Post Job Free

Resume

Sign in

Engineer Manager

Location:
Altstadt - Saint Lorenz, Bavaria, 90403, Germany
Posted:
January 21, 2021

Contact this candidate

Resume:

Angel Romero P.

System Engineer & RAN/Wireless

Cell Phone Number: +346********

E-mail: adjlld@r.postjobfree.com

COLEGIO DE INGENIEROS DE VENEZUELA: 209743

http://www.linkedin.com/profile/view?id=52913239&trk=tab_pro

Summary

I have been working in projects for some of the best telecom providers of the world such as ERICSSON RBS 2000/3000/6000 for 2G/3G/4G, NOKIA FLEXI EDGE/WCDMA/LTE, MARCONNI LONG HAUL, ANDREWS, ZTE ZSXDR 8700, LUCENT CDMA, HUAWEI Series 3900/5900 and ELTEK for all the mobile service companies in Venezuela (MOVISTAR, MOVILNET and DIGITEL)and abroad for T-MOBILE, DIGICEL, CABLE & WIRELESS, VIVO,TELEFONICA, E PLUS, O2 in Brazil, Panama, El Salvador, USA and GERMANY since 2007. I have plenty experience as Field/Wireless/BTS Engineer in GSM, CDMA, UMTS/WCDMA Tx, Swap Out projects and ADVANTECH SATNET VIASAT IDU/ODU. Above these knowledge and skills, I am proficient in English and Portuguese.

Work Experience

COMPANY: OFG SPAIN

Field Technitian: since Jun 2019.

Nokia 4G, 5G (AIRSCALE, FSMF, etc) integration and troubleshooting, installation supervision and standards check out, BTS documentation for TELEFONICA GERMANY in North, West and East regions.

Ericsson Baseband 5212/5216, 6620/6630, C608 Field Technichal perform on-site including installation, supervision, implementation, commissioning, integration, troubleshooting, Tx tests/verification and ATP for VODAFONE, ORANGE and TELEFONICA in Catalunia Region, Spain.

At this moment I am in Germany as Field Technitian worknig with HUAWEI BBU 5900 doing integration, troubleshoooting, supervision, logistics, commissioning, service tests, and site aceptation protocol for VODAFONE WEST and SOUTH Region in Germany and at the same time, making Site Survey for Nokia 5G for Vodafone, T-Mobile, Telefonica and O2.

COMPANY: FAMILY BUSSINESS

since Jul 2019 until Jun 2019.

Since February 2016 I am part of a family business in Tenerife Island, Spain.

COMPANY: HUAWEI GERMANY (OFG SPAIN)

Field Technical Support:since Jan 2018.

At this moment I am working as Field Technical Support the TELEFONICA/E PLUS/O2 project WEST CONSOLIDATION in Germany for NOKIA FLEXI 2G/3G/4G installation, commissioning, integration, troubleshooting, Call Test, St90 sites and other related duties.

Untill march I was asigned to HUAWEI Field Technical Support for 2G/3G/4G/Tx. Some of my duties are 2G/3G/4G/Tx troubleshooting, local integration, patch, re patch, call test, etc.

COMPANY: FAMILY BUSSINESS

Support Field Technician: since Feb 2016 until Jan 2018.

Since February 2016 I am part of a family business in Tenerife Island, Spain.

COMPANY: TWIN TEL INC.

Support Field Technician: since Nov 2015 until Feb 2016.

I was working as Field Technician Support for T-MOBILE Network in South West Florida for Nokia BTS. I was working with all technologies installed in Nokia BTS for this client such as Flexi Edge, WCDMA (FXFB, FXFC,2G- U1900, etc), LTE (FRIG 2100, L700), antenna line equipment (TMA RFS, antennas Cell Max and RFS, RET motor RFS and Cell Max, etc), CERAGON Microwave Links, OVP s, etc. This is a O&M and troubleshooting work 24/7 service focused on client and customer service.Cat5/Cat6 cabling, CISCO, CERAGON, JUNIPER, Routers/Switches, installation, structured cabling standards using ADVANTEST SPECTRUM ANALYZER U3771/3772 for wave measurements.

