Proposed role in the project: Engineer (Road, Bridge & Site Development Project)

1.Family name: BACALA

2.First names: ANTONIO A.

3.Date of birth: 03 November 1958

4.Nationality: Filipino Address: 295 Jose Velez St. Apovel Subdivision, Cagayan de Oro City, Philippines, 9000

5.Civil status: Married

6.Education:

Institution

Degree Obtained:

Cagayan de Oro College, Cagayan de Oro City, Philippines, 1978 - 1984

Associate in Geodetic Engineering

Cagayan de Oro College, Cagayan de Oro City, Philippines, 1978 - 1987

Bachelor of Science in Civil Engineering

7. Membership of professional bodies: Geodetic Engineers of the Philippines,

Registered Geodetic Engineer – PRC Reg. No. 0007928

8.Other skills: Microsoft Office, AutoCad Civil 3d, Total Station, Microsoft Project

9.Key qualifications:

Experience in Construction and Supervision Works of Road, Bridge & Site Development Projects:

1.Construction Management in implementing Road, Bridge and Land Development Projects.

2.Review contract documents and advise Resident Engineer if modification is needed.

3.Review Contractor’s work program and methodology of construction.

4.Supervise pre-construction survey of the project: Alignment, Profile and Cross Section surveys, Topographic Survey, Setting out, provision of Bench Marks, etc.

5.Supervise preparation of as-stake survey, actual construction drawings and quantity take off & volume calculation of Items involved in the project.

6.Prepare RROW drawings and Reports.

7.Supervise and implement the required methodology in actual construction such as in Earthworks (roadway excavation & embankment), installation of sewer lines, water pipes lines, preparation of sub grade, sub base & base course, construction of concrete drainage structure (RC Pipes, RC Box Culverts and Manholes), slope protection works, bar cutting & bending of steel bars, installation of steel bars, form works, road concreting using slip form concrete paver and road asphalting (laying of Binder & Wearing Course, Overlay & Patching), slope protection works, retaining walls, road signs & markings. And, constructions concrete office buildings and staff house.

8.Assist Materials Engineer in the preparation of Design Mix for different type of Concrete. Conduct the required material tests before and after completion of every item of work such as FDT, etc. conforming to the specification.

9.Prepare re-alignment if needed of Roads, Drainages and Water Lines including the Finished Levels and the Invert Levels.

10.Supervise Field Engineers and Surveyor in their daily field activities.

11.Prepare/Evaluate monthly and weekly schedule including catch up programme.

12.Assist Resident Engineer in the Contract Administration of the project.

13.Prepare/Check Cost Analysis and Unit Cost Estimates of items for BOQ preparation.

14.As Contractor, prepare the financial Budget, Cash Flow and Programme of work of the project.

15.Assist Preparation of Tender Documents for project bidding.

16.Prepare/Check Claims for Price Adjustment, Suspension Claim, Force Majeure incident and Time Extension Claim and Variation Order which all conforming to the Condition of Contract.

17.Coordinates / attend meeting with the Client and Contractor.

18.Prepare Technical Documents require during the construction.

19.Prepare/Check Monthly Payment Certificate submitted including back-up documents.

20.Assist in preparing As-stake Drawings.

21.Coordinate to the Superior the problems encountered in the field.

Experienced in Detailed Engineering Design Works for Road, Bridge & Site Development:

1.Supervise Horizontal, Vertical and Topographic Survey of the project.

2.Quantify and calculate the quantity of the items involve using the design drawings.

3.Assist preparing the BOQ and the Tender Documents.

4.Coordinate to the Highway Engineer, Drainage Engineer and Hydrologist the information and data they need in the field for design purposes.

5.Assist in preparing construction drawings such as; the Plan & Profile Plans, Cross-section Plans, and the Resettlement Action Plan.

6.Prepare the Unit cost Analysis and the Cost Estimates of the Items involve.

10. Employment Record:

Detailed Tasks Assigned :

Assignments and Project Descriptions

1.Review the contract documents of the project,

Contractor’s work program and construction methodology and advice TL/RE if modification is needed.

