOMA THEN WORKED UNDER ADS REALCON PVT .LTD EORM 2014 AS A SITE ENGINEER AT THEIR SITE PRUDENT PRANA,GORIA,BAGAR GHOLE. THE JOB RESPONSIBILITY WAS SITE SUPERVISION,PREPAIRING OF BBS,QUANTITY SURVEY,FOLLOWS STRUCTURAL&ARCHITECTURAL LAYOUT OF BUILDING STRUCTURE,PREPAIRING CLIENTS&CONTRCTOR’S BILL.
THEN WORKING UNDER GREEN CON CONSTRUCTION FROM OCTOBER(2015) AT THEIR SITE AS A ENGINEER&INCHARGE HAVING A SAME JOB RESPONSIBILITY WITH FINISHING JOB AT SITE UNDER 15 TH FEB (2018) (TILL NOW 4YEARS WORKING AT TWO NOS CONTRATOR FARM)GREEN CON CONSTRUCTION ARE AS FILLOWS SITE: a. PRUDENT PRANA (FOR THE TWO NOS OF G+7 BUILDINGS HAVING TOTAL COVERED AREA 90,000 sq.ft approx) b.EXPRESS DEVCON PVT.LTD AT 52/1 SITE SHAKESPEAR SARANI. A BUILDING WITH COMPOSITE STRUCTURE OF B+G+17 HA ING TOTAL COVERED AREA 1,70,000 sq.ft (approx) c. RIYA GREEN VALLY-GITANJALI AT BARASAT A RESIDENTIAL PROJECT OF 07 NOS OF G+4 HAVING TOTAL COVERED AREA 2,00,000sq.ft(approx) 2.THEN I HAVE ENGAJE APRIL (2018) WORK UNDER THE DEVELOPER FARM’SPOT LIGHT GROUP&ARRYAN GROUP’AS A THEIR PROJECT ENGINEER AT THEIR SITE PADMALYA PROJECTS LLP 70,SOUTH SINTHI ROAD DUMDUM THE JOB RESPONSIBILITY WAD TOTAL SITE EXEQUITION,SUPERVISION,PLANNING OF THE COTRCTOR WORK,&CHECK THE RA/BILL,BBS,QUANTITY CHECKING OF ALL ITEMS,RECONSILATION OF ALL MATERIALS.THOSE WORK ARE READY&HAND OVER THE PROJECT PROJECT ROAD WORK(STAMP CONCRETE ROAD),SWERGW TREATMENT PLANT,WATER TREATMENT PLANT,SWERGWLINING WORK OF TOTAL PROJECT,CHEK CIVIL ORIENT ALL FINISHING JOB.&PLUMBING WORK FOR THE 03 NOS OF B+G+7 HAVING TOTLA COVERED AREA 1,90,000 sq,ft AREA APPROX THIS SITE HAND OVER WITH ME TILL NOW JUNE (2020).
MY OBJECT IN LIFE:-
TO PERFORME WELL IN A CHALLENGING ENVIRONMRNT THAT OFFERS SCOPE FOR PERSONAL PROFESSIONAL GROWTH &IN THE PROGRESS TO SERVE BEST TO MY ORGANISATION.
DECLARATION:-
I DO HERE BY DECLARE THAT THE ABOVE MENTIONED INFORMATIONS ARE TRUE UP TO MY KNOWLEDGE I BEAR THE RESPONSIBILITY FOR THE CORRECTNESS OF ABOVE MENTIONED PARTICULARS.
Asish guria
DATE - SIGNATURE OF CANDIDATE