Manager Civil Engineering

Location:
Pakistan
Posted:
January 13, 2021

Contact this candidate

Resume:

Bachelor of Technology in Civil Engineering

COMWAVE Institute, Islamabad, Pakistan

Sarhad University of Information

Technology, Peshawar, Pakistan

Diploma of Associate Engineering, D.A.E. (Civil)

Government Polytechnic Institute, D.I.Khan, P

Peshawar Technical Board, Pakistan

Secondary School Certificate, (S.S.C)

Govt. Wensam College, D.I.Khan, Pakistan

Board of Intermediate & Secondary Education,

Banu, Pakistan

1. MS-Office Complete

2. Revit Architecture

3. AutoCAD 2D & 3D Complete

● Knowledge and Specific Skills in Civil Engineering field.

● Gone through technique of Planning & Development

● Qty Take-off from Revit (BIM) Software

● Strong Multilingual Communication experience.

● Verification of quality of materials at site.

● Assessment and certification of quantities as per work do

● Supervision of method of construction

● Basic understanding and exposure to Project Management principles and QA procedures followed in major projects.

● Computer literate; proficient in MS office.

● Leadership skills, Good communication skills

● Expert in Earthwork software (dongal) for x

● Estimation, Costing, EOT Claim, Execution, Billing, Coordination with Client & Consultant. Senior Quantity Surveyor

https://www.linkedin.com/in/syed

+92-334*******

Haseeb.redco2017

SYED MUHAMMAD HASEEB ALI

WORK EXPERIENCE

17 Years

EXPERIENCE SUMMARY

ME Having more

year in U.A.E

Interchange,

(Design & Build Project) with JV Rizzani De Eccher in Doha, Qatar AGE

38

Professional Qualifications and Affiliations

Bachelor of Technology in Civil Engineering Graduated, April 2007 (2 Years) B-Tech Pass Marks (GPA 3.15/4.0)

Division A+

Diploma of Associate Engineering, D.A.E. (Civil) Graduated, Nov 2003 (3-Years) Government Polytechnic Institute, D.I.Khan, Pakistan Marks 60% Division 1

Graduated, Nov 2003

Marks 62%

ondary Education, Division 1

AutoCAD 2D & 3D Complete.

Engineering field.

Gone through technique of Planning & Development

off from Revit (BIM) Software

Strong Multilingual Communication experience.

Assessment and certification of quantities as per work done. Basic understanding and exposure to Project Management principles and QA procedures followed in Computer literate; proficient in MS office.

Leadership skills, Good communication skills.

Earthwork software (dongal) for x-section

Estimation, Costing, EOT Claim, Execution, Billing, Coordination with Client & Consultant. Senior Quantity Surveyor

https://www.linkedin.com/in/syed-muhammad-haseeb-

+92-334*******, +92-348*******

******.*********@*****.***

SYED MUHAMMAD HASEEB ALI

Career Highlights

EXPERIENCE SUMMARY

Having more than 17 year’s Senior Quantity Surveyor job experience in U.A.E,02 Year Saudi Arabia & 2 Year in Qatar

Interchange, Road & Highway, Infrastructure & HIA Metro Rail Project

(Design & Build Project) with JV Rizzani De Eccher in Doha, Qatar Education

Professional Qualifications and Affiliations

Skills

Tech Pass

Basic understanding and exposure to Project Management principles and QA procedures followed in

-ali-05119338/

job experience (including 02

in Qatar)with construction of

Infrastructure & HIA Metro Rail Project –Fit out

(Design & Build Project) with JV Rizzani De Eccher in Doha, Qatar August 2019 – Till Date

Chief Quantity Surveyor

Crawford Engineering & Real

Punjab, Pakistan

Project: Construction of Road, Interchange, Bridges & Infrastruct

● Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting of IPC

● Preparation of claims, variation order, Deviation order to client for approval

● Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant.