2.Review and check time to time accomplishment of the Contractor.

3.Supervise Contractor the preparation of the quantity take off and volume calculation of all the items involve.

4.Check construction drawings submitted by the Contractor prior for construction.

5.Check the monthly Interim Payment Certificate, variation orders, unit cost analysis, claims submitted by the Contractor.

6.Supervise Consultant Inspectors regarding the daily activities report they are preparing.

7.Collect everyday all communication documents submitted by the Contractor to the Consultant.

8.Monitor/Supervise the construction supervision activities in accordance with the conditions of contract, FIDIC and specification

9.Review all claims submitted by the Contractor and provide advice to the RE the validity of the claim, the effect of such claim on the construction schedule and the cost of the project.

10.Review and comments on the monthly progress reports submitted by the Contractor detailing the work undertaken during the previous month, the progress of the work against the approved schedule, the problems and difficulties encountered by the Contractor and other issues requested by the Employer;

11.Assist the RE in convening regular site meetings with Contractor to discuss issues and problems affecting the progress, and brief the Employer.

12.Assist RE in coordinating with the relevant local government authorities/agencies so as to minimize disruption to the works program, as required by the Contractor.

13.Assist in preparing the BOQ and the Tender Documents for bidding purposes.

March 2018 to March 2019 - Sierra Leone, Africa

Employer: Politecnica ingegneria ed Archetettura Soc. Coop. (Italy)

Name of assignment or project: Construction Supervision for the Reconstruction / Rehabilitation of Moyamba Junction Road and Bridges.

Main project features:

The project consists of earth moving, sub-base and crush aggregate base, 32.8 kms. 2- lane Concrete Asphalt Road, construction of new Two (2) Steel Type Girder Bridge (2-span each), 25 lines of Reinforced Concrete box culverts (different sizes) & 35 lines of RC pipes culverts (different sizes) for the cross drainages, ditch and concrete side drain canal with a total length of 37,000 meters, slope protection works (grouted riprap and retaining walls) and construction of open & covered concrete canal up to the outfall with a total length of 1,300 meters.

Position: Sr. Quantity Surveyor / Survey Engineer

Client: Sierra Leone Roads Authority

Financing: European Union

17 June 2017 to 03 July 2017 - Narobi, Kenya

Employer: SUEZ Consulting (Safege) - France

Short term Technical Assistant of the evaluation of 14 contractual claims for the project Nairobi Missing Link Roads and Non-Motorized Transport Facilities. This consists for the calculation of Time Extension, Price Adjustment and Additional Cost of the claims submitted by the Contractor.

Position: Quantity Surveyor

Client: Kenya Urban Roads Authority

Financing: European Union

January 2017 to June 2017 - Philippines

Leohland Realty and Development Corporation (Philippines)

Design Review and Construction Supervision of Monte Cielo Heights Subdivision Phase 1 (17 Hectares).

The project Consist of the following:

Massive earthworks for cut and fill and site grading. Construction of 4 kms PCCP for road nets, sub-base & base coarse, kerb & gutter, concrete sidewalk, 3000 meters pipe culvert in different size, 2 stone masonry outfalls canal with a total length of 700 meters, concrete retaining walls, 1- RCBC, stone masonry retaining walls, and installation of main water pipes and distribution lines pipes.

Position: Project Engineer

Owner: Leohland Realty and Development Corporation

July 2011 to Aug 2015 Mozambique, Africa

Employer: Egis International (France

Design Review and Construction Supervision of the Rehabilitation of N14 Road Between Marrupa and Ruaca in Niassa Province (68 kms.) – Lot B

The project construction consists of the following:

Massive earthworks for cut and fill, provision of ditch and concrete side drain canal along the road with a total length 21,000 meters, provision and replacement of 110 lines of reinforced concrete pipe culverts & 5 double reinforced concrete box culverts for cross drain, catch basin box, slope protection works, construction of 3unit- Pre Stress Girder Type Bridges (3 span each, 19.61m span), cement treated sub-base and base course, road signs & road markings and DBST Asphalt Pavement. And, Construction of 2 concrete office & laboratory buildings and 7 concrete staff houses.

