Post Job Free

Resume

Sign in

Civil Engineering Manager

Location:
Dubai, United Arab Emirates
Salary:
26000
Posted:
January 24, 2021

Contact this candidate

Resume:

* ****

Name : Kirubakaran.B

Profession : Senior Quantity Surveyor/ Senior Contract Administrator

Total Year Experience : 15 years (More than 13 years in GCC) Date of Birth : 29th December 1981

Nationality : Sri Lankan

Driving Licenses : 2044916 UAE &75907975 - Oman

Resident : United Arab Emirates – Dubai

Overview of Experience:

I am a degree holder in Quantity Surveying and working as Quantity Surveyor/Contract administrator, including resourceful in commercial, contractual & cost control activities involved from concept deign stage to completion of projects compliance with FIDIC standard /Bespoke Condition of Contracts. Also, Involve in various prestigious projects and capable to handle complete projects scope of Civil, Facade, MEP & Interior fitouts works including specialist works such as FF&E, kitchen, laundry and landscape with related infrastructor works. I have worked in serveral construction projects such as; hotels, resorts, palace, town houses, residential towers, commercial/ shopping complex buildings, office buildings, school buildings, pharmercical solid oral dosage plant industry, water treatment /power plant and mixed used development with infrastructures in United Arab Emirates, Oman, Qatar and Sri Lanka.

Education Qualification:

Successfully completed BSc (Hons) in Quantity Surveying and Construction Management at Sheffield Hallam University, UK.

Successfully completed National Diploma in Civil Engineering Technology - Three years full time English medium, conducted by ITUM at University of Moratuwa, Sri Lanka.

Successfully completed Engineering Council Examination in City & Guilds - Part I

Successfully completed FIDIC and Project management Training Program – Conducted by Dr.Gotz-Sebastian Hok at Oman Engineering Society.

Successfully completed “Sound Contract Administration” Course conducted by Prof: IndrawansaSamarathunga Professional Qualification:

Member in Quantity Surveyors International (UK) (MQSi-3799)

Incorporate member in CIOB (ICIOB-2014248)

Associate Member (AM0877) of the Institution of Incorporated Engineers - Sri Lanka. (IIESL)

Licentiateship in Civil Engineering (LCGI) of City and Guide of London – UK B.Kirubakaran

B.sc (Hons) Quantity Surveying & Construction

Management (UK), Dip (Civil) Eng (SL),MQsi

ICIOB .AMIIESL.

E-mail : adjnxf@r.postjobfree.com

Mob : +971-**-***-****

2 Page

Major Landmark projects handled (post contract);

Hospitality Projects.

Hyatt Centric hotel (173 Key) at Jumeriah - Dubai

Hampton by Hilton Hotel (420 key) at Al Tawar - Dubai

Alila Jabel Akhdar Resort (84 suites and 2 VIP Villa)-at Jabel Akhdar – Oman

Salalah palace -Redevelopment of Al Shattie East and Ber Bin Najen – (Royal Guest House & VIP villas) Mixed use Development.

New Facilities at Al-Shafaq Club – Ministry of Defence Oman Highrise Projects.

Rich Reit Tower (6B+G+3P+35F+H.C+R) on plot 143 at Business bay- Dubai

Residential Tower (G+5P+HC+TF+31F) at Wadi al safa, City of Arabia.

Commercial & Residential Building (3B+G+M+18F+R) on plot C-74 at East 13- Abu Dhabi. Residential/mixed used Projects.

Residential/Commercial Buildings (3 blocks G+3) (R1003&R1005) at Karama- Dubai

Townhouses (G+1) 140 Nos at Jumeirah (R533) - Dubai. Industrial & Infrastructure Projects;

Pharma (B+G+2) Oral Dosage plant at Dubai Scince park - Dubai.

Warehouse and office building at Muscat– Public Authority of Electrcity & Water (PAEW) – Oman

Expansion of Barka reservoirs and desalination plant (Phase 2). – Infrastructure Major Landmark projects handled (pre contract);

Hyatt Centric hotel (173 Key) at Jumeriah - Dubai (PS &PC package tendering & Nominations)

Hampton by Hilton Hotel (420 key) at Al Tawar - Dubai(PS &PC package tendering & Nominations)

Alila Jabel Akhdar Resort Hotel-at Jabel Akhdar – Oman (Tender estimation/priceing)

Hyatt place 4-star hotel building (2B+G+3F) – K.S.A

Hydra Tower – Office and commercial – Abu Dhabi

Fujairah hotel resort (B+G+6F) ID &Landscape package – UAE

Townhouses (G+1) 140 Nos at Jumeirah-1 for wasl.

3 Nos Residential/Commercial Buildings (R1003&R1005) at Karama, Dubai for wasl

Rich Reit Tower (6B+G+3P+35F+H.C+R) on plot 143 at Business bay- Dubai

Dubai sports council head quarter building (2B+G+6F+R) – Dubai/UAE

Sheikh Zayed private academy (B+G+3) school building Fit out package–UAE

GEMS school at RAK.

Most Key Responsibilities.

Post contract - with Consultant.

