ARNEL HERNANDEZ SUMAGPANG
Block * Lot * Foscarini Street Mille Luce Subd.
San Roque, Antipolo City Rizal, Philippines
E-Mail : adjr26@r.postjobfree.com
Telephone : (632) 661- 3514 Philippines
WhatsApp :+63-916*******
KEY QUALIFCATIONS: Enthusiasm, Innovation, Teamworking skills, The ability to work well under pressure, The motivation to work extra hours when necessary.
CAREER SUMMARY:
ELECTRICAL COMMISSIONING ENGINEER. January 2018 to March 2020 Tekniq Oy Kauppapuistikko 11 B 65100 Vassa Finland
SERVICE ENGINEER., November 2016 to November, 2017 (RSS Saudi Company Limited) P. O. Box 30863, Al Khobar 31952, Kingdom of Saudi Arabia.
FIELD SERVICE ENGINEER / COMMISSIONING OPERATOR, August. 2016 to Sept. 2016, (Independent Contractor at GE Granite under Voyage Global Energy, Tabuk Power Plant 2,Kingdom of Saudi Arabia.
LEAD ELECTRICIAN/ OPERATION SUPERVISOR, March. 2015 to March. 2016, (20 MW Diesel Power Plant
PLN PLTD POKA .PYM/RSS Ambon, Indonesia.
SHIFT SUPERVISOR, Dec. 2013 to Dec. 2014, ( 100MW GE P&W FT8 Gas Turbine Power Plant
Samnu, Sabha, Libya /APR Energy Project PIC ASIA PACIFIC SDN.BHD.Suite 4003A, President Hous Jalan Kuala Lumpur, Malaysia
ELECTRICAL TECHNICIAN/OPERATION SUPERVISOR, Nov. 2006 to Dec. 2013, (Aggreko UK Limited) 23mw Bellevue Gabon, 30MW Lobito Angola, 30MW Lubango Angola, 10MW Benguela, Angola,10MW Huambo,Angola
GENERATOR ELECTRO-MECHANICAL TECHINICIAN, August 2001. to Oct. 2006, ( Saudi Oger Limited Sogex Power Plant,PO Box 17061, Jeddah 21484, KSA
CCMS OPERATOR/ TECHNICIAN, Feb. 1993 to July. 2001, (, Saudi Company Limited.Al Megleya Commercial Center
PO Box 17049, Riyadh 21484 KSA Kingdom of Saudi Arabia)
ELECTRICAL SUPERVISOR, July 1991 to Dec. 1992, ( GAMA SERVICES, LTD. (Al Amal Hospital)
PO Box 6826, Jeddah 21452 KSA (Kingdom of Saudi Arabia)
SUMMARY
•With more than twenty (26) years of extensive work experiences in power generation, depo workshop, operation and maintenance commissioning installation of diesel generators, BOP, transformer and switchgear, control wiring or equipment.
EDUCATION
Course School
Electrical Engineering National University, Manila Philippines, Graduated 1988
DETAILED WORK EXPERIENCES
Duration : February 10, 2018 up to March 23, 2020
Position : Electrical Commissioning Engineer.
Company : Tekniq Oy
Previous Salary : 4,000 Euro
Location : Kauppapuistikko 11B 2ND Floor 65100 Vaasa Finland
Project : Summit Kodda 1, 11 Gazipur 450 MW Power Plant Gazipur Bangladesh
Project : Package V EPC Power Plant 40MW Ambon Indonesia
Project : Bangkanai GEPP Stage 2 140MW Karedan Village, Lahei Subdistrict, North Barito Regency
In Kalimantan Province Indonesia.
Responsibilities
>: Supervision of Erection, installation and commissioning of Wartsila equipment.
>:Testing values for Vamp 210 Generator Protection relay
> Testing values for Vamp 265 Differential Protection relay and review electrical construction drawing.
> Perform Insulation test for electrical motor in aux. area
> Perform DG Conductivity test and I/O Test,
> Safety of self and others.
> Perform PI test in ABB power generator.
DETAILED WORK EXPERIENCES
Duration : November 20, 2016 – November 23, 2017
Position : Service Engineer.
Company : RSS (Rental Solution Services)
Previous Salary : 10,000 Saudi Riyals
Location : P O. Box 30863 Al Khobar 31952 KSA
Project : Depo Workshop, Commissioning and Installation
Responsibilities
>: Installation and Commissioning of Power Plant and BOP.
>: Repair of various RSS various generator equipment from 30 KVA, 60KVA, 220KVA,300KVA, 500KVA, 640KVA 1000KVA and 1250KVA PCC unit
> Conduct load test from 0 to 100% load before dispatch to site.
> To carry out major electrical equipment maintenance on rss equipment
> Adherence to 5S
> To carry out systematic fault finding and repairs on electrical and control equipment.
> To follow and comply with company QHSE Standards.
> Safety of self and others.
> To carry out switching on LV and HV company equipment.