COMPANY: Ericsson LATAM.

Field Supervisor: since Jun 2015 until Nov 2015.

Since June 2015 I was part of RAN Team at Ericsson LATAM working as FIELD SUPERVISOR with RBS 6000 (6102, 6101, 6201, 6301) GSM/WCDMA/LTE (DUG, DUW, DUL, SIU, OMS-846 and SAU), RBS 6101, 6102, 6301, BBS, etc; as commissioner, integrator, troubleshooter and ATP supervisor using software and tools all of this duties such as PUTTY, ELEMENT MANAGER, OMT, WIN FIOL, HYPERTERMINAL, Administrative tools such as SITE HANDLER and AGENCY HANDLER, etc; all of these was in EL SALVADOR for DIGICEL project and PANAMA for CABLE & WIRELESS project. These projects were based on:

- Cabinets SWAP OUT (PBC05 to 6101/6102).

- BBS INSTALLATION and Power Supply connections.

- WCDMA SECTORIZING (1xDUWxSECTOR).

- WCDMA SINCRONIZATION (2xDUWxRBS) 2xDUW850 and 2xDUW1900.

- DUW installation, SCRATCH, commissioning, integration, supervision and ATP.

- DUAL BEAM ANTENNA installation and calibration (4xRRUxSECTOR) 2xRRU 850 and 2xRRU 1900 per sector.

- TCU configuration and commissioning for Tx RBS-RNC.

- DUW, TCU, 6000 CABINET, BBS CABINET, Tx, RRU and POWER SUPPLY supervision, commissioning, integration and troubleshooting performance.

- DUW SOFTWARE UPGRADES SW15 to SW18 for WCDMA.

COMPANY: M&R Construcciones.

Support Field Technician: since Mar 2015.

On my duties I am in charge of Site Survey and documentation for SWAP OUT CARACAS MOVILNET PROJECT in Gran Caracas, Venezuela; for HUAWEI swapping out Ericsson GSM/WCDMA equipment. These duties include Site visit, photo memory, HUAWEI GSM/UMTS/LTE Installation Proposal, AUTOCAD planes and energy connections suggestions.

COMPANY: TWIN TEL INC.

Support Field Technician: since Oct 2014 to Mar 2015.

At that moment I was working as Field Technician Support for T-MOBILE Network in South Florida for Nokia BTS (2G, WCDMA 2100, U1900, LTE, MICROWAVES, O&M, etc.), I am working with all technologies installed in Nokia BTS for this client such as Flexi Edge, WCDMA (FXFB, FXFC,2G- U1900, etc), LTE (FRIG 2100), antenna line equipment (TMA RFS, antennas Cell Max and RFS, RET motor RFS and Cell Max, etc), CERAGON Microwave Links, OVP s, etc. This is a O&M and troubleshooting work 24/7 service focused on the client and service to costumer. Cat5/Cat6 cabling, CISCO, CERAGON, JUNIPER, Routers/Switches, installation, structured cabling standards. ADVANTEST SPECTRUM ANALYZER U3771/3772 for wave measurements.

COMPANY: Ericsson Venezuela.

Field Supervisor: since Nov 2012 until Oct 2014.

Since November 2012 I was part of RAN Team at Ericsson Venezuela working as FIELD SUPERVISOR with RBS 6000(6102, 6101, 6201, 6301)GSM/WCDMA/LTE(DUG, DUW, DUL, SIU, OMS-846 and SAU), RBS 3000 (3018, 3418, 3518) IP migrations, E1 expansions (for ERICSSON SERIES 3000 ETMF-X, RAX, TXH6-O3/04/06, ETMC-1 boards) as commissioner, integrator, troubleshooter and ATP supervisorusing software and tools all of this duties such as PUTTY, ELEMENT MANAGER, OMT, WIN FIOL, Administrative tools such as SITE HANDLER and AGENCY HANDLER, etc. Part of the work is to be in contact and operate certain functions of LUCENT CDMA MODCELL 4.0 in some cases such as alarms, connections, alarm configuration, power supply and some other functions needed by the client MOVILNET. At this moment I work for MOVILNET and DIGITEL (SWAP OUT) for projects with more than 300 RBS commissioned and integrated by myself to their network in Venezuela capital and satellite cities Gran Caracas.

