CURRICULAR VITAE
SAMIR KAMAL ( adjtr1@r.postjobfree.com -600-***-****)
Senior Engineer ( Electrical In charge of Dept. & Township) PERSONAL SUMMARY
A competent Project Site Manager & Operation cum Maintenance In-charge with adequate communication, organisatio n and co-ordination skills. Possessing a proven track record of preparing and executing project plans & programmes, ens uring that work is carried out in accordance with the companies procedures and clients satisfaction. Able to ensure timely
, safe and cost effective design and implementation during the life cycle of projects from conception till customer satisfac tion.
Currently looking for a suitable Project Site Manager or Operation cum Maintenance Manager with a forward thi nking employer.
WORK EXPERIENCE
Total Work Experience :- 9 years, 5 months.
Present Employee ( 20.11.2017 to till date) :-
Mawmluh Cherra Cement Ltd, Sohra, Meghalaya-793108
( Meghalaya Gov. undertaking)
Responsibility :- Looking after the operation & maintenance of all switchgears as well as the old plant incl uding the two 33 kv switchyards & responsible for attending any breakdown associated with electrical switc hgears of the old & new plants and also to look after the lighting system in factory, mining, colony & respon sible for overall smooth running of the electrical Department. Former Employee:
LARSEN & TOUBRO LTD.
ELECTRICAL & AUTOMATION
ELECTRICAL BUSINESS GROUP, GHANSOLI, NAVI MUMBAI.
Web:- www.Lntebg.com
Industrial Automation Training Experience - 3 months (May'2011 to August'11) Total Work Experience - 6 Years, 2 Month .
Site Designation - Commissioning leader Cum Manager. Official Designation - Senior Erection & Commissioning Engr. Working in Larsen & Toubro ltd, Electrical & Automation Division on contract basis through Company MOGU ENGINEER’ s, Jaipur (from 20.08.11 to 28.07.14) & MONALISA EDC PVT. LTD, BANDRA,MUMBAI( From 01.08.14 to 03.11.17) & ha ndled various Drive Panel based & EPC Project based sites in India which are mentioned belows:- Variable Frequency Drives based sites( 20.08.11 to 14.09.12):- SN. APPLICATION COMPANY/ ORGANISATION NAME
1 Cooler Fan/ Blower
Fan.
(Commissioning)
a) Ultratech cement, Rajula. b) Birla cement, Chittorgarh. c) Vizag Steel plant, vishakapatnam. d) Ultratech cement ltd. Ariyalur. e) Huntsman textile ltd. Vadodra. f) Indian Oil Corporation Ltd. Mathura. g) Birla Sh akti cement Ltd, sedam. h) Adani Power Ltd, Mundra I) Manglore Refrinary & Pertrochemical Ltd, Mang lore j) Coromandal Fertiliser Ltd, kakinada
2 ID Fan.
(Troubleshooting)
a) Bajaj Industrial Development & corporation-
I) Lakhimpur, Uttar Pradesh.
ii) Maksoodpur, Uttar Pradesh.
3 Crane/ Conveyor
(Troubleshooting)
a) L&T Steel & Forging Ltd, hazira. b) Adani Power & Pertronet Ltd, Dahej 4 Standby mode.
(Commissioning)
a) Ultratech Cement Ltd, awarpur
5 PUMP(commissionin
g)
a) Hindustan Petrochemical Corporation Ltd, Bahadurgarh Project based sites ( From 15.09.12 to 03.11.2017) SN PROJECT TYPE/COMPANY NAME WORK DESCRIPTION
WORKING DURATION & SITE DE
SIGNATION
1 JAIPRAKASH ASSOCIATES LTD.(COAL/CLINKER
HANDLING PROJECT)
a)Erection & commissioning of all safety instruments for 9 conveyor systems( i.e Belt sway, pull-chord, zero spee d switch, Hooters & Chute block switch)
b) Testing & Commissioning of all conveyors motors ( t otal of 9 Induction motor).
c) Commissioning of MCC panels( 3 Nos), Rod gates(12 nos.)
d) IO Testing of all protection interlocks.
15.09.12 to 19.01.13
(E & I Erection & commission
ing Engr.)
2 ADANI POWER DAHEJ LTD,GUJRAT.(COAL
HANDLING PROJECT)
a)Erection & commissioning of all safety instruments for 7 conveyors systems ( i.e Belt sway, pull-chord, zero sp eed switch, Hooters, Chute block switch, Belt tear switch es, Vibration transmitters & beltwatch panels)
b) IO Testing of all protection interlocks.
c)Submission of project related documents, final bi lls & reconcilation report .
22.01.13 to 27.09.13
(E & I Erection & commissioning
Engr. Cum Site Mnager)
. (Project handover on 17.01.
2014)
3 INDIABULLS POWER LTD. SINNAR,
MAHARASTRA
(POWER PLANT)
a) IO testing for MCC Feeders- 125Nos., HT Panels - 18 Nos., DCDB panels & UPS Sustem -2 Nos each & field in struments protection interlocks
b) Commissioning of Sump Motor panel(2Nos)
30.09.13 to 18.11.13
(E & I commissioning Engr.)
4 RELIANCE SOLAR CONCENTRATED THERMAL
POWER PROJECT, POKRAN,
RAJASHTAN
a) IO Testing of all MCC Panels, HT Panels, & fiel d instruments protection interlocks.