● Monitoring Contractors cost control procedu

the: Design Phase, Construction Phase, Final Account & Defects Maintenance Phase

● Preparing MOU, LOI, Contracts and pricing Change Orders and negotiating agreement with the Client and Sub-contractor as necessary.

● Negotiating contracts with the Sub

and Contracts

● Evaluation all variations, additional works, field changes, additions incorporation of the same with the Monthly Cost reports.

● Preparing and pricing Change Orders and negotiating agreement with the Client and Sub Contractor as necessary.

● Negotiating contracts with the Sub-contractor in partnership with the Contracts Manager.

● Monitoring Contractors cost control procedures throughout the duration of a project including the Construction Phase, Final Account and Defects Maintenance Phase.

● Assist in establishing and maintaining variations a August 2017 – July 2019

Senior Quantity Surveyor

Rizzani de Eccher & Redco International JV, (RnR)

Project: Design & Build of HIA Red Line Qatar Rail Project, Civil, Architecture & MEP Works, Doha

● Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting of IPC

● Preparation of claims, variation order, Deviation order to client for approval

● Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant.

● Milestone regarding Payment Events data collection from Aconex account.

● Monitoring Contractors cost control procedu

the: Design Phase, Construction Phase, Final Account & Defects Maintenance Phase

● Implementing and maintaining all required cost control and audit procedures for all Project Cost Control Activities designed to measure the project status.

● Assessing, evaluation and making recommendations related to any financial claim and providing the necessary input with regards to settling such claims.

● Evaluation all variations, additional works, field changes, additions incorporation of the same with the Monthly Cost reports. Surveyor

ford Engineering & Real Estate (United Kingdome), at Sarai Alamgir – of Road, Interchange, Bridges & Infrastructure of Housing Society Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting order, Deviation order to client for approval

Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant. Monitoring Contractors cost control procedures throughout the duration of the project including the: Design Phase, Construction Phase, Final Account & Defects Maintenance Phase Preparing MOU, LOI, Contracts and pricing Change Orders and negotiating agreement with the contractor as necessary.

gotiating contracts with the Sub-contractor in partnership with the Commercial Manager Evaluation all variations, additional works, field changes, additions and omission, and incorporation of the same with the Monthly Cost reports. Preparing and pricing Change Orders and negotiating agreement with the Client and Sub contractor in partnership with the Commercial Manager and Monitoring Contractors cost control procedures throughout the duration of a project including the Construction Phase, Final Account and Defects Maintenance Phase. Assist in establishing and maintaining variations and claims registers. Redco International JV, (RnR) Doha, Qatar

Design & Build of HIA Red Line Qatar Rail Project, Civil, Architecture & MEP Works, Doha Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting order, Deviation order to client for approval

Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant. Milestone regarding Payment Events data collection from Aconex account. Monitoring Contractors cost control procedures throughout the duration of the project including the: Design Phase, Construction Phase, Final Account & Defects Maintenance Phase Implementing and maintaining all required cost control and audit procedures for all Project Cost ed to measure the project status.

Assessing, evaluation and making recommendations related to any financial claim and providing the necessary input with regards to settling such claims. Evaluation all variations, additional works, field changes, additions and omission, and incorporation of the same with the Monthly Cost reports. Work Experience

– Kharian,

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant. res throughout the duration of the project including Preparing MOU, LOI, Contracts and pricing Change Orders and negotiating agreement with the contractor in partnership with the Commercial Manager and omission, and

Preparing and pricing Change Orders and negotiating agreement with the Client and Sub- Commercial Manager and

Monitoring Contractors cost control procedures throughout the duration of a project including the Design & Build of HIA Red Line Qatar Rail Project, Civil, Architecture & MEP Works, Doha Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting Preparation of EOT (Extension of Time) due to design issue from client and Design Consultant. res throughout the duration of the project including Implementing and maintaining all required cost control and audit procedures for all Project Cost Assessing, evaluation and making recommendations related to any financial claim and providing and omission, and

● Preparing and pricing Change Orders and negotiating agreement with the Client and Sub Contractor as necessary.