COMPANY: Implementation Consultant Engineer.

Field Engineer:since Feb 2012 to Nov 2012.

Based on my personal experience and knowledge, now I was conductingSite Survey, documentation and installation for Ericsson RBS 6000 GSM/WCDMA (DUG and DUW for 3G), Nokia Flexi Edge-WCDMA BTS, HuaweiSS Engineer UMTS BTS for the DIGITEL SWAP OUT PROJECTREGION LOS LLANOS and ZTE ZXSDR BS8700 BTS for installation and implementation. I am Team Leader, consultant Installation and Carrier detection (sweeps) using ADVENTEST U3771 spectrum analyzer.

SITE SURVEY, supervision and installation for HUAWEI BTS 3606E-450; grounding, power, floor anchor and hole indoor installation for this CDMA equipment.

Having received the implementation, commissioning and integration courses in CANTV (Venezuela) added to my all previousexperience as telecom integrator and installer, part of my duties is to be Consultant for ADVANTECH SATELITE SATNETMODEM IDU and VIASAT IDU/ODU installation, commissioning and integration for Satellite Simon Bolivar Ground Stations.All these duties mentioned before are being done giving my professional services directly to the outsourcing companies as Implementation Consultant Engineer.

ENERGY EXPERIENCE

During more than 4 year I have been working with Power System for RF, 2G and 3G sites in SS, Siemens Power Supply, AC Panel, DC panel, ZTE BTS 8700 Power System, Ericsson RBS 2000/3000/6000 Power System and Batteries bank installation, Eltek, Mini Eltek, Eltek II installation standards, handling and troubleshooting.

COMPANY: RELCOM GROUP BRAZIL.

Installation Team Leader: since Oct to Dec 2011

At that moment I was Team Leader Installation, GSM/WCDMA specialist and troubleshooting handling for RELCOM Group in a project for VIVO, one of the most important mobile service providers in Brazil. I am in charge of ERICSSON RBS 6000 (6102, 6101, 6201,6301) installation, commissioning, integration and troubleshooting for GSM (2G-DUG) and WCDMA ERICSSON (3G-DUW), Retrofits process from E/// RBS 2000 service cabinet to E/// RBS 6000, alarm handling and troubleshooting Tx solution (E1/Iub) and Energy Supply (ELTEK, Siemens Power Supply and AC-DC PANEL, etc.).

At the same time, it was necessary for me to install Tx(E1/Iub cable, cross connection and connectors) and check with BSC/RNC in order to make an efficient integration for each site of the Cluster assigned to my Team for VIVO network.

COMPANY: ZTE de Venezuela C.A.

Installation Leader:since March to Sept 2011.

Because of my performance during the first phase of the Swap Out project for DIGITEL in Venezuela, Iwas promoted as BTS ENGINEER and Coordinator/Trainer for ZTE Installation Wireless Team Engineersand it makes me take charge of logistic for GSM and UMTS installation supervision; leader the supervisors team during the Swap Out process; to give support and solution to the client for troubleshooting and alarms solution for 2G and 3G; coordinate installation teams; fallow and keep the ZTE ZXSDR BS8700 BTS installations. In charge of CLEAN UP s and ATP process for DIGITEL stations involved in the Swap Out and NOKIA (Ultra Site BTS) and ERICSSON (Node BTx and Energy) equipment turn off after the SWAP OUT process. One of the most vital assignments in my hands was the Tx check from site to BTS-BSC/RNC via E1 (Iub)to FIU/BNC PLUG IN UNIT in order to have the correspondent path for the Integration of each Cluster s station to obtain the best efficiency for the Swap Out in every station of each cluster.

At the same time and as a personal improvement into my professional duties during the Swap Out Project, I collaborate with Optimization Team checking Antenna Power, Cell ID, Crossed Sectors and else using a testing cell phone.

ZTE BTS Engineer:since Aug 2010 to March 2011.

