Mubashar Aziz
**************@*****.***
UAE 009**-*********
PAK 0092-300-***-****
PAK 0092-307-***-****
KEY LEVEL ASSIGNMENTS
~ Material Management Warehouse Management
Location Preference: UAE / Gulf Counties
Industry Preference: Oil & Gas / Construction
A versatile, high-energy professional with the distinction of executing prestigious projects of large magnitude within strict time schedules & cost
KEY SKILLS
Material Management
MIS Reporting
Process Enhancement
Stock Management
Resource Planning
PROFILE SUMMARY
Demonstrated abilities in managing warehouse operations involving requirement analysis, budget utilisation & dispatch to ensure timely achievement of organisational goals
Expertise in managing stock level at the warehouse by rejecting materials found non-conforming to identify a course of action for disposition of disclosed ones
Proficient in ensuring adherence to ASME, ANSI, API & AISI Standards and QHSE policy
Conversant with ERP System (Inventory Module), FAMS (Fixed Asset Management System), MMS Material Management System and ACCPAC Pro Series 7.3 SMART (System for Material Acquisition, Retrieval and Transactions),SAP(System Application and Products)
Effective leader with excellent motivational skills to sustain growth momentum while motivating peak individual performances
CORE COMPETENCIES
Inventory Management:
Conducting 3rd party audits & inspection for receipt & clarification of incoming materials to ensure their perpetual physical verification & reconciling the same against book stock of verified items
Maintaining a minimum inventory system for consumable & spares parts; generating all related MIS documents / reports on self-life, slow moving or capital equipment materials, after updating all indents
Warehouse Management:
Providing quality & timely support to project site staff in connection with stores, warehouse by complying with company & department policies, procedures & method statements
Overseeing the processes related to yield improvement & achievement in the store and maintaining stock level in construction & process industries through rejecting materials found non-conforming to identify a course of action
Process Improvement:
Identifying the areas of bottlenecks & breakdown at construction and taking effective measures to ensure smooth operations
Implementing operational techniques for reduction in cycle time & identification of improvement opportunities and cost reduction measures to achieve substantial reduction in project expenditure
Key Result Areas:
Handling the preparation of lay down area and organising all tools/tackles used at site basis job requirement
Creating work order wise material reservation as per base / variable scope
Verifying reserved material against actual quantity; sharing available stock status with planning department
Collaborating with planning department and clients and reporting discrepancies if any
Ensuring separate material for site and prefabrication
Checking rigging tools & equipment and area for lay down, safe custody & heavy items
Managing client material and ensuring its adherence to ASME, ANSI, API & AISI Standards
Preparing Tag basis reserved materials for each work order; handling tagging and bagging as per approved procedure
Maintaining issuance and return records and sharing the same with client
Moving all reserved material to site stores and looking after all types of control valves
Generating total store manpower requirement and mobilization schedule
Delivering balance material back to client and housekeeping at lay down area
Overseeing final reconciliation of material and hand over to client
Ensuring timely arrangement of material, inventory or equipment transport for primary as well as secondary movement in order to fulfil requirement as per defined schedule
Accomplishments:
Holds the merit of operating ERP System (Inventory Module) systems in the organisation to ensure proper documentation of receipts & invoices
Designed inventory reconciliation process which increased inventory accuracy.
Reduced time spent on the month-end inventory reporting process through effective usage of Excel and employing better data collection methods
PREVIOUS EXPERIENCE
APR,2013 TO AUGUST 2013: Haris Engineering Company., Pakistan as Material Handler
Project: Kadin Wari Gas Filed
Location:Disst KhairPur Sindh
August 2013 To January 2014. PCL Engineering Company, Pakistan As Material Coordinator
Project: Kadin Wari Gas Filed
Location:Disst KhairPur Sindh
January 2014 To July 2014. Pakistan Engineering Company, Pakistan as Trainee Supervisor
Project: Multan International Airport
Location: Multan,Pakistan
Sept 2014 To Mar 2017. F & S Engineering Company Pakistan as Material Coordinator
Project:FFCL,Pkistan
ORGANISATIONAL EXPERIENCE
Since October 2017: Descon Engineering, Abu Dhabi (UAE)
October:26 – To till Date Material Coordinator: (Client: Petrofac / ADNOC (UAE); Project: ZADCO Upper Zakum
UZ750 OFF Shore UAE
PROFESSIONAL ENHANCEMENTS
Trainings:
oSAP implementation training
oSafety Induction
oPersonal Safety and Social Responsibilities
oElementary First Aid
oFire Fighting & Self Rescue
oBasic H2S Training (OPITO Approved Course)
oInstallation & Lifeboat Evacuation
oTravel Safely by Boat (TSBB – OPITO Approved Course)
IT SKILLS
Well versed with the concepts of ERP System (Inventory Module), FAMS (Fixed Asset Management System), Material Management System,, ACCPAC Pro Series 7.3, MS Office Suite & Windows 95/98/NT/XP, SAP
ACADEMIC DETAILS
Inter (F.A) board of Intermediate Multan, Pakistan
Matriculation, board of Intermediate Multan, Pakistan
PERSONAL DETAILS
Date of Birth: 04-june-1995
Languages Known: English. Urdu and Pujabi
Current Address Descon Engineering, Post Box # 46821, Abu Dhabi Manufacturing Works-Ruwais
Permananet Address: Mian Channu,Dist Khanewal PAKISTAN
Nationality: Pakistani
Passport Details: CE1813342
Visa Details: Employment Visa
Marital Status: single