Fifteen (**) years of extensive
experience in engineering and
construction works in Dubai, United
Arab Emirates as Sr. QA/QC
Engineer, with a solid background in
Quality Assurance/Quality Control
System with different stages of
Construction High Rise Buildings
Airport, Hospital, Mall projects and
steel fabrication from start-up to
completion of the project.
Nine (9) years of work experience
in Philippines, as Lead QA/QC
Engineer assigned in projects like,
Philippine International Airport
Terminal-3, 54-Storey Asia’s Best
Pacific Plaza Twin Towers, Hospital
Building, Shopping mall, School
Building and 16-Storey High-end
residential community towers
Bachelor of Science in Civil
Engineering
University of the East, Caloocan City
Philippines
Quality Assurance / Quality Control
System
Material – Review of Submittals and
Material Inspection
Quality Reports
Expert in Template/Format
preparation
Document System
Internal Audit
Supervision and Coordination
Client / Consultant Coordination
Project Completion and Handover
Snagging and De-snagging
BIC CONTRACTING LLC (Formerly Habtoor Leighton Group) P.O. Box 10869
Dubai United Arab Emirates
Period : May 2005 to 29 Feb. 2020 (almost 15 years) Sr. QA / QC Engineer February 2012 –February 2020
Project: JEWEL OF THE CREEK
Package 7- Substructure works 4 level Basements
Package 8-5 Hospitality Buildings (A1 to A5)
(Hotel & Service Apartments), Basements, Marina and External Works
By :BIC Contracting LLC formerly HLG Contracting LLC Client: Dubai International Real Estate
Consultant: Kling Consult – Kierferle & Partner
The Jewel of the Creek project development is located in Plot 129-104, Port Saeed, Deira, Dubai and it comprises Five (5) buildings (G+19 Floors)– A1 is to be a 5 Star Hotel Building, A2 to A5 are Serviced Apartments. With Marina and External Works QA/QC Engineer May 2010 – February 2012
Project: THE BUILDINGS by DAMAN
65 Floors (Residential, Hotel, Commercial and Offices) By : Habtoor Leighton Group
Client: Daman Real Estate Capital Partners Ltd.
Consultant: Arif & Bintoak
The Buildings by Daman project is a development located in the Dubai International Financial Center (DIFC) and it comprises an L-shaped block composed of two buildings of different heights intersecting and overlapping each other.
QA/QC Engineer June 2009 – May 2010
AL HABTOOR STEEL FABRICATION DIVISION
Al Quoz Industrial Area # 3
By : Habtoor Leighton Steel
The Company constructs and develops civil infrastructure, buildings, rail infrastructure, oil and gas projects, and mining projects. Al Habtoor Leighton serves public and private customers throughout the United Arab Emirates and the surrounding region QA / QC Engineer October 2008 to June 2009
Project: 63-Storey-Trump International Hotel and Tower By : Al Habtoor Engineering and Murray & Roberts
Client: Nakheel
Consultant:WSAtkins
The project was proposed 62 Storey skyscraper hotel and residential complex at the trunk of the Palm Jumeirah in Dubai. This building and other prestigious building projects throughout Dubai in late 2008 were cancelled, largely as a result of the global crisis. Al Habtoor Engineering and Murray and Roberts Constructed the Foundation of the Building only.
Analiza L. Monzon
Al Satwa, Dubai, United Arab Emirates
adjicq@r.postjobfree.com
Sr. QA/QC Engineer- Civil
Professional Experience / Education
SUMMARY OF EMPLOYMENT
Professional Profile
Education
Areas of Expertise
2
Knowledge in:
ACONEX
Wrench
Premavera Expedition
Power Point
Quality Systems
MiS Office
QA/QC Engineer May 2005 – October 2008
Project: Dubai International Airport Expansion Phase-II Terminal 3, Concourse II & Car Park
By : Al Habtoor, Murray& Roberts Takenaka Joint Venture Client: Dubai Civil Aviation (DCA)
Consultant: DAR Al Handasah
The Project contract involved the construction and fit-out of Terminal 3, Concourse 2 and a car park at Dubai International Airport. including a multi level underground structure, first and business class lounges, restaurants
Responsible for the preparation, implementation, monitoring, revision and updating of the Project Quality Plan (PQP)
Conduct internal audit in the project Monitor the implementation of the Management System.
Prepare Report for the performance status of Project Quality activities (KPI) to the Group Quality Manager and Project Director every month
Review the Suppliers / Sub-contractor’s Pre-qualification documents, Method Statements, ITPs, Material Submittals, and Test Reports and make sure that it complies with the Project’s Specification and Contract Requirements.
Preparation of Inspection and Test Plan (ITP).
Prepare all the Quality Reports
Coordinate and communicate with Client on Project Quality issues.
Attend all Quality related meetings
Monitor and ensure that all the project documents are filed and saved in relevant folders
Coordinate all QA/QC activities with the Site Team and Quality Engineers
Issue non-conformance report when the specifications or the project requirements are not met
Prepare project forms and check sheets.
Development, preparation, implementation and monitoring of all projects Specific procedures, Manual
Responsible for receiving, analyzing and distribution of client Non-Conformance Report (NCR); Coordinate with Construction Team, Subcontractors, Quality Engineer’s and Consultant for closing the NCR.