Responsibilities:

As Wireless Engineer my duties were to take care ofGSM/UMTS ZXSDR BS8700 BTS Installation supervision and integrator for ZTE equipment (BBU, RRU, Optical Fiber, Energy, grounding, standards and details), solve alarms and Tx problems between site-BSC/RNC. Improving my knowledge and professional performance I worked with Test Cell Phones to verify power, sectors, Cell Id, etc. according to Optimization Team giving support and learning about this branch of the RF duties. Above that, I was in charge of uninstallation of Nokia Ultra Site BTS and Ericsson RBS 3000 (BTS, energy, antenna line installation, etc) after Swap Out. As Wireless Engineer I gave Supervision support on ZTE BCS and ZTE ITC installation for DIGITEL SWAP OUT PROJECT in DIGITEL MSC LECHERIAS and DIGITEL MSC PUERTO ORDAZ for SS, Power Supply connection and OF dispatch.

Achievements:

Successfully I participated in implementation for more than 260 ZTE GSM/UMTS ZXSDR BS8700 BTSfor a DIGITEL SWAP OUT GSM-UMTS NOKIA-ERICSSON/ZTE Project during2010-2011.

COMPANY: Axe Telecom.

Field Supervisor:since Feb 2009 to June 2010.

Responsibilities:

Being part of the Engineering Team for AXE TELECOM, I was assigned with vital activities for telecom project and performance such as Site Survey realization, Carrier Detection handling and analyzing using specific equipment (ADVENTEST U3771 and HP 3771 spectrum analyzers). I have participated directly as installer and Team Leader for in Antenna line installation, tower and telecom rigger, gathering and analysis data about GSM, 3G,UTRAN and 2G projects for DIGITEL, MOVISTAR and MOVILNET in Venezuela. Approved courses in NSN VENEZUELA BTS installation, commissioning, integration and troubleshooting for FLEXI EDGE (2G), WCDMA BTS(ESMA, FFDA, FFMD, EOCA, ESEA, RF MODULE, OVP, FLEXI EDGE BTS MANAGER, WCDMA BTS MANAGER, etc), ELTEK 2, MINI ELTEK and ANTENNA LINE installation, ERICSSON RBS 2000/3000/6000 and MINI LINKHC/TN INSTALLATION/COMMISSIONING, acceptation tests process (ATP)and troubleshooting (Loss of incoming signal, BER test, LCT, FAN alarm solution, ML Failure Report, PFU1 and PFU2 cable assembling, Pin connection check, etc) in order to solve problems or improve network usage NODE B INSTALLATION/COMMISSIONING and ATP. I have been supervisor for ELTEK/ELTEK2/MINI-ELTEK POWER SYSTEM installation, MARCONI s LONG HAUL, MINI LINK HC/TN RADIOS INSTALLATION/COMMISSIONING.As Field Engineer I did more than 20 E/// RBS 3000 (3518, 3418, 3018) outdoor, indoor installation, commissioning and troubleshooting done for CANTV and MOVILNET.

LUCENT CDMA MODCELL 4.0indoor HARDWARE, antenna, cable guide, connector installation and hardware troubleshooting during the hole projects because of MOVILNET has CDMA platform.

Achievements:

Participation as Data Filed Collector, Installer and Filed Engineer in:

ºPROYECTOS UTRAN 2009, UMTS 3G, PROYECTO 3G, BACKBONE for DIGITEL in Carabobo, Aragua, Lara and Yaracuy states in Venezuela.

º PROYECTOS MODERNIZACION 2008 and 2009, PLAN CALIDAD 2009, for MOVILNET in Gran Caracas Region, Miranda and Vargas states in Venezuela.

º PROYECTOS SDH, 3G in Gran Caracas and Vargas state for MOVISTAR.

Proyecto UTRAN DIGITEL 2010 (BTS NOKIA FLEXI EDGE-WCDMA) Caracas, Venezuela.

COMPANY: INSTITUTO DE FERROCARRILES DEL ESTADO.

Field Engineer/Telecommunication Analyst: since Apr 2007 to Oct 2007.

I was in charge of inspections and collaboration during planning and installing of O.F. Design, standardization and cabling of LAN and intranet in some train station. I used to find locations for possible radio stations. I have worked in Data gathering and analysis about RF systems for railway. I have done research for PABX tests.

