RESUME
ABHAY KUMAR MAURYA
Add: .ward no -**, near coal gate,
Gram – parasi, Post – Renusger
Distt – Sonebhadra, Uttar Pradesh -231218
Mob: 880-***-****, 914*******
E-mail: adjel0@r.postjobfree.com
CAREER OBJECTIVE
To work on a challenging job profile which provides an opportunity to enhance my technical skills and knowledge, this could provide me new aspects so that it would be helpful for my career.
Post Graduate Diploma in Advance Mechanical System (PGDAMS) from Prolific Systems & Technologies Pvt. Ltd., Noida UP.
PLC (Allen Bradley)
SCADA (Wonder ware In-Touch).
HYDRAULIC & PNEUMATIC SYSTEM
CENTRIFUGAL PUMPS
Diploma in AUTOCAD (2D&3D)
Mechanical site engineer:- different power plant working in Mechanical Maintenance Engineer
-Lanco thermal power plant (Anpara)UNIT 2( 600 MW) (1/10/2019- 30/10/2019)
- HINDALCO INDUSTRIES LIMITED RENUPOWER DIVISION(Renusager, sonebhadra)832 MW( 10 TURBINE, 11BOILER)
-HINDALCO INDUSTRIES LIMITED ( RENUKUT, SONEBHADRA)82.5MW(4/06/2020-7/07/2020)
-ESSAR POWER MP LIMITED (bandhura mp ) 1200 MW( 18/07/2020 TO present )
- ESP & BOILER PARTS( ECONOMISER, APH, SUPERHEATER, WATERWALL, DUGE HOUSE, CONVECTION, COAL BURNER, FEED PUMP )
- Scaffolding ( Bottom hopper to super heater zone)
- Safety ( permit -general, hot, confined, height, check sheet – Welding, cutting, door tag –red, yellow )
- Mill over hauling & also keep running pm of ( A to H)
- PM of LRSB, WALL BLOWER, HELICAL SOOT BLOWER
- ALL TYPES OF PUMP LIKE HFO, LDO
Role & Responsibility:-
ESP SIDE ;9(back filter cleaning and hopper cleaning)
Arrangement of safety induction program for every shutdown person which are come to working in plant.
Arrangement of all equipments used in side like, ( ceiling, dicycle, wire brush, rope, pully,hook, weighing Machine, Nozzle, Air Pressure Pipe)
First priority working on side providing PPE
Supervisee the back filter ( FF), those are divided in four parts ( Agra, Delhi, Mumbai, Kolkata).
Spring out the bags from hopper and check it weight (4.60 to 4.80 Kg)
Overall cleaning bags with minimum damage & minimum damage of cages outside safely .
After cleaning bags check weight ( 2.50 to 2.60 Kg).
Handling manpower with full dedication with zero Accident.
Seen the damper ( outlet /inlet), buffer plate, valves, gates, Gasket
Empty the hopper clearly with no harmful causes.
