Post Job Free

Resume

Sign in

Engineer Project

Location:
H-10, Islamabad Capital Territory, Pakistan
Salary:
50000
Posted:
January 30, 2021

Contact this candidate

Resume:

Rehmat Ali

Address: House # **, Street # *, Block A, New City Phase 2, Wahcantt

Mobile: +92-346-******* +92-321-*******

Email: adjte2@r.postjobfree.com

Email: adjte2@r.postjobfree.com

Passport # VV1803952

Professional Profile

A Graduate in BS (HONS) Geology offering broad academic understanding and skills in areas including engineering materials, fluid soil mechanics and borehole logs for piles, mud logging. Proficient in systems including MS Office, Civil Land & Draftsman, Auto Cad and possess relevant experience with organisations including Rustum Associates & Dynamic Constructors, Mud Logger at Shanghai Shenkai Petroleum of Science and Technology Islamabad and GWS Department, OGDCL Islamabad. Hold demonstrable skills in material testing, job mix formula, concrete mix design and take a keen interest in supporting the development of peers and students in the sector.

Education & Professional Development

BS (HONS) in Geology (1st Division)

University of Azad Jammu and Kashmir Muzaffarabad, Pakistan 2008 – 2012

Dissertation / Project:

Structure and Stratigraphy of Dheri Qasim, Bela Bhadarsha, Pipli, Nalamuslamanan, Doberan, and Khad Areas of Azad Jummu & Kashmir Pakistan.

Professional Experience

Sep 2017 – Oct 2019 Material Engineer

Rustum Associates and Dynamic Constructors

Key Projects:

1. Project: Post Flood National Highways Rehabilitation Project (PNHRP)

Package 3 Rehabilitation of National Highways & Bridges (Naran – Jalkhad) N-15.

Type of Project: Construction of Bridge, Road & Structures

Client: National Highway Authority

Cost PKR 1192 Million

Asian Development Bank

2. Project: Flood Emergency Reconstruction & Resilience Project (FERRP)

Package AK-CW-02 Reconstruction of Hajira – Abbaspur Road, Kashmir.

Type of Project: Construction of Roads & Structure

Client: Communication Works Department

Cost PKR 647 Million

Asian Development Bank

3. Project: Flood Emergency Reconstruction & Resilience Project (FERRP)

Type of Project: Construction of Daska – Pasrur Road

Client: Communication Works Department

Cost: 2014 Million

Asian Development Bank

Scope of work

Structural:- Causeways, Box culverts, Pipe culverts, Slab culverts, Retaining Walls, Breast Walls

Embankment layers, Subgrade layers aggregate base course layer

Asphalt Base Course, Asphalt Wearing Course

Pilling, Pier, Transom, Abutments

Expansion joints, Approach slabs

Key Responsibilities:

Responsible for Testing of Material

Responsible for making Concrete Mix Design according to the specification

Responsible for Job Mix Design

Checking of concrete mix ratio at the batching plant

Checking the mix design of asphalt at the plant

supervising the milling and asphalt laying at site

Assisting in the leadership of subsequent testing and undertaking periodic and ad-hoc inspections at site for quality control.

Health and Safety Course:

NEBOSH International General Certificate In Occupational Health and Safety.

Learning Partner: 1216 - SAFETY STANDARDS CONSULTANTS

ISLAMABAD, PAKISTAN.

June 2014 – June 2017 Trainee Mud Logger Shanghai Shenkai Petroleum of Science and Technology Islamabad

Key Responsibilities:

Real time monitoring of drilling activity onsite, recording lithology and hydrocarbon shows/gas, contributing to maintain a safe working environment on the rig by interpreting the data at hand and giving feedback to the well site geologist/drilling team/company man,

Using the tools to predict potentially dangerous situations such as kicks or the detection of gas, creating mud/pressure/gas ratio analysis logs and hydraulic/swab & surge reports and trip sheets,

Preparing final well reports, installation, calibration and repair of a variety of sensors to the relevant electrical standards.

April 25,2013 – April 24,2014 Mud logging Geologist OGDCL GWS Department Islamabad, Pakistan

Key Projects:

Well Site (Rajian-8) & (Soghri-1).

Key Responsibilities:

Using the tools to predict potentially dangerous situations such as kicks or the detection of gas, creating mud/pressure/gas ratio analysis logs and hydraulic/swab & surge reports and trip sheets,

Preparing final well reports, installation, calibration and repair of a variety of sensors to the relevant electrical standards.

Real time monitoring of drilling activity onsite,

Recording lithology and hydrocarbon shows/gas, contributing to maintain a safe working environment on the rig by interpreting the data at hand

Giving feedback to the well site geologist/drilling team

Internship: 01 Month:

Site C-2 (Mujhoi) in Neelum Jhelum Hydropower Project, Azad Jammu & Kashmir Muzaffarabad, Pakistan

Additional Information

References Available on Request



Contact this candidate