B) Networking of all DCS Network.
C) Testing of 30 MOV's( Mot
orized operating Valave)
21.11.13 to 05.01.14
(E & I commissioning Engr.)
5
ORISSA CEMENT LTD,MEDINAPUR,
WESTBENGAL.
(CEMENT GRINDING UNIT)
a) All Low voltage Motors testing & commissioning fo r Phase-1 ( Total of 270 no’s motors required to be com missioned for areas as Clinker silo, hopper, cement buildi ng, coal mill, cement mill bag house & Packing plant) b) Programming of all IMCC Panels Programmable Relay (32 5 nos)
c)To give necessary guidance to Instrument Engin
eers for Instruments erection & commissioning &
making of testing protocols
d) Commissioning of 9 Industrial Drive Panels .
e) Testing of MCC' s DOL, RDOL & STAR/ DELT
A Feeders.
f) Networking of all DCS Network
03.02.14 to 28.07.14
(E & I commissioning Engr. Cum l
eader)
SN
PROJECT TYPE/COMPANY NAME
WORK DESCRIPTION
WORKING DURATION &
SITE DESIGNATION
6 DALMIA CEMENT BHARAT LTD, MUDHOL,
KARNATKA
(CEMENT PLANT-4500 TPD)
a) All electrical as well as instrumentation for area Coal m ill & Blending silo erection activities need to be complete d within defined client completion period .( I.e 85km cable laying & 315 Nos instruments erection within 90 working days).
b) To give all possible supports to other engineers related with Electrical & Instrument wiring network for smooth c ommissioning.
c) Submission of RA Bills as on time with erection protoco ls.
d) Commissioning of all AC VFD drives (I.e 17 Nos). 01.08.14 to 12.10.14
Electrical & Instrumenta
tion Erection Engr. cum
VFD Engineer
KEY SKILLS AND COMPETENCIES
Extensive experience of planning, project management, design & client liaison. Experience of interpreting specifications and preparing technical proposals. Ability to multi-task in a demanding engineering environment. A strong track record in delivering projects on time and within budget
. Resolving complex technical issues and coming up with fast efficient solutions. Ability to assess the financial feasibility and impact of propose d budget items and also alternative.
ACADEMIC QUALIFICATIONS
BACHELOR OF ENGINEERING FROM:- ELECTRICAL & ELECTRONICS ENGINEERING(YEAR:2007-11) COURSE SCHOOL\COLLEGE YEAR OF PERCENTAGE
\ UNIVERSITY PASSING
B.E VINAYAKA MISSIONS 2007-11 73
UNIVERSITY
10th MRS.K.M.P.M.HIGH SCHOOL 2004 60.6
JAMSHEDPUR
12th MRS.K.M.P.M.INTER COLLEGE 2006 57.2
ACHEIVMENTS
Management allotted to complete all project works related with erection / commissioning, all RA bill submission/transaction clearance, completion of al l punch jobs highlighted by client & handover of project/closure of contract are as follows:- a) ADANI POWER DAHEJ LTD, GUJRAT (COAL HANDLING PROJECT) - Closed from site on 17.01.2014. b) MUMWLUH CHERRA CEMENT LTD. CHERRAPUNJI, MEGHALAYA ( DRY PROCESS CLINKER PROJECT) - Closed from site on 29
.12.2015 & commercial closed on 15.01.2016.
. AREAS OF EXPERTISE
Project management
Project execution planning
7 MUWMLUH CHERRA CEMENT LTD,
CHERRAPUNJI,
MEGHALAYA
(CEMENT PLANT-600TPD)
a) Erection & Commissioning of all instruments.(Approx 4 45 total instruments in plant)
b) Calibration of all Process Instruments (Example- Press ure/Tempreture Transmitter, Level switches, Zero speed switches, Bag filter Panels etc...)
c) Areawise job completion Planning & Weekly Progress R eport Submission .
d) Readiness of PLC Networking.
e) Planning of Vendor's visits.
f) Process Interlocks IO Testing.
g) Commissioning of All Ac Variable frequency Drives. h) Submission of erection & commissioning protocols as w ell as submission of RA bills too.
18.10.14 to 31.12.2015.
Electrical & Instrumenta
tion Erection & Commis
sioning Engr. cum Site L
eader. (Project handover
on 29.12.2015)
8
ULTRATECH CEMENT GRINDING UNIT,PAT
NA
a) To plan Plant C&I Erection as well as commissioning ac tivities.
b) To update Project Control, Power & Instrumentation w orks on tracker daily basis.
c) To supervise all Control & Instrumentation Erection as well Commissioning works.
22.01.2016 to 30.04.16.
C&I Planning cum Super
vision Head.
9
BOKARO STEEL LIMITED (SAIL), JHARKHA
ND
a) To ensure erection & commissioning works For all supp lied system.
b) To clear all contractor & L&T bills .
c) To update site progress Reports.
d) To plan & submit new RA bills .
e) To Plan Vendor's visits
f) To Plan Plant commissioning Schedule.
g) To complete all possible pending technical/Non technic al jobs related with Project
Site Designation- Site Mana
ger.
03.05.2016 to 03.11.2017
Expertise in Low Voltage Drives (YASKAWA, ABB, DELTA, DANFOSS, AMTECH ) commissioning. 2D ECAD
Expertise in Electrical system Maintenance planning Expertise in Electrical system for Cement Plant.