Achievements:

Participation as Data Filed Collector and Filed Engineer in:

º DATA NETWORK DESIGN FOR TRAIN STATION BARQUISIMETO.

º DATA NETWORK DESIGN FOR TRAIN STATION PTO. CABELLO.

º RF EQUIPMENT GATHERING INFORMATION FOR TRAIN BRANCH CARACAS-CUA.

º PLANINNG AND STUDIES FOR TELECOM LINKS NEEDED FOR TRAIN BRANCH CARACAS-CUA.

COMPANY: TELEFONICA VENEZUELA.

Telecommunication Analist. Feb 2007 to Apr 2007.

Working at the Interconnection Billing ManagementI faced several duties using specific data tools in order to solve problems and improve Handling, analysis, supervising and design for billing process interconnection in MOVISTAR.

Education

Major Degree

System Engineer. UNIVERSIDAD NACIONAL EXPERIMENTAL POLITECNICA ANTONIO JOSE DE SUCRE. “LUIS CABALLERO MEJIAS” in 2006.

Courses

COURSE

INSTITUTE

DATE and TIME

Adult and Pediatrics First Aid/CPR/AEDCERTIFICATE

AMERICAN RED CROSS. Florida, USA.

Nov 2014. 6 hours

LTE OSS Integration CERTIFICATE

ERICSSON VZLA

May 2014 24 hours.

TRABAJO SEGURO EN ALTURACERTIFICATE

VITAL ELEMENT

Dec2013 8 hours.

E/// RBS 6000 WCDMA, LTE ASP CERTIFICATE

ERICSSON VZLA

May 2013 24 hours.

ADVANTECH SATELITE SATNETMODEM IDUINSTALL, COM,INTEG

CANTV, CARACAS. VZLA

Feb 201224 hours.

VIASAT ODU INSTALLATION

CANTV, CARACAS. VZLA

Feb 2012 16 hours.

ERICSSON RBS 6000 Install, com, integ.

Ericsson Brasil, Sao Paulo

Oct 2011 32 hours.

EOMS/EFMS ZTE Manager

ZTE de VENEZUELA

Dec 2010 24 hours.

Install,Comm, Integ WCDMA 3G

Nokia Siemens Network Venezuela

Feb 2010. 48 hours.

Install,Comm, Integ FLEXI EDGE 2G

Nokia Siemens Network Venezuela

Feb 2010. 48 hours.

Install,Comm, Integ ELTEK 2

Nokia Siemens Network Venezuela

Feb 2010. 8 hours.

Antenna Line Standards

Nokia Siemens Network Venezuela

Feb 2010. 8 hours.

Carrier Detection

Axe Telecom

Jul 2009. 8 hours.

Intensive English Course CERTIFICATE

Florida Atlantic University

From Apr 2008 to Dec 2008.

CCNA

Muelles de Alejandria

In course.

Networking Course

UNEXPO “Luis Caballero Mejias”

Jul 2005. 40 hours.

Network Security

UNEXPO “Luis Caballero Mejias”

Jul 2005. 40 hours.

English Course

Centro Venezolano Americano

From May 1996 to Sep 1996.

Languages

Spanish: I am a native speaker.

English: I am proficient in English. I have an advanced reading and writing level. I have an excellent conversation level experience including technical terminology.

Portuguese: I have reading, conversation andadvanced telecom technician level in Portuguese.

Personal Referencies

Luis Toro +584********* ROCHE de VENEZUELA

David Henriquez +521********** WAVSYS

ANGEL ROMERO.

SYSTEM ENGINEER& RAN/WIRELESS.

I have plenty experience about GSM and WCDMA implementation, commissioning, integration and troubleshooting for E/// BASE BAND, RBS 2000, 3000, 6000 GSM, WCDMA, LTE (BB, DUG, DUW, DUL), MINI LINK HC-TN, MARCONI LH, ZTE BTS 8700, NOKIA Flexi Edge, WCDMA, LTE Nodes, NERA and ANDREWS RF Links, HUAWEI SERIES 3900/5900 (APM, RFC, MINI SHELTER) and others, E1 (Iub), cross connection and FIU Tx troubleshooting experience; so I have strong skills and knowledge to work as BTS/Wireless/Field Engineer. Because of my location I am able to work in the Caribbean, Central and South America. I have participated in more than 750 BTS, NODE B, RF LINKS, ADVANTECH VIASAT MODEM installations, commissioning, integration, ATP and troubleshooting.

