Jeffrey T. Aube
The Woodlands, TX ***** 281-***-****
***********@*****.***
Senior Midstream and Upstream Project Manager
Senior Engineering and Project Management professional with more than fifteen years’ experience managing all aspects of planning and executing multiple and concurrent Capital and Expense engineered construction projects for Midstream and Upstream Storage Terminals, Pipelines, and Facilities.
Leader and mentor skilled in establishing, maintaining and controlling Scope, Schedule, and Budget for multiple, concurrent projects from initial discussion with the Project Sponsor, from Management of Change through Commissioning.
Direct and straightforward communicator with twenty years of boots on the ground Engineering and Construction experience in Operations, Engineering and Construction. Trained in Civil and Mechanical Engineering through formal education and experience. Exempted from F.E. exam. Accepted for P. E. exam, October 2017.
Much experience organizing and leading multi-disciplinary, cross functional teams with strict emphasis on Safety, Corporate Codes and Regulations; and building, with pride, to the satisfaction of the Stakeholders.
Areas of Expertise and Direct Accountability of Engineering and Project Management skills include:
Internal and Third-Party Engineering, Contractor and Equipment Vendor management, and evaluation
MLP Forecast and Accrual Reporting
API 650 and 12f New Storage Tanks Construction and Repair
Senior level Manager of Industrial Engineered Construction
Front End and Final Cost Estimates
Scope of Work and Bid Documents Preparation for all Trades
Constructor and Equipment Bid Analyses
Authorization for Expenditure
Young Engineer Mentor
SAP, Maximo, Excel, Word, Primavera
Project Management Training
MS Project
Field Construction Management
Developed Cost Control Spreadsheet
PROFESSIONAL EXPERIENCE
XTO/ExxonMobil, Midland, Texas 2019/2020
Area Engineer, Midkiff Endeavor
Responsible for Tank Battery, Pipelines, and Facilities Engineering and Construction for the Midkiff Endeavor Area. Managed multiple concurrent Design and Build Capital and Maintenance projects from concept through close out. Performed hydraulic calculation for sizing gas, oil, and emulsion pipelines. Responsible for Basis of Design; Scope, Schedule and Budget. Prepared project cost estimates. Created Authorization for Expenditure (AFE); and Bill of Materials. Specified fit for purpose pipe, valves, fittings and equipment; and all materials of construction. Prepared construction bid documents and created project in SAP. Provided preliminary layouts, plot plans, and General Arrangements. Evaluated Bids; and selected construction team contractors. Worked with XTO/ExxonMobil Construction Foreman on a daily basis from mobilization through completion to ensure strict adherence to Safety, Scope, Schedule, and Budget. Organized and led the Pre-Start Up Safety Review (PSSR), and Project close out documentation.
HMT Tanks, The Woodlands, Texas 2018/2019
Senior Project Manager API 650 New Tanks and Repair and Maintenance, Central and Gulf Region
Responsible for API 650 New Tank construction; and Repair and Maintenance projects. Managed eight Project Managers from regional offices. Managed new tank construction. Directed and accounted for Scope, Schedule, and Budget for all projects; responsible for Estimating Reviews; Cash Flow Documents, Constructability Reviews, Training and Mentoring Project Managers; and management of subcontractors. Managed up to twenty concurrent API 650 New Tank Construction projects across the regions for multiple clients. Involved in many Repair and Maintenance projects including Geodesic Dome Construction, In Service Seal Repair, and Internal Floating Roofs/Seal installations and repairs.
Canyon Midstream Partners, Houston Texas
Senior Project Manager 2017/2018
Responsible for organizing and performing Capital, Maintenance, and Turnaround projects at a midstream facility located in Goldsmith, Texas. Responsible for all engineering, budget estimate, project management and construction for a Facility Upgrade project involving new tank construction; pressure vessel fabrication and construction, and improvements to processes. Managed more than twenty contractors of all trades with more than one hundred personnel. Reporting to the Division Operations Manager managed communications with multiple stakeholders, third party engineering and constructors from concept through close out. Directed Management of Change, Process Hazard Analyses Pre Start Up Safety Review Commissioning and Start Up. Directly accountable for establishing and maintaining Scope schedule and Budget.
Devon Energy (contractor), Artesia, NM 2017
Senior Facilities Project Engineer
Responsible for optimization engineering, budget estimate, project management and construction for an Optimization project involving one hundred and twenty production batteries. Reporting to the Division Facilities Manager; and communicating with multiple stakeholders, third party engineering and constructors from concept through commissioning to enhance production; and upgrade venting/ combustor/flare systems as required.
PHILLIPS 66 MIDSTREAM, LLC (contractor), Amarillo, TX 2016 – 2017
Senior Pipeline and Terminals Project Manager
Project Manager for multiple, concurrent capital and expense projects for Facilities, Products and Crude Storage Terminals, DOT and non-DOT pipelines, and remote storage tank stations.