Monitoring, followup and keep updates/records on contractual issues from commencement of contractual arrangements until final settlement,discharge of obligations and defect liablity during defect liability period.

Manage and secure Projects interests with necessary bonds, warranties, insurances etc.

Implementing and maintaining required cost control procedures for Cost Control Activities during the construction statage.

Drafting contractual letters (initiating and answering)

Identify variations to the Contract and potential claims. Notify to Employer about cost impact in advance and implications as per Contract requirements. Also, ensure notifications are timely responded to avoid the time delay situation

Maintain standard notification log, identifying Employer’s delay risk events.

Evaluation of interim payment application and prepare interim payment certificates.

Evaluation of variations, additional works and omissions.

Preparation of monthly cost reports including payments, variations and cliams details etc.

Provisional sum & Prime Cost item works Tender documents preparation and nomination.

Study/Preparation of Value Engineering options and propose/discuss with Employer.

Conduct commercial meeting on regular basis.

3 Page

Post contract - with Main Contractor.

Prepare and submit the interim payment application to the consultant.

Issuing notice for the changes to consultant on timly manner.

Prepare, submit and negoziate the variation, claims and value Engineering proposals to the consultant/Employer.

Preparation of monthly cost reports.

Monior and manage the Contracts with contractual requirements.

Keep track of construction materials and inventory

Keep all costs data up-to-date, and incorporate in Monthly Cost Control.

Subcontract Administration.

Review subcontract and purchase order agreements prior to issue to ensure they are in line with Project requirements

Evaluation of Interim Valuations (sub-contractors) and preparation of Interim Payment Certificates. Pre contract: -

Cost Management:

- Preliminary cost estimate, cencept and periodic analysis throughout the schematic to details design development.

Tender Management:

- Preparations of tender document including quantity takeoff (Civil,MEP & Interior design/fitouts) and BoQ,Tender and Contract Conditions, finalize the tender documents and release the tender.

- Invitation followup,responds to tender querry tender addendum and issue to tenderers.

- Tender analysis and prepare tender evaluation reports to the Empoyer with recommendations.

- Arrange and conduct post tender clarification meetings and achive best tender offer from bidders to reach final price.

- Contract award recommendations & Contract documentations, Prepare Letter of Acceptance / Award / Intent.

Contract Documentation.

- Prepare and finalize the contract documents.

Implementing and maintaining required cost control/value engineering and audit procedures during the design stage.

Coordinate/liaison between Empoyer and Project Manager/Design team/Engineers. Details history of major project working experience: 1. M/s. VX Studio - Dubai Sep 2018 - Present

I am working as Site based Senior Quantity Surveyor (Post contract) and reporting to Resident Engineer

& Employer Commercial manager as part of the project team also coordinate with the various parties for successful deliverable of required task.

Project undertaking:

1. Proposed (2B+G+6+Roof top Restaurant) Hyatt Centric Hotel (5-star Hotel) on plot no 332 3696 at Jumeriah First for M/s.Wasl Assets management Government of Dubai

Project Details : 156 Key ANDAZ Hotel Building with the faculties of Health club, Swimming pool, Roof top restaurant and Landscape works.

Employer : M/s.Wasl Government of Dubai, Dubai Real Estate Corporation

Operator : Hyatt

Main Contractor : M/s. Ssangyong Engineering & Contracting Co Ltd

Project Value : AED 216 million (Lump sum) working arrangement with DREC Conditions of Contract for construction.

4 Page

2. M/s. Design Center Architect & Engineers Consultant - Dubai July 2016 – Aug 2018 I worked as Site based Senior Quantity Surveyor (Post contract) and reporting to Resident Engineer as part of the project team also coordinate with Coordinates with the various parties for successful deliverable of required task.

Project undertaken:

1. Proposed (2B+G+12+GYM) Hampton by Hilton Hotel (3-star Hotel) on plot 232-0199 at Al Qusais for M/s.Wasl Assets management.

Project Details : 420 Key Hotel Building with the faculties of Health club, Swimming pool and Landscape works.

Employer : M/s.Wasl Government of Dubai, Dubai Real Estate Corporation

Operator : Hilton

Main Contractor : M/s. Belhasa Engineering & Contracting LLC

Project Value : AED 158.2 million (Lump sum) working arrangement with DREC Conditions of Contract for construction.

2. Proposed (G+5P+HC+TF+31F) Residential Tower at Wadi al safa, City of Arabia for M/s. MAG Group FZE.

Project Details : Residential Tower with the faculties of Health club, Swimming pool and Landscape works.

Employer : M/s.MAG Group FZE

Project management : M/s. MAG Royal Solution LLC (MRS)

Main Contractor : M/s. SEDCO General Contracting Co LLC

Project Value : AED 296 million (Lump sum) working arrangement with bespoke Conditions of Contract with Red book FIDIC 1999. 3. M/s. TNQ Project Management - Dubai Nov 2015 - June 2016 I worked as site-based Project Contract Administrator and reported to project manager as part of the project management team, Responsible to preparation of cost reports, payment certification, review/finalize of variations and claims, also further working in pre-contract of cost planning and feasibility studies. Project undertaken:

Construction of B+G+2 Oral Dosage Plant for M/s. Pharmax .