Position: Sr. Quantity Surveyor

Client: Mozambique Ministry of Public Works (ANE)

Financing: Swedish International Development Agency (SIDA)

June 2009 to June 2011 Liberia, Africa

Employer: Egis International (France)

Construction Supervision of Cotton Tree - Bokay’s Town - Firestone Camp 1 Road Project 25 kms length. Under Design, Built, and Transfer (DBT) Strategy

The project construction consists of the following:

Construction of one (1) concrete office building and seven (7) concrete staff houses. Removal of existing asphalt pavement & base course, construction of new asphalt binder & asphalt wearing course pavement, pavement patching, asphalt pavement overlay, crack sealing, construction of ditch canal & concrete side drain canal along the road with a total length of 6,500 meters, 3 RC box culverts & 36 lines of RC pipe culverts for the cross drain, construction of concrete covered & open canals up to the outfall with a total length of 1, 700 meters, earthworks (cut & fill), crushed aggregate base & sub-base, repair of existing concrete bridges, slope protection works, road signs and construction of one (1) new RCDG bridge (21m).

Position: Sr. Quantity Surveyor / Measurement Engineer

Client: Liberia Ministry of Public Works

Financing: World Bank

Feb 2008 to May 2009 Liberia, Africa

Egis International (France)

Construction Supervision for the Rehabilitation of Monrovia City Roads - Buchanan Road Project (81. Kms.).

Monrovia City Road Project 19 kms:

Construction of 1-concrete 2 story office building for PMO Office and 7- concrete staff houses. Removal of existing asphalt pavement & base course, construction of new Four (4)-lane concrete asphalt, sub base & base course, pavement patching, asphalt pavement overlay, crack sealing, construction of new RC box culverts & RC pipe culverts (different sizes) for the drainage system of the City up to the out fall with a total length of 2,850 meters including the concrete covered & open canals, cleaning & repair of existing canals and channels. Road Signs & Markings.

Monrovia - Buchanan National Road Project 62 kms:

Pavement patching, asphalt road overlay, crushed aggregate base & sub-base, provision of ditches, trapezoidal side drain concrete canals along the road with a total length of 13, 500 meters, provision of 76 lines of RC pipe culverts for the cross drain, repair of existing concrete bridges, slope protection works, road signs and construction of one (1) new RCDG bridge (21m).

Position: Quantity Surveyor / Measurement Engineer

Client: Liberia Ministry of Public Works

Financing: World Bank

Feb. 2006 to Dec. 2007 Qatar

Employer: Gulf Engineering and Industrial Consultancy (Qatar)

Construction Supervision of West Bay District Project Zone 68, Urban Area Development.

The project consists of the construction of the following: asphalt road nets with a total of 27 kms which includes base & sub base course, sewer and surface water drainage system (G.I metal pipes, concrete open canals and RC box culverts, Junction & Drop Manhole Box with a total length of 6,500 meters), water system, one (1) pumping station with capacity of 5cu.m./sec., telecommunication & electrical lines, street lightings and road signs & markings.

Position: Sr. Highway Surveyor / Quantity Surveyor

Client: Public Works Authority – ASHGHAL

Financing: Qatar Government

July 2004 to Jan 2006 PHILIPPINES

Employer: RD Policarpio Construction, Inc. (Philippines)

Construction of Licomo – Quinipot Road Section

The project consists of the following: construction of Portland Cement Concrete Pavement (42 kms.) located at Zambonga City, Philippines including the provision of 7 lines of RC box culverts (all double barrel) & 125 lines of RC pipe culverts (different sizes) as cross drain, retaining walls, provision of ditch canals & trapezoidal concrete canals along the road with a total length of 15,000 meters, earth moving, grouted riprap slope protection works, road signs concrete office building and concrete staff houses.