Duration : April 5, 2016 – Nov 5, 2016
Position : Field Service Engineer/Commissioning Operator
Company :Independent Contractor at GE Granite under Voyage Global Energy
Previous Salary : 25 USD per hr plus 50 USD per diem
Location : Tabuk Power Plant 2 KSA.
Project : @2 x 25MW GE TM 2500+
>Installation and Commissioning of Power Plant and BOP
> Operation and maintenance
> Trouble shooting of GE TM2500+ / LM2500 Gas Turbine and Compressor Control System, Brush Generator, package vibration and fire & gas system.
> Resolving of PLC Control System and HMI issue, Wonderware
> MTU 2000/4000, CAT3516B/C
>Power Transformers 2MVA up to 30MVA maintenance/repair/troubleshooting
> Multi TAP Power Transformers (7KV, 11KV, 22KV, 33KV)
> Pumps, filtration and purging system
Duration : March 17, 2015, March 31, 2016
Position :Lead Electrician / Operation Supervisor
Company : Rental Solution and Services
Previous Salary : 2,800 USD
Location : P.O. Box 53220 Dubai UAE
Project :@20 MW Diesel Power Plant PLN PLTD POKA PYM/RSS Ambon, Indonesia
Responsibilities:
>Maintain, repair and replaces and installs a broad range of electrical equipment . Performs routine testing
> Installation and Commissioning of Power Plant and BOP
>Supervise and coordinate the various processes in power generation during the shift such as: delivery of quality product and service to the customer, operation of the diesel generator sets.
>Check light fuel/lube oil analysis results against Light Fuel/Lube Oil Standards.
>Document non-conformance found in the analysis of light fuel/lube oil and the corrective actions taken.
>Implement corrective and preventive action if there are any non-conformances in the power generation process.
>Prepare and review daily reports.
>Prepare daily reports and assist in weekly operational reports.
>Prepare operations plan (Diesel Generator units operating schedule).
>Prepare, monitor and control operations budget in order to ensure cost effectiveness.
>Undertake monthly operations performance review.
>Plan and implement daily operation activities.
> Maintain and repair RSS,transformers, alternators, motor and associated control panels Trouble shooting & detailed fault analysis
Duration :December 05, 2013 December 03,2014
Position : Shift Supervisor :
Company : PIC ASIA PACIFIC SDN.BHD. Suite 4003A, President Hous Jalan Sultan Ismail
Kuala Lumpur, Malaysia.
Location : Samnu, Sabha, Libya /APR Energy Project
Previous Salary : 2,500 USD plus 50 USD per diem and overtime
Project : @ 100MW P&W FT8 Gas Turbine Power Plant
Responsibilities:
>Supervise and coordinate the various processes in power generation during the shift such as: delivery of quality product and service to the customer, operation of the diesel generator sets and Gas Turbine power pack.
> Installation and Commissioning of Power Plant and BOP
>Coordinate with customer on fuel management, plant testing and plant loading.
>Ensure plant availability is maintained or near acceptable percentage.
>Ensure that the plant is operating according to contract.
>Handle daily plant dispatch as required by customer.
>-Discuss and update operation plan with the Plant Manager.
>Responsible for the smooth and continuous operation of the plant in his shift assignment.
>Assist the Plant Manager in implementing company policies, SOPs, safety procedures, good housekeeping, energy conservation guidelines and environmental regulations.
>Assist the Plant Manager in the implementation of quality and productivity initiatives.
>Prepare and review daily and weekly reports.
>Prepare daily reports and assist in weekly operational reports and coordination with the customer and headquarter office.
>Ensure that Water treatment Plant (R.O.) is maintained
> Conduct clarity test and water test on Centrifuge
>Ensure the accuracy of the data on reports.
>Prepare and submit monthly billing invoice to customer.
>Maintain and repair APR LV/HV switchgear,transformers, SF6 Breakers, LV/HV Isolators alternators, motor and associated control panels Trouble shooting & detailed fault analysis
Duration : November 04, 2006 - Dec 02, 2013
Position :Electrical Tech/ Operation Supervisor
Company : AGGREKO UK. LTD.
Previous Salary : 1,500 USD 50 USD per diem
Location :P. O. Box 17576 Jebil Ali, Dubai, U A E.
Project : 30mw Phase 1 Cazenga Luanda Angola, 30mw Lobito Angola, 10mw Benguela Angola, 10mw Lubango Angola, 10mw Huambo Angola, 23MW Bellevue Gabon, 10MW Gold Mining Ivorycoast
Ensure maximum plant availability and best possible equipment condition.
Installation and Commissioning of Power Plant and BOP
Ensure the commissioning of sites and demobilization is carried out as per AIP Standard.
Acting Site Supervisor for 12MW Huambo and 10MW Benguela
Maintain and repair Aggreko LV/HV switchgear,transformers, alternators, motor and associated control panels Trouble shooting & detailed fault analysis.