Project Details : This is Plant for pharmaceuticals including ancillary building and external works. /service

Employer : M/s.Pharmax Pharmaceuticals

Consultant : M/s. Winner Holistic Consultant

Main Contractor : M/s. Al Jihan Gulf Horizon General Contracting LLC

Project Value : AED 47 million (Lump sum) working arrangement with bespoke Conditions of Contract with Red book FIDIC 1999. 4. M/s. National Engineering Bureau Consultancy - Dubai Sep 2013 – Oct 2015 I worked as Senior Quantity Surveyor and reported to head of Tenders and Contracts. Involved in Pre & Post Contracts projects.

Projects undertaken: (Post Contracts)

1. Rich Reit Tower (6B+G+3P+35F+H.C+R) on plot 143 at Business bay for M/s. Rich Reit Investment Limited. Dubai

Project Details : Completely Residential Apartments except ground floor retails, with the faculties of Health club, swimming pool. Employer : M/s. RichReit Investment Limited

Main Contractor : M/s. Kele Contracting LLC

Project Value : AED 255.76 million (Lump sum)

5 Page

2. Jumeirah Plots Development (R533) – Townhouses (G+1) 140 Nos at Jumeirah for M/s.wasl Government of Dubai, Dubai Real Estate Corporation. Project Details : Residential Townhouses with the swimming pool. Landscape and Infrastructure works.

Employer : M/s. Wasl Government of Dubai, Dubai Real Estate Corporation

Main Contractor : M/s. DUBCO Construction LLC

Project Value : Project Value AED 199.9 million (Lump sum). 5. M/s. Dawood Contracting LLC –Oman May 2010 – Aug 2013 I worked as Senior Quantity Surveyor and managed QS team, reported to Commercial Manager. Involved in Post Contracts activities such as;

Projects undertaken:

1. Dawood Contracting JV Habtoor Leighton Group

Alila Jabel Akhdar Resort Hotel-at Jabel Akhdar

Value $ 37 million (Re measure) - Sep 2011 to Aug 2013 During the tender stage management decided to go project management JV contract with Habtoor Leighton Group –Oman.

Tendering, Estimation, and post contract activities handled by myself and my team. The site started in December 2011 and my responsibility was on financial and contractual matters. Two quantity surveyors were in my team and reported to me.

2. New Facilities at Al-Shafaq Club – Ministry of Defence Oman Value $ 19 million – May 2010 to March 2012

3. Warehouse and Office Building – Public Authority of Electrcity & Water (PAEW) Value $ 9 million – August 2010 to Feb 2012

4. Heath Care Centre at Sohar for Ministry of Health Oman (MOH) Value $ 4 million –completed on 2011

6. M/s. Galfar Engineering & Contracting SAOG –Oman Jan 2008 – April 2010 I worked as Site based Project Quantity Surveyor and reported to Site based Senior Quantity Surveyor. Projects undertaken:

1.Salalah-Redevelopment of Al Shattie East and Ber Bin Najen – Mixed use Development

(Royal Guest House & VIP villa,Infrastructure services, Roads with Landscaping) Value $ 104 million (4 Packages Lump sum & Re measure 2.Expansion of Barka Reservoirs Transmission Facilities & water net works for Barka Desalination Plant (Phase 2). – Infrastructure

Value $ 84 million (Re measure)

7. M/s. Nabina Trading Est (NABCO)-Qatar April 2007 – Dec 2007 I worked as a Quantity Surveyor on Villa project (Own property). Villa Complex -(Property Development)

Value $ 21 million April 2007 – Dec 2007

Main duties and responsibilities:.

Quantity Takeoff& Material Inquiries for all the items civil and MEP services.

Certification of Subcontractor Payments

8. M/s. Superior Construction (Pvt) Ltd - Sri Lanka Mar 2005 – Mar 2007 6 Page

I joined as inplant trainee (1 year) and continue worked as aproject Jr. Quantity Surveyor. Residential Complex (G+15 F)

Value $ 6 million

Main duties and responsibilities:

Quantity Takeoff& Material Inquiries for all Civil, MEP works. Computer Literacy.

Excellent in MS Excel

Extensive knowledge in MS Word & Internet.

AutoCAD

Revit Architectural– Auto desk

ERP system - IPM for projects

NON RELATED REFEREES

Mr. Jalal Chaban

Senior Project Manager

VX Studio

Dubai.

Tel: +971-0508309336

Mr. Mohamed Ismail Mohamed Zakkaria

Head of tender and Contracts

National Engineering Bureau

Dubai.

adjnxf@r.postjobfree.com

Tel: +971-*********

Mr. Audi M Thiab

Head of supervision

Design Center Architects and Engineers Consultant - Dubai.

adjnxf@r.postjobfree.com

Tel: + 971 -555649938

Mr. Mahesh, MRICS

Commercial Manager

Wasl Wasl Asset Management Group

Dubai.

adjnxf@r.postjobfree.com

Tel: +971-*********

I do hereby declare that all the particulars given above are true & correct.

………27/09/2020

Date Signature



Contact this candidate