I am working as Field Technical Support the TELEFONICA/E PLUS/O2 project WEST CONSOLIDATION in Germany for HUAWEI 2G/3G/4G/Tx. As Field Technician Support for T-MOBILE Network in South Florida, USA; for Nokia BTS (2G, WCDMA 2100, U1900, L700, CERAGON MICROWAVES, O&M, etc.), I was working with all technologies installed in Nokia BTS for this client such as Flexi Edge, WCDMA (FXFB, FXFC, U1900, etc), LTE (FRIG), antenna line equipment (TMA RFS, antennas Cell Max and RFS, RET motor RFS and Cell Max, etc), CERAGON Microwave Links, OVP s, ADVANTEST SPECTRUM ANALYZER U3771/3772 usage, etc.

Since November 2012 to October 2014 I was part of RAN Team at Ericsson Venezuela working with RBS 6000 (6102, 6101, 6201, 6301) GSM/WCDMA/LTE (DUG, DUW and DUL), RBS 3000 (3018, 3418, 3518), SIU, OMS 846 as commissioner, integrator, Tx, troubleshooter and ATP supervisor using software and tools all of this duties such as PUTTY, ELEMENT MANAGER, OMT, WIN FIOL, etc; I have worked with SCC02, GSM 2000, SCC05, 6101, 6102, 6301, BBS cabinets, etc; for projects such as Poyecto MOVILNET MODERNIZACION and Proyecto DIGITEL CARACAS FASE II. Additionally, I have worked in South America for several projects including BRAZIL for VIVO, EL SALVADOR for DIGICEL, PANAMA for CABLE & WIRELESS, T-mobile projects and O&M, TELEFONICA in GERMANY. LUCENT CDMA MODCELL 4.0 indoor HARDWARE, antenna, cable guide, connector installation and hardware troubleshooting during the hole projects because of MOVILNET has CDMA platform.

As BTS/Wireless/Field Engineer working for several projects the 3 mobile operators in Venezuela (DIGITEL, MOVISTAR, MOVILNET) and VIVO operator in Brazil, being installation, integration and troubleshooting my most relevant advantage during my intense professional career in telecommunication; I have had plenty experience in implementation, coordination, as trainer and Swap Out projects (I worked in Venezuela in a 2G and 3G Swap Out project for DIGITEL operator with more than 450 sites to be swapped out during more than a year).Installation, handling and information gathering about NOKIA ULTRA SITE, commissioning, integration and troubleshooting for FLEXI EDGE (2G) and WCDMA BTS (ESMA, EOCA, ESEA, RF MODULE, OVP, FLEXI EDGE BTS MANAGER, WCDMA BTS MANAGER, etc) during the project NSN - Proyecto 3G Digitel Venezuela. SITE SURVEY, supervision and installation for HUAWEI BTS 3606E-450; grounding, power, floor anchor and hole indoor installation for this CDMA equipment.

At the same time, during more than 4 year I have been working with Power System for RF, 2G and 3G sites in SS, Siemens Power Supply, AC Panel, DC panel, ZTE BTS 8700 Power System, Ericsson RBS 3000/6000 Power and Batteries bank installation, Eltek, Mini Eltek, Eltek II installation standards, handling, configuration and troubleshooting; you can even check this in my Resume (Courses), it show I approve Eltek II course in NSN Venezuela in 2010. Motor Generators troubleshooting during DIGITEL SWAP OUT project in Venezuela 2010-2011. Because of my job performance during the last 13 years, I am very used to travel all the time in order to finish my duties efficiently and professionally. You are able to kindly check my profile on line in http://www.linkedin.com/profile/view?id=52913239&trk=tab_pro

Angel Romero P.

System Engineer & RAN/Wireless

adjlld@r.postjobfree.com

Number: +34-603******



Contact this candidate