Page *
Kenneth E. Niznik
St. Cloud, FL 34771
adjhl5@r.postjobfree.com
Immediate Objective: To enhance and utilize my skills as a Heavy Highway Superintendent. Career Objective: To further my education and skills progressing upwards in Management. EXPERIENCE PROFILE
August 2018 - Present
Granite Construction Inc. 1302 North 19th Street, Tampa, FL. 33605 Superintendent over MSE Wall Construction on the I-4 Ultimate Project in Orlando Florida Superintendent for Bright Line / Virgin Trains Project – Cocoa, Florida Duties include developing site setup for personnel offices and staging yard Running crews for MSE Walls and Piano Walls
Reliable to oversee Pile Driving, Roadway, Carpentry, Storm Drain and Clearing/Grubbing crews. July 2012 - August 2018
PCL Civil Constructors, 5440 Wade Park Blvd, Raleigh, NC 27607 Survey Manager, QC Manager, General Foreman.
Various responsibilities and roles starting with every aspect of surveying, combined with running heavy equipment, excavation and grading, erecting structures and MSE walls, and most current forming, pouring and stripping bridge decks and diaphragms. Experienced with Bidwell machines and different placing equipment as well as concrete testing.
May 2011 - April 2012
AEI-CASC Engineering Inc., 937 S. Via Lata, Colton, CA 92324 Survey Party Chief specializing in Topographic and Boundary surveys, Layout of all above and underground utilities. Commercial and Residential Development, and Public Works Projects. August 2009 - January 2011
Mid Valley Engineering Inc., 126 Dyer Rd, Santa Ana, CA 92707 Survey Party Chief specializing in Construction stake-out for multi-story buildings, Landfills, Public Works Projects and Heavy Highway Projects.
April 2004*** - May 2009
Pardue, Cornwell and Assoc., 18551 Von Karman Ave, Irvine, CA 92532 Senior Survey Party Chief for a civil engineering firm serving Southern California, Orange, Riverside, and San Bernardino Counties, Palm Springs, and Palm Desert areas. Duties include all surveying aspects of land surveying: topo, ALTA’s, boundaries, traverses, field control set up, first order levels, construction stakeout including curb, buildings, houses, sewer, water, storms drain, fine and rough grade, and slope staking, cut sheet calcs and reductions, and certifications and asbuilts. Page 2
June 2005 - April 2006
PCL Civil Constructors, 202 N East Ocean Blvd, Stuart, FL 34996 Survey Party Chief for a heavy highway construction firm ranking among the largest in the United States. Duties included all surveying aspects of construction stakeout for bridge erection and heavy highway: topo, traverses, levels, field control establishment, pile layout, pier and girder placement, deck grades, cut sheet calcs and reductions, and asbuilts.
June 2002 - March 2004
Penco Engineers, One Technology Drive, Irvine, CA 92618 Survey Party Chief for a civil engineering firm serving Southern California, Orange, Riverside, Los Angeles and San Bernardino Counties.
Duties included all surveying aspects of land surveying: topo, ALTA’s, boundaries, traverses, field control set up, first order levels, construction stakeout including curb, buildings, houses, sewer, water, storms drain, fine and rough grade, cut sheet calcs and reductions, and certifications and asbuilts. June 2000 - June 2002
DCK Worldwide, P.O. Box 10896, Pittsburgh, PA 15236 Survey Party Chief and Contract Construction manager Duties included all surveying aspects of construction stakeout for bridge erection, heavy highway and stadium erection: topo, traverses, levels, field control establishment, construction stakeout including curb, buildings, houses, sewer, water, storms drain, fine and rough grade, pile layout, pier and girder placement, deck grades, cut sheet calcs and reductions, and asbuilts.
August 1991 - June 2000
Monaloh Basin Engineers, Campbells Run Business Ctr, 300 Business Ctr Dr. Pittsburgh, PA 15205. Survey Party Chief for a consulting engineering firm serving the state of Pennsylvania. Duties included all surveying aspects of land surveying: Topo, ALTA’s, boundaries, traverses, field control set up, first order levels, construction stakeout including curb, buildings, houses, sewer, water, storms drain, fine and rough grade, cut sheet calcs and reductions, and certifications and asbuilts. June 1987 - January 1991
Charles P. Johnson & Assoc., 1751 Elton Rd, Silver Spring, MD 20903 Transit and Chainman for a civil engineering, land development firm serving the state of Maryland. Duties include assisting the party chief, equipment and truck maintenance, operating various levels, transits, and general survey equipment, note reduction and calc checks. June 1986 - June 1987
Phoenix Construction, 229 Commerce St., Beaver, PA 15009 Carpenter/ Laborer
Duties included rough and finish carpentry, concrete, drywall, tile, painting, wiring, plumbing, and roofing. Basically all aspects of building spec homes and general remodeling Page 3
CERTIFICATION PROFILE
• Bidwell Training School-2017
• OSHA 30 Safety-2010
CPR Certification-2019
Lean Sigma Training 2020-15 Hours
EDUCATION PROFILE
Robinson Community College
(Robinson, PA)
Basic Surveying Mathematics
Center High School
(Monaca, PA)
Graduated top 25 out of 365 students
REFERENCES
Jerry Anhorn Owner / Anhorn & Associates 714-***-**** Jim Schneiderman District Manager-Vice President / Flatiron 919-***-**** Dave Johnson Survey Tech / Tait Survey Tech 310-***-**** NOTABLE PROJECT HISTORY
Bright Line/Virgin Trains – Orlando / Cocoa, FL
I-4 Ultimate – Orlando, FL
Bonner Bridge – Outer Banks, NC
Lake Barkley Bridge – Cadiz, KY
Flint River Bridge – Albany, GA
I-4 Selmon Expressway - Tampa, FL
Ernest Lyons Bridge - Stewart, FL
Pittsburg Pirate Stadium – Pittsburg, PA