Ensure that permit to work system is fully implemented as per BOP/040 and BOP/ 049
Commissioning Genset's and Temperature Control Equipment from TengizChevroil Kazakhstan
Implement company QHSE policies and ensure that all personnel working with him adhere to the policies .Carries out site HSE audits and accident reporting knowledge.
Maintain, repair and replaces and installs a broad range of electrical equipment . Performs routine testing/ analyzing using defined and well documented/ proven procedures.
Maintains a daily site diary.
Adherence to 5S
Maintain QSK 60 GAS, QSK 45, KTA 50 G3PLUS, QST30 GCSPCC 3100
To follow and Comply with QHSE Standard.
Safety of self and others.
Assist in the development of new employees including the provision of site induction.
Report and document component failure.
Operation and Maintenance for Bellevue Gabon 23 MW, Lobito Angola 3O MW. 15MW Military site Luanda Angola,30MW Lubango site, Gabon Gas 25MW. Huambo Angola site 12MW, Benguela Angola site 10MW,Sanam Site K.S.A.
Duration : August 26, 2001 – October 24, 2006
Position : Generator Electro - Mechanical Technician
Company :SAUDI OGER LTD.
Previous Salary : 4,000 Saudi Riyals
Location : PO Box 17061, Jeddah 21484, KSA
Project : Sogex Power Plant
Responsibilities :
Preventive maintenance of all equipments in distribution network with mc set, RMU Ring Main Unit Vercors M6 MV switchgear, VSI 12 Brush Switchgear Preventive maintenance of motor control center, Low and High tension motor, screw compressor, UPS,PLC and capacitor bank.
Installation repair and maintenance for Deutz BVM 540, caterpillar 3516.3412 3412-C, Cummins KTA 2300 KTA 50,QST 30 generators and various electrical equipment.
Evaluates equipment performance and monitors use, determines and interprets capacities and performance data and select equipment to be used for maximum efficiency and reliability. Inspect services, trouble shoot and repair equipment.
Preparing contingency plans and switching program
Duration :February 9, 1993 – July 14, 2001
Position : CCMS Operator / Technician
Company : SAUDI COMPANY LTD.
Previous Salary : 3,000 Saudi Riyals
Location :PO Box 17049, Riyadh 21484 KSA
Project :Al Megleya Commercial Center.
Responsibilities :
Monitoring of operation and maintenance of HVAC, mechanical, power/lighting system, substation, power transformer, low voltages, medium voltage switchgear, fire alarm system, elevator, escalator and preventive maintenance of all DGP. In CCMS and other related equipment.
Troubleshooting and repair of all related electrical system
Duration : July 8, 1991 – December 21, 1992
Position : Electrical Supervisor
Company : GAMA SERVICES, LTD.
Previous Salary : 2,500 Saudi Riyals
Location : PO Box 6826, Jeddah 21452 KSA
Project : Al Amal Hospital
Responsibilities :
Makes recommendation and report as required by the technical work request system.
Performs other job as designated by the hospital engineers.
Weekly test run of emergency standby generator set with load.
Condition monitoring / PM / PDM technique
Attended daily complain from housing, hospital, and Shop for repair equipment such as, washing machine, dryer machine, dishwasher, oven, and water heater.
Assist in the preventive maintenance of substation, power generating units, motor control centers, motor and related equipment.
Able to trouble shoot electrical problem.
Read analyze electrical plans, schematic diagrams.
Supervises execution of electrical project as required.
TRAININGS/SEMINARS ATTENDED
SFS 6002 Electrical Safety Training
Primatest Conducted January 27, 2018
Medical Emergency First Aid .
PNTC College Maritime Training Center,Conducted January 03-04, 2018
IOSH Institution of Occupational Safety and Health
By TWI Gulf WLL, Conducted April 02- 05, 2011
APP2 Aggreko High Voltage Switching Authorization,
By Aggreko UK Ltd, Conducted July-11-2011
Central Control Monitoring System
Staefa Control System MS – 2000
By: Al Rayyan Est., AMCC, Riyadh, KSA, Conducted November- 1 30, 1992
Oil Tanker Familiarization
By: Asia Pacific Maritime Services, Inc. - Training Center
1350 Roxas Boulevard, Manila, Philippines, Conducted December 2-5, 1996
Chemical Tanker Familiarization
By: Asia Pacific Maritime Services, Inc. - Training Center
1350 Roxas Boulevard, Manila, Philippines., Conducted December 2-5, 1996
COMPUTER SKILLS
MS Office ( MS Word, Ms Exel )
PERSONAL DATA
Date of Birth : May 23, 1966
Place of Birth : Pag-asa, Taysan, Batangas, Philippines
Age : 54 Years Old
Sex : Male
Civil Status : Married
Citizenship : Filipino
Height : 173 cms.
Weight : 72 kgs.
Health : Excellent
Citizenship : Filipino
Dialect Spoken : Filipino and English
Wife’s Name : Evangeline P. Sumagpang
Father’s Name : Briccio A. Sumagpang
Mother’s Name : Leonila H. Sumagpang
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
AHS
Specimen Signature