● Negotiating contracts with the Sub-contractor in partnership with the Contracts Manager.

● Monitoring Contractors cost control procedures throughout the duration of a project including the Construction Phase, Final Account and Defects Maintenance Phase.

● Assist in establishing and maintaining variations a March 2016– July 2017 (Re-joining)

Senior Quantity Surveyor

National Logistic Cell (NLC)

Site office, New International Islamabad Airport,

Project: Metro Bus Project PKG-IV (4 x Metro Station Project Brief: Project consists of road length of 5.4 Km, It has 3 Lane, width of carriageway 10.95m with 2.5 m TST on Shoulder on each side including 10.4m Metro Bus (MBS) Carriage way.and it has 7 Culverts, 3 Underpass & 02 No's of Bridges. It has Servi

Supply in ROW. The Project has been designed by NESPAK & Supervisory Consultant is M/s Asif Ali & Associates (Pvt) Ltd Engineering Consultants. M/s NLC is the Main Contractor and NHA is the client of the project.

● Preparation and verifying of valuations of works done, Bill of Quantities (BOQ).

● Preparation of BOQ as per drawing provided by the consultant submitted for approval

● Preparation definite quantity survey after approve shop drawings.

● Preparation of Client invoice (IPC) After vetting IPC to issue sub

● Design of grading plan (for super elevation data)

● Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting of IPC

● After vetting IPC Preparation of RAR (Running Account Receipt) for release sub payment.

● Preparation of Monthly Progress Report, Provision of Financial S Monitoring Report, Weekly Progress Report submit to Client copy to : our head quarter & Consultant.

● Attend the monthly meeting with client consultant to discussed planned and achieved targets.

● Preparation of claims, variation order, Deviation order to client for approval.

● Assist the Project Manager in all matters relating to the financial project.

● Participate, record and assist in the preparation of the minutes of the progress meetings.

● Provide support on all financial and contractual matters throughout the course of the work in the project.

● Preparation of shop drawings as per site requirements and submit to client for approval.

● Preparation of detail estimates & Design to submit client for approval. September 2014 – February 2016

Senior Quantity Surveyor

AL FAHD COMPANY,

Head Office, AL-Qassim, Saudi Arabia

Project: Infrastructure, Highway & Bridges, Project detail as under: 1. (KING ABDULLAH INTERCHANGE & NORTH ZUGAIBIYAH INTERCHANGE) LENGTH= 25KM Preparing and pricing Change Orders and negotiating agreement with the Client and Sub contractor in partnership with the Commercial Manager and Monitoring Contractors cost control procedures throughout the duration of a project including the Construction Phase, Final Account and Defects Maintenance Phase. Assist in establishing and maintaining variations and claims registers. Senior Quantity Surveyor (SQS)

National Logistic Cell (NLC)

Site office, New International Islamabad Airport,

IV (4 x Metro Station Civil & Arch), Islamabad

Project consists of road length of 5.4 Km, It has 3 Lane, width of carriageway 10.95m with 2.5 m TST on Shoulder on each side including 10.4m Metro Bus (MBS) Carriage way.and it has 7 Culverts, 3 Underpass & 02 No's of Bridges. It has Service duct i.e Telephone, Electricity, Sewerage & Water Supply in ROW. The Project has been designed by NESPAK & Supervisory Consultant is M/s Asif Ali & Associates (Pvt) Ltd Engineering Consultants. M/s NLC is the Main Contractor and NHA is the client of Preparation and verifying of valuations of works done, Bill of Quantities (BOQ). Preparation of BOQ as per drawing provided by the consultant submitted for approval Preparation definite quantity survey after approve shop drawings. of Client invoice (IPC) After vetting IPC to issue sub-contractor payment/invoice Design of grading plan (for super elevation data)

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting Preparation of RAR (Running Account Receipt) for release sub- Preparation of Monthly Progress Report, Provision of Financial S-Curve Report, Monthly Monitoring Report, Weekly Progress Report submit to Client copy to : our head quarter & Attend the monthly meeting with client consultant to discussed planned and achieved targets. Preparation of claims, variation order, Deviation order to client for approval. Assist the Project Manager in all matters relating to the financial and contractual aspects of the Participate, record and assist in the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the op drawings as per site requirements and submit to client for approval. Preparation of detail estimates & Design to submit client for approval.