Checking the ESP PLATES
BOILER ;( BOTTOM HOPPER, SEAL TROUGH, COAL BURNER, FIRING STAGE, WATER WALL,ECONOMISE COIL, SUPER HEATER, CONVECTION TUBE )
# CONVECTION TUBE –( CHECKING, NUMBERING, CUTTING, GLOOZING, HAMMERING ON NIPPLE SIDE,INSERTED NEW TUBE, EXPANDING THROUGH EXPENDER MACHINE)
#ECONOMISER-(CASING PLATE CUTTING, DISCARD THE HEADER JOINTS TO UPPER HEADER, LOWER HEADER,TO SEPARATE SCALER BAR, HANGOUT THE COIL UPPER BANK AND LOWER BANK, SPACER, CHECK THE ERROSION,1 CHECK THE BEND &NIPPLE,DISCARD THE UPPER JOINT TO MIDDLE JOINT,CHECKING THE CASSETE BOX, CASSETE PLATE, CHECKING BUFFLE PLATE,DEMETERING THE COIL,THICKNESS INSPECTION COIL SHIELDING IF <5.0 mm BELOW, RADIOGRAPHY OF JOINT,check the welding Argon &Arc of joint, buffle plate check, V GRROVE )
#WATER WALL-(DIVIDED IN 4 TYPES TOP, MIDDLE, LOWER. BOTTOM EACH HEAVING 4 ZONE E, W, N,S, L R S B, S B, Reararch –economizer side Frontarch – super heater side, GRINDING THE TUBE, ERROSION CHECKING MOSTLY SOOT BLOWER SIDE DEMETERING THE TUBE, CHANGING THE ERRODED TUBE, JOINT THROUGH IBR – FIRSTLY ARGON THEN ARC WELDING, RADIOGRAPHY TESTING TO CHECK POROSITY OF METAL ANY DIPPEST HOLE TO OBSEVERED,THICKNESS MEASURMENT -3.4 mm to 5.0 mm, check the arch side )
#SUPER HEATER-(CLEANING THE PRIMARY AND SECONDARY SIDE COIL, CHECK THE SPECIAL TUBE WHICH CONNECTING TO CONVECTION LINE, BUFFING THE COIL THEN INSPECTION WITH DEMETERING, CHECK THE MALE & FEAMLE CLEAT, CHECK THE ORFIC, CHECK THE NIPPLE & BAND. CHECK THE REFRACTORY OF DUGE HOUSE SIDE, CLEANING THE DUGE HOUSE, )
# COAL FIRING –(COAL FEEDER PIPE HAVING OIL GUN, AIR PIPE, IGNITOR, COAL PIPE, NOZZLE TRIP, BUFFLE PLATE, CHECKING BEND AND TILES WHICH IS INSERTED TO REMOVE THE ERROSION AND EXPLOSION DUE TO HEAT OF COAL,CHECK THE BEND THICKNESS IN E,W,N,S CORNER BURNER TOP AND BOTTOM, )
EDUCATIONAL QUALIFICATION
Qualification
Institute/ School Name
University/Board
PassingYear
Percentage
MBA
(HR, MARKETING)
Bansal Institute of Engineering & Technology lucknow
Dr. Abdul Kalam Technical University
2021(Appearing)
64.21
B.Tech
Mechanical
Bansal Institute of Engineering & Technology lucknow
Dr. Abdul Kalam Technical University
2018
70.19
Intermediate
A.B.I.C
U.P Board
2014
69.90
High School
A.B.I.C
U.P Board
2012
81.20
PROFICIENT KNOWLEDGE
Seminars/courses
Attended seminar on Electric Power Plant Industries.
LED Light Assembly &testing Techinican in Three Monthes from N.S.D.C.
Some Computer skill in Excel, Power point, Word, ADCA.
Five days workshop on aerospace from s.c.i.d.c
Passedccc
The COSHH MANGER Certification
Personal Protective equipment Awarness
Health and Safety Induction
SUMMER TRANING& SITE VISITING
Two timesSummer Internship With Project Boiler Overview In Thermal Power Plant at HINDALCO INDUSTRIES LIMTED.
Coal received in coal yard Magnet, coal blending of diff source of coal, coal crushing in crushing yard, coal feeding to coal bunker, four roll crusher, Roller screen, Pipe conveyor and belt conveyor,
dust extraction plant . types of trippler – one way, two way, three way, seeing counter weight which used to belt on returning side maintain the belt return side, seeing zero speed switch
Dust suppression plant, auto coal sampling unit, vibrating feeder& coal yard, Ring granulator crusher, metal detector checker .
ONGOING PROJECT
Project undergoing
Project Tittle: Room Cleaning Robot
Technology Used: Automatic Remote Control
Description: Basically it is based on Automatic remote control project which is used in floor cleaning
PERSONAL PROFILE
Father’s Name : Mr. SANT LAL MAURYA
Date of Birth : 24/08/1997
Nationality : Indian
Status : Unmarried
Language : Hindi & English
Hobbies : Listing Music, Reading Magazine, News Paper.
DECLARATION
I hereby declare that above information’s are true the best of my knowledge and if found incorrect at my level my appointment shall stand cancelled.
Date
Place: (ABHAY)
TECHNICAL SKILLS
WORK &EXPERIENCE ( 2.6 year)(5/07/2018- present)