Position: Quantity Engineer / Cost Engineer

Client: Department of Public Works and Highways

Financing: Asian Development Bank (ADB)

Feb. 2004 To June 2004 PHILIPPINES

Employer: Techniks Group Inc. (Philippines)

Detailed Engineering Works of SM - Bulua Road Project 20 Kms. Road at Cagayan de Oro City, Philippines.

The project is a detail engineering works and preparation of Tender Documents for the construction 20 kms., concrete pavements, 2unit- Pre Stress Type Girder Bridge, 25 new lines of Reinforced Concrete Pipe Culverts & 2 new Reinforced Box Culverts for the cross drain and Ditch, Open & Covered Concrete Canals with a total of 9,500 meters, road markings and road signs.

Position: Geodetic Engineer

Client: Department of Public Works and Highways

Financing: Japan Bank International Corp. (JBIC)

Dec 2001 to Dec 2003 PHILIPPINES

Employer: Nippon Koei International Consultant Jv Phil Koei International, Inc.(Philippines)

Construction Supervision of Mawii - Halapitan Road Project (12 Kms.)

The project consists of Earthworks, Road Graveling, Provision of 2 lines of RC box culverts & 13 lines of RC pipe culverts (different sizes) as cross drain, sub-base & base course, construction of ditch & open concrete canals along the road with a total length of 5,000 meters, construction of open and covered concrete canals up to the outfall with a total of 1,700 meters, grouted riprap slope protect protection works, construction one (1) RCDG bridge 31m.

Position: Site Engineer / Quantity Engineer

Client: Department of Environment and natural Resources

Financing: Japan Bank International Corporation (JBIC)

Jan. 2001 to Nov. 2001 PHILIPPINES

Employer: PERT CONSULT INTERNATIONAL, INC. (Philippines)

Construction Supervision of Crossing Libona Silip-on Road Project (11.6 kms)

The project consists of the following: Construction of Asphalt concrete road which includes earthworks(embankment & excavation), road sub-base and base course, provision of 35 lines of RC Pipe (different sizes) & 3 lines of RC box culverts, slope protection works and ditch & concrete open canals with a total length of 3,500 meters.

Position: Survey Engineer / Quantity Engineer

Client: Provincial Government of Bukidnon, Philippines

Financing: Asian Development Bank (ADB)

Mar. 2000 to Dec. 2000 PHILIPPINES

Employer: NIPPON Engineering Consultant JV with CCC Consultant (Philippines

Detailed Engineering Works of Bongabon-Baler Road Project (80 kms.)

The project is a detail engineering works and preparation of Tender Documents for the construction 80 kms concrete pavements, 6 RCDG bridges, replacement & new RC pipe culverts and RC box culverts, construction of concrete canals and roadway side slope protection.

Position: Survey Engineer / Quantity Engineer

Client: Department of Works and Highways

Financing: Japan Bank International Corp. (JBIC)

Mar. 1998 to Mar. 2000 PHILIPPINES

Employer: NIPPON Engineering Consultant JV with CCC Consultant (Philippines)

Construction Supervision of Baybay - Bato Road Project (54 kms) located in Leyte Province, Philippines.

The project consist of the following: construction of sub-base & crushed aggregate base, concrete pavement, 6unit- RCDG Bridge (1 span each), 6unit- Post Tensioning Girder Type Bridge (2- span each), Concrete Pile & H- Pile driving, Metal sheet driving for Coffer Dam,3 Box Culverts, 20 lines of RC Pipe culverts, concrete side canal with a total length of 2,300 m and slope protection works. Road signs and Markings.

Position: Cost / Quantity Engineer

Client: Department of Public Works and Highways

Financing: Japan Bank International Corp. (JBIC)

Oct. 1997 to Feb. 1998 KUALA LUMPUR, MALAYSIA

Emploer: Gamuda Berhad Inc.