(SQS)

, Saudi Arabia

Highway & Bridges, Project detail as under: -

(KING ABDULLAH INTERCHANGE & NORTH ZUGAIBIYAH INTERCHANGE) LENGTH= 25KM Preparing and pricing Change Orders and negotiating agreement with the Client and Sub- Commercial Manager and

Monitoring Contractors cost control procedures throughout the duration of a project including the Project consists of road length of 5.4 Km, It has 3 Lane, width of carriageway 10.95m with 2.5 m TST on Shoulder on each side including 10.4m Metro Bus (MBS) Carriage way.and it has 7 Culverts, ce duct i.e Telephone, Electricity, Sewerage & Water Supply in ROW. The Project has been designed by NESPAK & Supervisory Consultant is M/s Asif Ali & Associates (Pvt) Ltd Engineering Consultants. M/s NLC is the Main Contractor and NHA is the client of contractor payment/invoice

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting

-contractor

Curve Report, Monthly

Monitoring Report, Weekly Progress Report submit to Client copy to : our head quarter & Attend the monthly meeting with client consultant to discussed planned and achieved targets. and contractual aspects of the

Participate, record and assist in the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the op drawings as per site requirements and submit to client for approval. 2. QASSIM AIRPORT ROAD: LENGTH = 15 KM

3. Interchange # 1 LENGTH= 22KM

4. Interchange # 2 LENGTH= 20KM

5. Interchange # 4 LENGTH= 45KM

● Responsible for the proper implementation of Company Standard Operating Procedures (SOPs) in Quantity & Design Section and providing guidance to Surveyors on proper implementation in the field as well.

● Preparation and verifying of valuations of works done, Bill of Quantities (BOQ).

● Preparation of BOQ as per drawing provided by the consultant submitted for approval

● Preparation definite quantity survey after approve shop drawings.

● Preparation of Client invoice (IPC) After vetting IPC to issue sub

● Design of grading plan (for super elevation data)

● Earth work calculation (Road X-Section) (with dongle software)

● Preparation of Interim Payment Certificate (IPC) to Consultant for pay of IPC.

● Report, Weekly Progress Report submit to Client copy to : our head quarter & Consultant.

● Attend the monthly meeting with client consultant to discussed planned and achieved targets.

● Preparation of claims, variation order, Deviation order to client for approval.

● Assist the Project Manager in all matters relating to the financial and contractual aspects of the project.

● Participate, record and assist in the preparation of the minutes of the progress meetings.

● Provide support on all financial and contractual matters throughout the course of the work in the project.

● Preparation of shop drawings as per site requirements and submit to client for approval.

● Preparation of detail estimates & Design to submit client for appro September 2012 – August 2014

Senior Quantity Surveyor

National Logistic Cell (NLC)

HQ Engrs. NLC, Sowan Camp, Rawalpindi, Pakistan

Project: Metro Bus Project PKG-II, Elevated Portion, 3 x Station Rawalpindi

● Preparation and verifying of valuations of works done, Bill of Quantities (BOQ).

● Preparation of BOQ as per drawing provided by the consultant submitted for approval

● Preparation definite quantity survey after approve shop drawings.

● Preparation of Client invoice (IPC) After vetting I

● Design of grading plan (for super elevation data)

● Earth work calculation (Road X-Section) (with dongle software)

● Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting of IPC

● After vetting IPC Preparation of RAR (Running Account Receipt) for release sub payment.

