Personal Details:
Name : M.RAMESH KUMAR
E-mai: adjund@r.postjobfree.com
Tel: 91-988******* /
Permanent Address:
Minjur, Chennai-600021
Father name : R.Munusamy
Date of Birth : 26.04.1983
Gender : Male
Nationality : Indian
Current Salary: Rs.9 lacks/p.a.
Languages Known
English,Hindi,Telugu,Tamil
CURRICULUM VITAE
Executive Summary
A dynamic professional with over 17+ years of rich & cross cultural experience in civil site construction and management, quality and safety control management Currently associated with, P&C Project(p) Ltd as Construction Manager. Possess rich experience in handling projects pertaining to civil constructions like Marine jetty’s& Bulk liquid storage tank terminals,Oil&Gas Piping and pedestals ‘Buildings such as Residential, Industrial and Commercial buildings, Underground tunnels,bridges, Roads, Hard paving’s, Oil water separator, Effluent treatment plant, malty stored buildings and heavy equipment machinery foundations.
Key deliverables
Anchoring on-site construction activities as per the given plan and schedule to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
Designing and implementing stringent systems, detailed design and quality plans / manuals to ensure high quality standards during all the stages of project.
Certify and approve the quantity of contractor’s bill for payment.
Academic Profile
B-Tech (PT) in Civil Engineering secured 83% (First Class) in SRM University Chennai .Tamil Nadu.
Diploma in Civil Engineering secured 72 % (First Class) in CNT Polytechnic, Vepery,and Chennai.Tamil Nadu.
HSE – secured 73.5% TTV Higher Secondary School Chennai. Tamil Nadu.
Technical Skills
Computer proficiency: Auto CAD& MS-Office, Power point.
Professional Experience
1, Douglas OHI, Muscat, Oman.
1, Project: Liwa Plastic Industries Complex (LPIC) in Sohar, Oman.
Duration : July 2017 to August 2019.
Client &Cost : CB&I, CTCI, Called as CCJV, Main client ORPIC, Cost: 6.5 Billion USD
Nature of work : Steam cracking unit and polypropylene and polyethylene production unit.
Designation : Construction Manager
2, ETTPL, Oil & Gas Sector (Subsidiary of IMCL) (December 2007 to July 2017) Chennai.
Project-1: Marine liquid jetty and allied marine structure at insideEnnore port
Duration : 1.3Years (Dec 2007 to Mar2009)
Client &Cost : IMC Limited, Estimated Cost: 400Cr
Nature of work : Piling, Pre-casting, bollards, fender foundation, Pre-stressing, Grouting, Deck slab and erection of concrete structure.
Designation : Engineer
Project-2: Bulk Liquid Handling Terminal 2nd phase of ETTPL.
Duration : 1.75Years (Apr2009toJan2011)
Client &Cost : IMCLimited, Estimated Cost: 250 Cr
Nature of work : Tank foundation, Dyke wall, Fire wall, pump house, firefighting pumpsfoundation,Pipe racks and Weigh Bridge.
Designation : Engineer
Project-3: LPG Twin Transfers Pipe Line Portal legs, Underground tunnel.
Duration : 1.3Years (Feb2011toJune2012)
Client &Cost :Indian Oil PetronasPrivate Limited, Estimated Cost: 425 Cr
Nature of work: Portal legs up to 2.5 km, Tunnels 300m, Pipe and box culverts, Steel
Structural bridge fabrication and erection, loading arm foundation etc
Designation : Senior Engineer
Project-4: Propylene Oxide Handling Facilities.
Duration :1.3Years (July 2012toNov 2013)
Client &Cost :Manali petrochemical limited,Estimated Cost: 250 Cr
Nature of work : Tank foundation with bolts, Cooling tower, chiller unit plant, Machineries and high capacity pump foundation
Designation : Assistant Manager
Project-5 : ATF [Aviation Turbine Fuel Handling Facilities]
Duration : 1.5Years (Jan2014 to June2015)
Client &Cost : IOCL, IOSTL, Estimated Cost: 125cr
Nature of work :Storage tank foundation 7000kl capacity each, Pipe sleepers,QClab buildings, recovery tank and down grade tank foundation,FOUDI filtration& basket type strainer foundation, pig receiver area and sump
Project-6: Expansion of Pipe racks, Marine loading arm foundations on Jetty.
Duration : 1.5Years (July2015 to Jan2017)
Client &Cost :IOCL and BPCL,Estimated Cost: 150 Cr
Nature of work : Providing heavy foundation for marine loading arm and high capacity pump &DG foundations and Portal frame for elevated pipes
Designation : Assistant Manager
Responsibility:
Managing and Controlling the Quality’s and safety ofconstruction activities
Ensuring the work as per specification and quality as per Indian standard.
Manage the site on a day to day basis that includes supervising and monitoring the labor force and contract.
Inspection and interpretation of quality test result
Checking the construction material are being used according to specification.
Responsible to resolve the unexpected technical problem that may arise.
Responsible to plan and co-ordinate with the central purchase team for smooth and un-interrupted functioning of project site.
Co-ordination with the central design team for modification / changes in the project specifications based on the site condition.
Maintaining documentations and test result records. Reconciliation of material.
3. Rahul builder & Associates. October-2004 to October-2007
Projects: Apartments, Villas, Commercial and Industrial Buildings.
Nature of work: Construction of Residency, Apartments, Villas, Commercial and industrial buildings with different type of foundation such as simple foundation Pile foundation, raft foundation etc.
Designation : Engineer
Responsibility:
Executing the work as per approveddrawings andmethod of statements
Preparation of BBS & Quantity for the Structure.
Controlling quality and safety
Monthly preparation of Sub-contractor bill
Preparing daily, weekly and monthly schedule as per every month’s look ahead program in consultation with planning engineer.
Writing M book
4. CCCL (Consolidated Construction Consortium Limited) April-2003 to October-2004
Project : Pondicherry Medical College and Hostel
Client & Cost : Government of Pondicherry, Estimate Cost: 100 Cr
Nature of work : Class room building, library, Hostel, Canteen, Auditorium building and Roads
Designation: Junior engineer
Responsibility:
Executing and controlling quality of work.
Preparation of BBS and Quantity of the work
Preparation of weekly and daily program
Writing M book
Attending Customers Requirements
Preparing weekly bills for various contractors
Declaration: Hereby, I declare that the information and facts stated above are true to the best of my knowledge and belief.
Thank You
Your faith fully
Place: Chennai.
Date: /01/2021 M.Rameshkumar