Typical Projects:
Project Manager of Fit-for-Purpose, Ready-for-Construction Drawings, Specifications, and Bid Documents for a new API 12f crude petroleum Storage Tank Farm in New Mexico. Managed Construction from Management of Change through commissioning and handover to Operations.
Served as Project Manager and Engineering and Construction expert for procurement and installation of multiple API Tank, Pipelines and Infrastructure projects including pumps, PLC and Controls, and tie-ins to
DOT 192 Pipeline systems and related valves, fittings, electrical units and instrumentation.
Project and Engineering Manager for Reverse Flow of DOT 192 Pipeline “Line O”, and acquisition & installation of two new 700 h.p. booster pump starters; upgraded the existing electrical utility power service to 4160v, installed new disconnect and pad mounted transformers and procured new PLC and controls, building modifications & sump installations at the Briscoe Station facility.
Key Accomplishments:
Successfully managed and completed multiple division capital and expense projects aggregating $35 million in annual expenditures.
Designed and developed internal Cost Tracking System for establishment, maintenance and control, of multiple, concurrent projects utilized for accurate, weekly forecasts and accruals for more than twenty projects at varying stages of completion.
OCCIDENTAL PETROLEUM INC., Houston, TX 2012 – 2015
Senior Facilities Project Engineer
Senior Project Manager and Engineer responsible for the safe design & construction of over thirty production surface
oil & gas facilities and sales point connections in New Mexico and Texas.
Operational Duties:
Designed and Constructed multiple production and storage systems and facilities to company standards and specifications.
Responsible for Basis of Design, Authorization for Expenditure, Management of Change, Front End and Final estimates, Process hazard Analyses, Pre-start Up Safety Review, Crew Training and Commissioning
Key Accomplishments:
Led on-time approved construction of Red Tank 28-3 project, including procurement and installation of API crude storage tanks, transfer pumps and electrical and instrumentation, fire protection systems.
Managed Brownfield project in Odessa, TX for upgrades to Field Production and SWD Batteries, including enhancements of six API crude storage tanks, transfer pumps, Schedule 80 ANSI 900 pipe valves, fittings, PLC and controls, and new electrical power services and equipment; new access roadways and environmental remediation.
Provided expertise on Midland, TX Greenfield Project, involving Production and SWD Batteries. Engineered and constructed three Central Tank Batteries and SWD Batteries. Typical Equipment included 8 x 20, and 6 x 20 three phases Separators, heater treaters, storage tanks, gun barrel tanks, transfer pumps, PD Pumps, LACT Units & Multi stage centrifugal pumps; handled supporting Electrical and Instrumentation Systems.
Responsible for Management of Change, Process Hazard Analyses and Pre Start Up Safety Review, ensuring employee, contractor & environmental safety.
KINDER MORGAN MARINE TERMINALS, LLC, Carteret, NJ 2006 – 2011
Senior Project Engineer
Senior Project Manager for major & small capital and expense Terminals & Pipelines projects throughout Northeastern United States at five Marine Terminals and one Bulk Terminal. Provided organization and leadership of engineering & construction efforts for liquids storage tanks facilities; docks and structures, pipe bridges, roadways, tank farm containment & impermeable liner systems, marine flares, cargo pumping systems and electrical substations.
Operational Duties:
Supported engineering, procurement and construction of two API 650 storage tanks facilities projects at Perth Amboy, New Jersey and Carteret New Jersey Terminals, including existing tank modifications, inspections and new construction.
Conducted infrastructure improvements such as pipe supports and bridges, main cargo pumps and piping arrangements & foundations at multiple Terminals.
Managed engineering and construction for roadways & gates, wastewater & utility systems and critical fire protection systems.
Effected waterfront repairs and new construction for dock and wharves, cranes & hose handling equipment, and performed key rebuilds & new installations.
Key Accomplishments:
Senior Engineer and Project Manager for tank farm infrastructure projects in the Northeast.
Effected successful Marine Flares- Installation and start up at Perth Amboy and Carteret, NJ facilities.
Managed fast track construction of a new 26kva Electrical Switchgear Station and nine affiliated Electrical Substation repairs.
Successfully Engineered and managed many tank farm infrastructure improvements including Dredging, impermeable liner systems, marine dock and wharves.
Additional experience as Project Manager of Engineered Construction at AMEC Foster Wheeler on behalf of Chevron, Shell Motiva and BASF;
and as an Engineering Construction Manager for various Construction firms
EDUCATION & CREDENTIALS
Bachelor of Science, Marine Transportation, Maine Maritime Academy, Castine, ME
AS Mechanical Engineering, Northeastern University, Boston, MA
Accepted for Professional Engineering Examination, October 2017
Granted Exemption from Fundamentals of Engineering Examination
PMI Test Certification- December 2017
TECHNICAL PLATFORM & SOFTWARE PROFICIENCIES
SAP, Oracle, Maximo, Primavera, MS Project, MS Excel, MS Word, MS PowerPoint, Project management Training at: PMI, Kinder Morgan, Occidental Petroleum, Phillips 66 Midstream