● Preparation of Monthly Progress Report, Provision of Financial S Monitoring Report, Weekly Progress Report submit to Client copy t Consultant.

● Preparation of claims, variation order, Deviation order to client for approval. QASSIM AIRPORT ROAD: LENGTH = 15 KM

Responsible for the proper implementation of Company Standard Operating Procedures (SOPs) in Quantity & Design Section and providing guidance to Surveyors on proper implementation in the Preparation and verifying of valuations of works done, Bill of Quantities (BOQ). Preparation of BOQ as per drawing provided by the consultant submitted for approval Preparation definite quantity survey after approve shop drawings. invoice (IPC) After vetting IPC to issue sub-contractor payment/invoice Design of grading plan (for super elevation data)

Section) (with dongle software)

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting Report, Weekly Progress Report submit to Client copy to : our head quarter & Consultant. Attend the monthly meeting with client consultant to discussed planned and achieved targets. r, Deviation order to client for approval.

Assist the Project Manager in all matters relating to the financial and contractual aspects of the Participate, record and assist in the preparation of the minutes of the progress meetings. support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. Preparation of detail estimates & Design to submit client for approval. Senior Quantity Surveyor (SQS)

National Logistic Cell (NLC)

HQ Engrs. NLC, Sowan Camp, Rawalpindi, Pakistan

II, Elevated Portion, 3 x Station Rawalpindi

f valuations of works done, Bill of Quantities (BOQ). Preparation of BOQ as per drawing provided by the consultant submitted for approval Preparation definite quantity survey after approve shop drawings. Preparation of Client invoice (IPC) After vetting IPC to issue sub-contractor payment/invoice Design of grading plan (for super elevation data)

Section) (with dongle software)

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting After vetting IPC Preparation of RAR (Running Account Receipt) for release sub- Preparation of Monthly Progress Report, Provision of Financial S-Curve Report, Monthly Monitoring Report, Weekly Progress Report submit to Client copy to: our head quarter & Preparation of claims, variation order, Deviation order to client for approval. Responsible for the proper implementation of Company Standard Operating Procedures (SOPs) in Quantity & Design Section and providing guidance to Surveyors on proper implementation in the contractor payment/invoice

ment release after vetting

Report, Weekly Progress Report submit to Client copy to : our head quarter & Consultant. Attend the monthly meeting with client consultant to discussed planned and achieved targets. Assist the Project Manager in all matters relating to the financial and contractual aspects of the Participate, record and assist in the preparation of the minutes of the progress meetings. support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. contractor payment/invoice

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting

-contractor

Curve Report, Monthly

o: our head quarter &

● Assist the Project Manager in all matters relating to the financial and contractual aspects of the project.

● Participate, record and assist in the preparation of the minutes of the progress meetings.

● Provide support on all financial and contractual matters throughout the course of the work in the project.

● Preparation of shop drawings as per site requirements and submit to client for approval.

● Preparation of detail estimates & Design to submit client for approval. February 2010 – August 2012

Project Engineer/Quantity Surveyor

Alaberah Elect &Mech Works Est,

Abu Dhabi, U.A.E

Responsibilities:

1. Physical Survey.

● Complete survey for preparation of estimate before starting the project and bill submitted to the client.

2. Supervision

● Civil work (Excavation and Back Filling, Concrete for Gate Cut or Road Cut)

● Duct laying

● Cable pulling

● OFC Jointing & Testing

3. P r eparation Contractor B i l ls

● Sub contractor work finalization.

● Monthly interim valuation and certifying sub contractor payment certificate

● Preparation of measurement sheets for the work completed.

● Preparationand verifying of valuations of works done, Bill of Quantitie November 2003 – January 2010

Quantity Surveyor

National Logistic Cell (NLC)

HQ Engrs. NLC, Sowan Camp, Rawalpindi, Pakistan

Project: Development of Infrastructure, Roads & Bridges of

● Preparation and verifying of valuations of works done, Bill of Quantities (BOQ).

