SIGIT RUDITYO
Objective
Civil Engineer in the field of Building Construction & Building Maintenance
(Project) with emphases Construction Management, Engineering Work, Building Maintenance management / strategy.
Personal Details
Place & Date of Birth Kebumen, Central Java, October, 8st, 1978 Nationality and Citizenship Indonesian
Sex / Marital Status
Passport Number
Male / Maried
B5593808
Driving License A – 781*********
Languages
Bahasa Indonesia, mother tongue.
English.
Contact Address Jl. Toddopuli IV STP 2 No. 8
Makassar – South Sulawesi
Hp : 081*********
E-mail : *****.*******@*****.***
Education
Bachelor Degree
( 2001 – 2004 )
Diploma Degree
( 1997 - 2000 )
Dept. of Civil Engineering,
Gadjah Mada University, Yogyakarta
Dept. of Civil Engineering,
Gadjah Mada University, Yogyakarta
Professional Training
Computer
Auto Cad 2000
M. Office 2000
Microsoft Project 2000
SAP 2000 versi 8
Beton 2000 versi 2
Mix Desain for Concrete
Reinforced -
Technology
Construction –
Management
HSE
Technical
Application of SNI in Mixing Design and Analysis of Reinforced Concrete Structure, UGM Yogyakarta
Project Management Course, PMIT Jakarta
Machinery for leader, PT. SIS
Short course HAKI, Banjarmasin 28-29, April, 2011
Education & Training of Construction Management, UGM Yogyakarta Ahli Muda K3 Konstruksi
Working at Height at PT Adaro Indonesia
Scaffolding for construction
Couching and conseling for performance empowerment ESQ Ways
Pengawas Operasional Pertama at PT Adaro Indonesia Hydrocarbon Manajement Training at PT Kaltim Prima Coal Work Near Water Training at PT Kaltim Prima Coal
Job Safety Analysis at PT Kaltim Prima Coal
Working at Height Training at PT Kaltim Prima Coal SKA Bridge - Muda, Number 1.2.203.3.049.09.1964152 Employment Record
PT Amaro Sukses Bersama
October 2020 - Now
Position
Location
Key Responsibility
PT Petrosea
June 2018 - end of December 2019
Position
Location
Key Responsibility
Radiologi Care Centre, Pelamonia Hospital
Team Leader
Makassar - South Sulawesi
Lead all civil crew ensuring all aspect of performance and works are compliance with project specification and completed within planned and budget Project Engineering Superintendent
Lampunut, Murung Raya - Central Borneo
Monitoring and review in preparation and implementation PEP. Analyse and create problem solving through operational problem and develop process or standard base on organization needs.
Material Take Over
Monitoring material
Sequence of work
Final Quantity
Maintenance team engineering at site
PT Royal HaskoningDHV
August 2016 – March 2018
Position
Location
Key Responsibility
April 2015 – July 2016
Position
Location
Key Responsibility
PT Bangun Nusantara Jaya Makmur
June 2014 – March 2015
Position
Location
Key Responsibility
PT Bumi Suksesindo
October 2013 – May 2014
Position
Location
Key Responsibility
PT Mc Connell Dowell Indonesia
January 2013 – September 2013
Position
Location
Key Responsibility
PT Saptaindra Sejati
November 2008 – September 2012
Project Engineer
Pantai Indah Kapuk Reclamation
QC for PVD installation, Dynamic Compaction, Vibro Floatation Compaction, revetment rock for safety pond, Geosynthetic installation (Geo Mattrass, Geo Grid, Geotextile), Dike construction.
Project Engineer
Muara Enim, South Sumatra
Engineering works (review design, review specification) Project Planning
QA – QC Aspect
Report (daily, weekly, monthly)
Geotechnical aspect
ITP, MTO
Hauling road and bridge superintendent
Barito Timur, Central Kalimantan
Engineering works (design, specification, BoQ)
Planning of works
Earth moving (repair bridge collaps, extension port, green project haulage) Drainage (long drainage and cross drainage cap 100 T) QA – QC Aspect.
Senior Civil Construction
Banyuwangi, East Java
Supervision and lead all civil crew ensuring all aspect of performance and works are compliance with project specification and completed within planned and budget
Senior Civil Engineer
PT. J Resources Nusantara, Gold Mining Site Bakan – North Sulawesi Nusantara
• Site Coordination with consultant and owner.
• Engineering Work (detail of drawing, planning man power and material, method of work, method statement )
• Construction (implementation design) for work shop, warehouse, detox area, process plan, gold room, laboratory, water tank, fuel tank, camp staff. Position Senior Civil Construction and Infrastructure Location PT. Adaro Indonesia – South Kalimantan
Key Responsibility
• Site Coordination, Engineering Work on Planning, Construction & Interfacing with Other Departement include Administration.
• Preparation & evaluation daily maintenance programs and outage plans.
• Supporting condition monitoring / analyzing based on facilities strategy
(P2K3LM Level 2, MIO and KPI).
• Field support for operation mining (monitoring elevation sump area, drainage, dewatering, maintenance building, road access, land scape).
• Monitoring and review master budget (Schedule Plan, Cost Control).
• Planning engineering and master budget for next year (Building support mining, maintenance, camp building for staff and non staff) PT Mahakam Nusa Energi
( Construction Div. )
Atrium Setia Budi floor 3, suit 304
September 2005 – August 2008
Design Incinerator Plan for Jababeka Industrial Estate, Cikarang Design Incinerator Plan for LIPPO Cikarang Industrial Estate, Cikarang
• Build Temporary Magazine for PT Kaltim Prima Coal
• Bengalon Site Area, Sangatta, East Kalimantan
• Supervision Lubuk Tutung Port area, Bengalon, Sangatta, East Kalimantan.
• Maintenance of Temporary Magazine PT Kaltim Prima Coal, Bengalon Site Area, Sangatta, East Kalimantan
• Bridge and Soil Asphal Cement, Soekarno – Hatta road, Sangatta, East Kalimantan
Position
Site Civil Engineer / Building (maintenance) Engineer Key Responsibility
• Site Coordination, Engineering Work on Planning (Schedule Plan, Cost Control, Approval Construction Activities / Progress), Construction & Interfacing with Regional Administration.
• Preparation & evaluation daily maintenance programs and outage plans.
• Supporting condition monitoring / analyzing based on maintenance strategy.
• Maintenance road.
PT Wijaya Karya
Divisi Sipil Umum III
Samarinda
Dec 2004 – August 2005
Soil Asphal Cement, Simpang Perdau – Batu Ampar Phase I & Phase II Sangatta, East Kalimantan
Position
Key Responsibility
Civil Engineer
• Project Design & Contractor Negotiation, Implementation of Construction Development, Safety & Environment
• Engineering Work: Schedule Plan, Cost Control, Approval Construction Activities / Progress.
• Direction & Supervision of Construction Activities & Sub Contractor, Site Coordination & Control the Supervising Jobs, Making Constriction Method / Site Instructions.
I hereby declare that all information above are true and correct to the best of my knowledge.