SANJIB PRADHAN

Page *

Subas Nagar,*nd Lane, Industrial estate,Ganjam,Odissha-760008.

Cell: +91-891*******,adjo10@r.postjobfree.com

Professional Summary

Position : Design Engineer (Substation Automation System) Company :Siemens Ltd. (Gurgaon) under the contract of Adecco India Pvt. Ltd (Gurgaon) Duration : Oct 2019 to Aug 2020

Position : Design Engineer (Substation Automation System) Company : Siemens Ltd. (Gurgaon) under the contract of RSN Engineering & Construction Company Pvt. Ltd.

Duration : Mar 2017 to Sep 2019

Position : Commissioning Engineer (Substation Automation System) Company :Siemens Ltd.(Gurgaon) under the contract of Tanuj enterprises. Duration : April 2014 to Feb 2017

Position : Site Engineer (Electrical Substation)

Company :Siemens Ltd.(Gurgaon) under the contract of Rozana Services. Duration : Mar 2013to Mar2014

Skills

Know to work in proprietary Software SICAM PAS, SICAM PASCC, SIMATIC WinCC, AUTOCAD, Ebase software.

Good Knowledge on Automation Products.

Knowledge about IEC61850, Modbus, IEC60870-5-101/104based Substation Automation System.

Ability to apply the product and provide product based solution as per the technical requirement.

Good knowledge in protection and control system.

Ability to perform as a team player.

Work History

Design Engineer (Substation Automation System)

Studying the specification with Costing sheet to understand the scope of works.

To discuss with my manager, if we have any discrepancies between the customer BOM with specification to full fill the customer requirement.

Coordinate with customer to get the technical inputs & requirements for drawing preparation.

Preparation of Configuration, Schematic, Functional Description of Substation Control System, Handbook for Substation Control System (SCS) Panels as per customer requirement.

Drawing Submitted & Coordinate with customer to get the drawing approval/comments.

Resubmit the drawings again to customer to get the approval, if there is any comments received from the customer.

Preparing Signal List for the respective Project. SANJIB PRADHAN

Page 2

After getting the final drawing approval, prepare the manufacturing documents like EQL, Panel wise GA, NPL for Material procurement and Panel Manufacturing purpose.

Preparing offline configuration in PAS & HMI screen in WinCC as per customer requirement. This offline configuration will be sent factory and testing will be done.

Clarifying the queries received from the factory during wiring/testing of the panels.

Coordinating with factory for testing and to complete FAT.

Preparation of FAT correction & Site As-Built drawing after completion of FAT & Site commissioning.

Maintaining tracking sheet for job handling.

Site & Commissioning Engineer

.

Designing of Graphical displays on SIMATIC WinCC-7 software.

Testing and commissioning of SCADA system.

Worked on configuration of 104 addressing for control center connectivity on IEC-104 protocol.

Knowledge in RTU(AK1703)

Discussion with Customer/Clients related to Project Work.

Erection of 132kv & 33 KV Gas Insulate Switchgear.

Erection of 20/25MVA transformer & 1.6 MVA Dry type indoor transformers.

Erection of 6.6kV MV switchgear

Erection, testing and commissioning of LT panels such as HVAC MCC, DCDB, MLDB, ACDB.

Planning and scheduling of various site activities.

Documentation of site test reports, erection and schematic drawings handling at site. Projects In Siemens Ltd.

Product : Substation AutomationSystem (SAS)Panel

Client : KPTCL(Karnataka Power Transmission Limited) Project : 220/66/11kv GIS Koramangala Substation

Product : Substation Automation System (SAS)Panel

Client : IOCL (Indian Oil Corporation Limited)

Project : 33kv GIS Switchgear for BS-VI(HV-61201) Gujrat Refinery Product : Substation Automation System (SAS)Panel

Client : Tata Kalinganagar

Project : 220/132/33/6.6kv Substation

Product : Substation Control System (SCS)Panel

Client : OPTCL (Orissa Power Transmission Limited) Project : 400/220kv OPTCL Grid Substation

Product : Substation Control System (SCS)Panel

Client : AEGCL (Assam Grid Corporation Limited)

Project : 220/132/33kv Samarguri Substation

SANJIB PRADHAN

Page 3

Product : Substation Control System (SCS)Panel

Client : WBSETCL (Westbangal State Electricity Transmission Limited) Project : 220/132/33kv Newtown Substation

Achievements

Designed and executed the projects on time with minimum error.

Prepared cost effective and optimum schematic in line with Customer requirement. My Strength and Ability

Ability to manage project schedules and have contact with outside vendors on equipment scale up and outside processing.

Excellent verbal and written communication skills, strong project management experience.

Ability to handle multiple tasks.

Willingness to adjust work schedule to meet project milestones, and to occasionally travel to other domestic company locations.

Good interaction with customers.

Educational Qualification

B-TECH(EEE) from Sanjay Memorial Institute of Technology, Odisha in 2011 with 73%.

12th from Nabarangpur College, Odisha in 2007 with 44%.

10th from R.C.D High Schoool, Odisha in 2005 with 72%. Personal Detail

Date of Birth :04.10.1990

Gender : Male

Nationality : Indian

Marital Status :Married

Contact No. :+91-891*******,

+91-959*******

Languages Known : English,Hindi,Odiya & Telugu