● Preparation of BOQ as per drawing provided by the consultant submitted for approval

● Preparation definite quantity survey after approve shop drawings.

● Preparation of Client invoice (IPC) After vetting I

● Design of grading plan (for super elevation data)

● Earth work calculation (Road X-Section) (with dongle software)

● Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting of IPC

● After vetting IPC Preparation of RAR (Running Account Receipt) for release sub payment.

● Preparation of Monthly Progress Report, Provision of Financial S Monitoring Report, Weekly Progress Report submit to Client copy t Assist the Project Manager in all matters relating to the financial and contractual aspects of the n the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. Preparation of detail estimates & Design to submit client for approval.

/Quantity Surveyor

Alaberah Elect &Mech Works Est,

estimate before starting the project and bill submitted to the Civil work (Excavation and Back Filling, Concrete for Gate Cut or Road Cut) C ontractor B i l l s

Monthly interim valuation and certifying sub contractor payment certificate Preparation of measurement sheets for the work completed. Preparationand verifying of valuations of works done, Bill of Quantities National Logistic Cell (NLC)

HQ Engrs. NLC, Sowan Camp, Rawalpindi, Pakistan

Roads & Bridges of Defense Housing Authority Islamabad f valuations of works done, Bill of Quantities (BOQ). Preparation of BOQ as per drawing provided by the consultant submitted for approval Preparation definite quantity survey after approve shop drawings. Preparation of Client invoice (IPC) After vetting IPC to issue sub-contractor payment/invoice Design of grading plan (for super elevation data)

Section) (with dongle software)

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting After vetting IPC Preparation of RAR (Running Account Receipt) for release sub- Preparation of Monthly Progress Report, Provision of Financial S-Curve Report, Monthly Monitoring Report, Weekly Progress Report submit to Client copy to: our head quarter & Assist the Project Manager in all matters relating to the financial and contractual aspects of the n the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. estimate before starting the project and bill submitted to the Islamabad (DHAI)

contractor payment/invoice

Preparation of Interim Payment Certificate (IPC) to Consultant for payment release after vetting

-contractor

Curve Report, Monthly

o: our head quarter &

● Preparation of claims, variation order, Deviation order to client for approval.

● Assist the Project Manager in all matters relating to the financial and contractual aspects of the project.

● Participate, record and assist in the preparation of the minutes of the progress meetings.

● Provide support on all financial and contractual matters throughout the course of the work in the project.

● Preparation of shop drawings as per site requirements and submit to client for approval.

● Preparation of detail estimates & Design to submit client for approval. Read

Write

English Excellent Excellent

Urdu Excellent Excellent

Arabic Excellent Excellent

Father’s Name: Syed Farhat Hussain Zaidi

Birthday: August 21, 1981

Gender: Male

Valid driving License from KSA. (Till Valid: 26

Valid driving License from Pakistan

Declaration

I, Syed Muhammad Haseeb Ali, hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.

Syed Muhammad Haseeb Ali

Preparation of claims, variation order, Deviation order to client for approval. Assist the Project Manager in all matters relating to the financial and contractual aspects of the n the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. Preparation of detail estimates & Design to submit client for approval. Write

Speak

Compose

Excellent Very Good Excellent

Excellent Excellent Excellent

Excellent Excellent Excellent

Syed Farhat Hussain Zaidi Marital Status: Married

Nationality: Pakistani

Valid driving License from KSA. (Till Valid: 26-Dec-2019) I, Syed Muhammad Haseeb Ali, hereby declare that the information contained herein is true and correct Islamabad, Pakistan

August, 2020

Languages

Personal Details

Driving license

Assist the Project Manager in all matters relating to the financial and contractual aspects of the n the preparation of the minutes of the progress meetings. Provide support on all financial and contractual matters throughout the course of the work in the Preparation of shop drawings as per site requirements and submit to client for approval. I, Syed Muhammad Haseeb Ali, hereby declare that the information contained herein is true and correct