Resume
Overview Shamsher Singh +919*********
adjqgj@r.postjobfree.com
Village Mehndru, P.O. Katora, Tehsil-Dehra, Distt. Kangra H.P.-176027
Personal
Date of Birth: April 04, 1972
Gender Male
Speak Hindi, Panjabi, English
Martial Status Married
Job Experience
Years of experience 16 Years and 02 months
Current Salary Rs. 90,000.00 /month
Expectation Negotiation
Academic and Professional Education
Sr.No
Description
University’s
Passing of year
1.
Diploma in Civil Engineer
Sri Sathya Sai Institute Of Higher Learning-Khora,Prem-Vihar
2004
2.
B.A
Bachelor of Arts
HPU Shimla
1997
3.
10+2
HP Board of School Education Dharamshala -
1993
4.
Matriculation
HP Board of School Education Dharamshala
1990
Current Employment JSW Energy Ltd.
Project Name Kutehr Hydro Electric Power Project Distt. Chamba H.P
Period September 2020 to till date.
Responsibilities
Working as a Senior Construction Manager Adit 2 to Adit 3, Tunnel (6 x 6.5m dia) Underground Excavation-Heading and benching, Drilling, blasting, supporting system – Ribs, Wiremesh, Rock bolting, Grouting shotcreting as per drawings and Instruction of Geology and arrangement of Material at site.
Past Employment
(1) Continental Construction International Ltd.
Project Name Four Laning of Kiratpur- Ner Chowk Section of NH-21
Period September 2016 to August 2020.
Responsibilities
Working as a Lead Construction Manager T-3 (Tunnel) Underground Excavation-Heading and benching, Drilling, blasting, supporting system – Ribs, Lattice girder,Wiremesh, Rock bolting, Grouting as per drawings and Instruction of Geology(NATM pattern) and arrangement of Material at site.
Past Employment
(2) NSL Renewable Hydro Electric Power Pvt. Ltd
Project Name Tidong Hydro Electric Power Project (P) Ltd. (150 MW) Distt. Kinnaur Himachal Pradesh
Period March, 2016 to August 2016
Responsibilities Worked as a Deputy Manager
Reservoir Excavation of Reservoir having Capacity 283000m3 water storage.
Gravity wall Construction of RCC works of gravity wall having 33nos of (14m x 17m) block.
Gallery Construction of drainage gallery 2m x 2.5m under gravity wall.
Billing Joint measurements with contractor, bill preparation of construction work at site
(3) NSL Renewable Hydro Electric Power Pvt. Ltd
Project Name Tangnu Romai Hydro Electric Power Project (P) Ltd. (44+6 MW) Rohru Distt. Shimla Himachal Pradesh
Period November, 2010 to February, 2016
Responsibilities
Excavation work Underground excavation of Main access Tunnel to Power House cavern, Adit cum ventilation tunnel, Tail race tunnel in Power House complex in accordance with the design drawings.
Protection work Rock stabilization in Underground works using rock bolts, wire mesh and shotcrete as specified in construction drawings.
Manpower and machinery management.
Joint measurements with contractor, bill preparation at site.
Road work Construction Approach road 05 km. long, with steel bridge 52m long span and road protection work.
Transmission line Construction Transmission line Double pole erection, fitting & stringing of conductor 22Km long
Solar Project work Fixing the solar modules with digging of pits and anchoring in solar project at Gujarat is completed
Canal work Cost estimation and excavated the canal 900m long 6m wide and concreting work completed with check dam.
Billing Joint measurements with contractor, bill preparation at site
(4) Italian Thai Development Public Company Ltd. (ITDPCL)
Project Name Kol Dam Hydro Electric Power Project (4x200 MW).
Period July 2005 to October 2010
Responsibilities Worked as a Junior Engineer
Excavation work Excavation, drilling as per pattern, Blasting & Rock stabilization with Rock Bolts, Weld wire Mesh, Concrete and shot crete.
Filling Work Filling Work and compaction (Material No. #01 to material No.# 10)
Machinery Managing the Man Power and Equipment like ROC, Jack Hammer, Compressors, Shot Crete Machine and Grouting Pump and Heavy earth moving machinery like Bull Dozers, Wheel Loaders, Excavators & Shovels, and Vibratory Compactors, Hydraulic Mobile Crane etc.
Weekly and monthly meeting with client related to site work.