Construction of 3 interchanges under Western Traffic Diversion System (WTDS), Kuala Lumpur

Position: Survey Engineer

Client: Ministry of Public Works

Financing: Malaysian National Government

April 1995 to Oct. 1997 PHILIPPINES

Employer: BCEOM (new name for Egis International)

Construction Supervision of the Restoration of Cebu City North Rd Proj 100kms

The project consist of earth moving, sub-base and crush aggregate base, 23 kms. Four (4) lane concrete pavement & 77 kms. 2- lane road concrete asphalt, construction of new 2 concrete bridges, 25 lines of RC box culverts (different sizes) & 377 lines of RC pipes culverts (different sizes) for the cross drain, ditch and concrete side drain canal with a total length of 37,000 meters, slope protection works (grouted riprap and retaining walls) and construction of open & covered concrete canal up to the outfall with a total length of 4,300 meters.

Position: Survey / Highway Engineer

Client: Department of Public Works and Highways

Financing: IBRD

April 1994 to Mar 1995 PHILIPPINES

Employer: A Brown Co.

Construction Supervision of Xavier Estate Land Area Development Project, Phase 1, with an area of 31 hectares.

The Project is located adjacent to the commercial area of Cagayan de Oro City, Philippines. It consists the following: Site Grading, construction of 200mm Concrete Pavement Road, Water System, Sewer & Drainage System which includes installation of Reinforced Concrete Pipe Culverts, Reinforced Box Culverts and Open & Covered Concrete Canals with a total of 4,200 m.

Position: Survey Engineer / Site Engineer

Client: A Brown Co., Inc.

Financing: Client’s Project Fund

May 1992 to Mar 1994 PHILIPPINES

Employer: Louis Berger International, Inc.

Construction Supervision of Tubay - Jabonga Road (12,5 km) Project

The project consist of earth moving, sub-base and crush aggregate base, road concreting & road asphalting, construction of new 1 RCDG bridge, 23 lines of RC pipes culverts, RC box culverts, concrete side canal with a total length of 3,800 meters and slope protection works (grouted riprap and retaining walls).

Position: Quantity Engineer / Cost Engineer

Client: Department Of Public Works and Highways

Financing: USAID

Sept 1991 to May 1992 KINGDOM OF SAUDI ARABIA

Rashid Geotechnical & Material Engineers

As-Built Survey Works of King Abdullaziz University Compound located at Jeddah, Saudi Arabia

The project consists of the As-built Survey of King Abdullaziz University compound with an area of 250 hectares. Provision of horizontal and vertical controls. Indentify location of all structures, road nets, drainage system, water system, electrical system and other underground utilities.

Position: Geodetic Engineer

Client: King Abdullaziz University

Oct. 1990 to Sept. 1991 PHILIPPINES

Employer: Philipp’s Technical Consultants, Inc.

Construction Supervision of Libungan-Kitub-Binisilan Road Project with a total length of 21 kms

The project consists of Portland Cement Concrete Pavement (PCCP), 2 RCDG Bridges, 50 lines of Reinforced Concrete Pipe Culverts & 10 lines of Reinforced Concrete Box Culverts for cross drain, earthworks, sub-base & base course, provision concrete & ditch, lined ditch and concrete side drain canals with a total length of 7,000 meters, construction of open & covered concrete canals up to the outfall with a total length of 2, 300 meters, slope protection & retaining walls and road signs.

Position: Survey Engineer / Quantity Engineer

Client: Department of Public Works and Highways

Financing: World Bank

Sept. 1989 to Oct. 1990 PHILIPPINES

Employer: FEMCO Construction Inc.

Construction of Bagong Tapay-Tacurong-Marvel Road Project (40 kms.)

The project consists of construction of Concrete Asphalt Pavement, 3 RCDG Bridges, 75 lines of Reinforced Concrete Pipe Culverts(different sizes) & 10 lines of Reinforced Concrete Box Culverts for cross drain, earthworks, sub-base & base course, concrete & lined canals for side drain with a total length of 5,500 meters, slope protection & retaining walls, road signs and road markings.

Position: Survey Engineer / Field Engineer

Client: Department of Public Works and Highways

Financing: Asian Development Bank (ADB)

Certification :

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes me, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Antonio A. BACALA Date: December 2020

+639********* Signature

adjttn@r.postjobfree.com