Produce and develop the Project Quality Training Plan. Ensure implementation of the plan. Ensure that training records are maintained.
Action and close all customer complaints
Prepare report for project management review meeting/ attend and prepare minutes of meeting.
Prepare presentation/workshop and conduct Quality Induction and Quality Tool Box Talk
Supervised Document Controllers in QA/QC Department
Conduct Snagging Inspection
Prepare snagging system (updating and monitoring the list) and prepare report to the Construction Manager and Project Director
Monitor Concrete Pouring, Conduct Site Inspection
Act as Assistant of QA/QC Manager
Performs related duties as assigned or required to meet company goals and objectives.
Material
Set-up the project material procedure and inspection process.
Review the Material Submittal make sure that it complies with the Project’s Specification (Approved Vendors List) prior to submission to Consultant.
Coordinate with the Subcontractor’s & Supplier’s regarding the material submittal requirements and material delivered inspection procedure
Critical and Creative Thinking
HLG Construction Education
Training Academy
Al Quos, Dubai, UAE
July 2013
Internal Quality Management
System
“Audit Training Course”
Al Habtoor Engineering Training
School
Al Quos, Dubai UAE
December 2009
ISO 9001:2000 QMS
Al Habtoor Head Office Training
Room
Dubai UAE
April 2008
Technical Skills
Training and Courses DUTIES AND RESPONSIBILITIES
3
Review and sign the Material Inspection Request from Subcontractors
Conduct inspection of materials with the consultant prior to installation
Evaluate material test reports prior to submission to consultant
Supervise site laboratory Staff
Coordinate to Testing Laboratory Agency regarding all material testing in the project.
Hand Over and Project Completion
Prepare Project Completion Plan
Prepare Project Snagging Plan
Prepare Project Deliverable Dash Board and Submit to client by weekly
Operation & Maintenance Manual-Review and Monitor the submission to client
Coordinate with the client regarding other Project Completion requirement
Attend weekly completion meeting with Consultant and client (prepare minutes of meeting)
Project Overall In-Charge for Snagging using Lagos PM software
Conduct Snagging and De-Snagging
Managed NCR Closure meeting with Subcontractors, Consultant and Clent Makati Development Corporation January 2003 to April 2005 Ayala Alabang, Muntinlupa City, Philippines
Lead Quality Control Engineer
Project: Market! Market!
6th Storey Retail Mall With 7 Cinema
11 Hectares lot area
Fort Bonifacio, Global City Taguig City, Philippines Project: Serendra
16-Tower High-End Residential Community
Fort Bonifacio, Global City Taguig City, Philippines EEI Corporation October 1997 to January 2003
12 Manggahan St. Libis Quezon City Philippines
Senior QC Engineer II
Project: Pacific Plaza Towers Project – A 54 Storey Twin Towers Fort Bonifacio, Global City Taguig City, Philippines Project: The New Medical City Hospital Project
Meralco Compound, Ortigas Ave., Pasig City, Phils. Project: Ninoy Aquino International Airport- IPT3
Under the supervision of TAKENAKA CORPORATION
Andrews Ave., Villamor Air Base, Pasay City, Philippines BF Corporation Construction Division February 1996 to August 1997 Jollibee Bldg., San Miguel Avenue, Pasig Philippines Material Engineer/Quality Control Engineer
Project:WACK-WACK Heights
A 6 -Storey Cluster & 18-Storey Residential Bldg.
Project: The Makati Prime City Towers
A 18 Storey Twin Towers commercial Bldg.
St. Paul St. San Antonio Village, Makati City
SUMMARY OF EMPLOYMENT - PHILIPPINES
4
Lead the Quality Control Department; Conduct Inspection of structural and architectural works, to ensure the quality of workmanship and installed materials conforms with the specification;
Setting the overall goals of the Quality Control Department in terms of quality performance,
In-charge/witness all material testing (concrete, steel bar, CHB, Field Density Testing, etc.);
Issue of non-conformance reports when the specifications or the procedural requirements are not met;
Ensures accurate and timely submission of results of materials testing to all concerned;
Monitor concrete pouring; Conduct receiving inspection of materials prior to installation;
Conduct punch listing on structural and architectural works for project close-out; Monitor balance of work;
Evaluate supplier’s monthly billing as to corresponding result to quality requirements;
Prepare Quality Report (Weekly & Monthly);
Prepare Field Operation Rating as basis of quality implementation in the project; generate QCIR’s (Quality Control Inspection Report) and other document needed to project close-out;
Inspects/visit concrete and steel batch plant in conformance with the project requirements;
Responsible for the control of all the incoming and out-going documents for QA/QC Department;
Regular checking and updates of all submittal logs and Provide necessary actions for delayed submittals;
Oversees safekeeping, filing, receiving and release of QA/QC documents;
Performs related duties as assigned or required to meet company goals and objectives.
Birth Date : 11 July 1971
Birth Place : Kawit Cavite Philippines
Sex : Female
Marital Status : Single
Religion : Roman Catholic
Nationality : Filipino
Passport No. : P4871460B
UAE Driving License : 1035576
epcsspecs.
Found three design flaws in ongoing projects,
preventing catastrophic failure.
Headed local playground design and project
management for $60,000 project.
DUTIES AND RESPOSIBILITIES
PERSONAL DATA