SRIDHARAN.E adjfgo@r.postjobfree.com Senior Engineer +91-759*******
Penukonda,Anantapur(A.P)
CAREER OBJECTIVE
As a Maintenance Engineer,I would utilize my latest expertise in developing electrical frameworks for the company, geared towards enhancing and maximizing reliability and performance.
PROFESSIONAL SKILLS
EHV spare forecast and to define the inventory level required for healthy operation.
EHV related technical change implementation tracking and supporting the site in implementation.
Support quality team in technical due to diligence audit of O&M of HV/EHV system.
To carry out preliminary inspection of major incidence of SS and lines.
To drive value engineering for reducing the cost of EHV spares.
To manage work of reinstallation of EHV SS and lines in case of major breakdown.
PROFESSIONAL EXPERIENCE
1.Wind world India Ltd., Mumbai. Sept 2020 – Till date Sr Engineer Projects:
220/33kV Pooling station,Shapuram Penukonda.
220kV Switching station,,Shapuram Penukonda.
2.Isosceles Sales & Service Pvt Ltd., Pune. Feb 2018 – Sept 2020 Engineer-II Projects:
765/400kV BDTCL-Bhopal,Agariya.
765/400 kV Vindhyachal PS, PGCIL Singrauli.
765/400/220 kV SS,PGCIL Satna.
3.JBS Enterprises Pvt Ltd., Mumbai.
Jun 2014 – Feb 2018 Engineer-III
Projects:
132/11kV MRSS, RRCAT-Indore.
220/33kV Reliance Industries,Silvasa.
110/11kV Sub station,Lavasa.
Key Responsibilities:
Guiding/leading the electrical maintenance team and implementing the best maintenance strategy for the EHV substation.
Had Cordial relationship with staff member to monitor all maintenance services while ensuring safety.
Evaluated PMR documents and documented technical specifications for electrical equipment.
Administered PPM tasks and suggested needed improvements for maintenance procedure.
Monitored backlog of maintenance processes and ensured compliance to all regulations and streamlined them.
Instrumental in electrical maintenance process and developed appropriate strategies to finish all the task in time.
Inventory of all control equipment’s and associate critical instruments for maintenance program.
Made risk assessment before starting any task to ensure safety.
Supervise maintenance associate on assigned shifts.
Timely calibration of devices to assure conformity of the specified and determined requirement level of the product.
Proactively identifying areas of obstruction, break downs and taking preventive measures to rectify the problems in equipments.
Ensuring all machineries work efficiently by conducting timely checks and maintenance measures.
Documentation Exposure:
Documented the standard operating procedures including maintenance plan, work instructions specification etc. and implement the same for effective operation.
Maintained log books/history cards/calibration reports to record operation and maintenance.
Prepare monthly/quarterly/half yearly/annual shutdown maintenance reports for top management reference and decision making.
HANDLING OF TESTING KITS
TANDELTA KIT Make: megger, Dobbel.
Testing Equipment: CT, grading capacitor of CB, Turrent CT,Bushing and Trafo winding.
TIMING KIT
Make: HISAC ULTIMA (SCOPE)
Testing Equipment: circuit breaker.
DCRM KIT
Make: DCRM ULTIMA.
Testing Equipment: circuit breaker.
CRM KIT
Make: CRM 200B+ (Scope).
Testing Equipment: Isolator, circuit breaker.
THIRD HORMONIC TEST KIT Make: SA30I+ (Scope).
Testing Equipment: lightning arrester.
AMP ACTIVITIES
Current Transformer:-Insulation resistance, winding resistance, ratio test, Tan delta test, Knee point current test, polarity test.
CVT:-Insulation resistance, winding resistance, ratio test, Tan delta test.
Isolator:-Insulation resistance, contact resistance measurement test, motor current and timing.
Lightning arrester:-Insulation resistance, checking of counter, third harmonic test.
Circuit Breaker:-Insulation resistance, contact measurement test, Dynamic contact resistance measurement, Timing test, purity checks of SF6 gas.
Transformer:-Insulation resistance, winding resistance, ratio test, Tan delta test for bushing and winding, open circuit test, Magnetic balance test.
Shunt Reactor:-Insulation resistance, winding resistance, Tan delta test for bushing and winding.
EDUCATIONAL QUALIFACTION
B.Tech in Electrical and Electronics Engineering.
Pondicherry Engineering College, CPGA of 7.52, First Class.
PUBLICATION
Sridharan.E, Elanseralathan.K,IsabelRobert,Prakash.K,AbhineshParthasarthy, “Diagnosis of accelerated insulation degradation due to switching of power electronics converters”, Annual International conference on Power, Energy and Electrical Engineering-2013.Pg 92-95.
ACHIEVEMENTS
Received an appreciation gift from PGCIL GM.
PERSONAL DETAILS
Nationality : INDIAN
Passport No. : L3784975.
Languages Known : Tamil, English,Hindhi.
Permanent Address : No.17, SouthStreet,Surakudy, Thirunallar, Karaikal.
Date: 22/10/20.
Place:Andhra pradesh SRIDHARAN.E