AYBEE SAGEE
Adress: Unit ***, Yonge street. Thornhill, Ontario, L3T 2B8
Email: ********@*******.***
Phone:
Home: *** – 597 – 3097 Mobile: 1-807-***-****
Career Objective
I aim to be a field surveyor and to develop my skills in the technological and computerized field. I aim to contribute to the success of the project and to maintain a good relationship with coworkers.
Skills, Experience and Personal Attributes
Technological skills
I have over 15 years of experience in engineering, road construction and high – rise building surveying, and monitoring surveying. I also have experience in open pit and underground surveying.
Instruments
I am experienced in Topcon, Sokia, Trimble, robotics, Leica GPS and ZNL.
Computer skills
I am familiar with Auto Cad, Auto Cad 3D, Civil Cad, Surpac, Amine Microsurvey and Geocom Vulcan and Deswik.
Education
Equivalent to VCE/ Katzanelson High School, Israel: 4 years.
B.A Social Studies/ Bar Ilan University, Israel: 3 years.
Surveyor Technician/ Vinik institute, Israel: 2 years.
Auto Cad Studies/ Sivan institute, Israel: 6 month.
Mine technician, learning from a distance, Northerrn College (starting in 2020, learning from a distance enable me to work and study. )
Barrick Gold, Hemelo mine in Marathon, open pit surveyor
Feb 2019 – Sep 2019 (the open pit is in process of shutting down, and the volume of the work is minimizing).
Responsibilities – Setting out blast pattern for the open pit mine, pick up for volume calculation, volume calculation by Vulcan, structure monitoring, cut sheet preparing, weekly tailing surveying and report.
Sub Arctic Survey, Yellowknife, surveyor / open pit surveyor
May 2018 – Sep 2018 (seasonal)
Responsibilities - Calculating data from Microsurvey, volume calculation Microsurvey, staking out earth work and road construction work (including asphalt), road construction and construction survey, using Leica GPS and Leica total station, blast pattern setting out, pick up survey (after blast) and volume calculation with Vulcan.
MGI Toronto, surveyor
May 2017 – Mar 2018
Responsibilities- Analyzing data from Civil 3d, staking out earth work and concrete work in various projects in GTA using Trimble GPS, coordinating my activity with foremen and project manager.
Solel Bone International
Aug 16 – June 2017
A 70 km road construction project from Bloleqin in Ivory Coast until the border with Liberia.
Survey manager and party chief
Responsibilities - As a survey manager I had 4 survey groups under my responsibility
(including my own survey group). I coordinated between the requirement of the project and the activities of the all of the survey groups, I also did volume calculation for earth work with Civil Cad and other calculation with Auto Cad.
As a party chief I had 3 men group, and I was staking out and doing topography for earth work and concrete work, using Trimble total station and Trimble GPS.
Monteith & Sutherland, Toronto sub – contracting at Baffinland Mine (Baffin Island) – surveyor/ open pit surveyor
May 2015 –May 2016
Responsibilities – Staking out blast pattern, road construction calculation, road construction layout, structure monitoring and volume calculation with Geocom software. Blast pattern setting out, pick up survey (after blast) and volume calculation with Vulcan.
Toronto Hunt Survey – surveyor
Jan 2014 – Apr 2015
Responsibilities
Construction survey using robotic total station and topography survey using GPS.
Responsibilities
Feb 2011–Sep 2013-underground surveyor
Canickel Mining, Bucko Lake Manitoba – underground surveyor (the mine was shut down)
Responsibilities
Driving lay out production, underground and surface mapping, stockpile mapping, underground drilling setting out, end of month calculation, and mapping and calculating by Amine and Auto Cad. Monitoring jobs on the surface.
Aug 2009 – Oct2010
ArmmiGrinshten, Israel – team leader
Company information
A small surveying office that supplies surveying services to engineering, tunnels, high – rise buildings and road construction projects. Monitoring attached to the projects.
Responsibilities
Setting out in high – rise buildings and light railway, and tunnels projects. Calculating data by Auto Cad. Maintaining control points.
Achievements
There has never been a delay in surveying activities.
November 2008 –Jun 2009
AAMHatch, Whyalla SA, Australia – mine surveyor
OPEN CUT MINE
Responsibilities
Setting out blast pattern for the open pit mine, pick up for volume calculation, volume calculation with Surf pack, structure monitoring.
Achievements
There has never been a delay in surveying activities, and I maintained good relations with my coworkers.
August 2006 – July 2008
McNee Survey, Gladstone QLD, Australia – surveyor /underground surveyor
Weipa QLD – underground surveyor (McNee survey was a subcontractor for the mine in Weipa)
Company information
Family – oriented survey office
Responsibilities
Setting out concrete and earth work by total station and GPS, picking up coal stock piles for volume calculating, I also did volume calculation and other calculation using Civil Cad and Auto Cad
Underground: underground mapping, creating driving layout, volume calculation, reducing data by Auto Cad 3D.
Achievements
Initiating survey activities to speed up the projects.
February 2006 – May 2006
Auspat, Melbourne Australia – surveyor, team leader
Company information
A small size surveyin office, sub-contractor in East link project (highway).
Responsibilities
Setting out earth work with GPS, and picking up detail for volume calculation.
Achievements
There has never been a delay in the projects in terms of surveying.
May 2003 – January 2006
Conrock Ind., Melbourne Australia – surveyor, team leader
Company information
A medium sized building company.
Responsibilities
Setting out grid and other components of 2 buildings, 7 floors each. Setting earth work and concrete work in small projects. Reducing data by Auto Cad.
Achievements
Initiating surveying activities to speed up the projects.
May 2001 – January 2002
Roychman, Israel – surveyor, team leader
Company information
A large engineering and road construction contractor.
Responsibilities
Setting out earth work and asphalt in road construction projects, setting out concrete and earth work in engineering projects, picking up detail for fill and cut calculation, editing data by Auto Cad.
Achievements
Initiating surveying activities to speed up the project (major highway project).
February 1998 – 2000
Drachim, Israel – surveyor, team leader
Company information
A large engineering and construction contractor.
Responsibilities
Setting out earth work and asphalt in road construction project, setting out concrete and earth work in engineering projects, picking up detail for fill and cut calculation, editing data by Auto Cad.
Achievements
Initiating surveying activities to speed up the project (major highway project).
Certificate –WHIMS, FIRST AID